| 1 | 1 | (1) PCC road from main road to Rajendra Rabidas/Tribhuwan mandal House \nLabour for clearing the road surface and removing roots of trees, shurbs all complete job as per specification and direction of E/I all complete job. | | 30 | Each |
|---|
| 2 | 2 | Supplying and laying good quality of Stone Metal Packing filter (20mm to 63mm size) in the rock toe, heel trenches, toe drain as per design and drawing including the cost of material, royalty all taxes etc but excluding the cost of carriage all complete job as per specification and direction of E/I all complete job. (8.6.3) | | 23.364 | /M3 |
|---|
| 3 | 3 | Providing PCC M-100 with nominal mix of (1:3:6) in Foundation with approved quality of stone metal grade-III (50mm to 25mm size) clean coarse sand of F.M 2.5 to 3 including screening, shuttering, mixing cement concrete in mixer and placing in position, vibrating, striking, curing, taxes and royalty all complete job as per specification and direction of E/I. (5.3.3) | | 3.504 | /M3 |
|---|
| 4 | 4 | Providing PCC M-150 with nominal mix of (1:2:4) in Foundation and plinth with approved quality of stone Chips (20mm to 6mm size graded and clean coarse sand of F.M 2.5 to 3 including screening, shuttering, mixing cement concrete in mixer and placing in position, vibrating, striking, curing, taxes and royalty all complete job as per specification and direction of E/I. (5.3.2) | | 31.86 | /M3 |
|---|
| 5 | 5 | Earth work filing in flanks in road fuly compacted and fine dressed with earh obtained after cutting within a lead of 50M and lift of 1.5 all complete job as per specification and direction of E/I all complete job. | | 15 | Each |
|---|
| 6 | 6 | Carriage of Materials\nStone Metal (Lead 20 KM) | | 26.655 | /M3 |
|---|
| 7 | 6.01 | Sand (Lead 30 KM) | | 17.34 | /M3 |
|---|
| 8 | 6.02 | Stone Chips( Lead 15 KM) | | 28.65 | /M3 |
|---|
| 9 | 6.03 | Cement (Lead 10 KM) | | 12.75 | /M3 |
|---|
| 10 | 7 | (2) PCC at Subhash Nagar tola from Soren house to Bimal paul house\nLabour for clearing the road surface do----do---all complete job as per specification and direction of E/I all complete job. | | 10 | Each |
|---|
| 11 | 8 | Supplying and laying good quality of Stone Metal Packing filter (20mm to 63mm size) in the rock toe, heel trenches, toe drain as per design and drawing including the cost of material, royalty all taxes etc but excluding the cost of carriage all complete job as per specification and direction of E/I all complete job. (8.6.3) | | 7.788 | /M3 |
|---|
| 12 | 9 | Providing PCC M-100 with nominal mix of (1:3:6) in Foundation with approved quality of stone metal grade-III (50mm to 25mm size) clean coarse sand of F.M 2.5 to 3 including screening, shuttering, mixing cement concrete in mixer and placing in position, vibrating, striking, curing, taxes and royalty all complete job as per specification and direction of E/I. (5.3.3) | | 1.168 | /M3 |
|---|
| 13 | 10 | Providing PCC M-150 with nominal mix of (1:2:4) in Foundation and plinth with approved quality of stone Chips (20mm to 6mm size graded and clean coarse sand of F.M 2.5 to 3 including screening, shuttering, mixing cement concrete in mixer and placing in position, vibrating, striking, curing, taxes and royalty all complete job as per specification and direction of E/I. (5.3.2) | | 10.62 | /M3 |
|---|
| 14 | 11 | Earth work filing in flanks in road fuly compacted and fine dressed with earh obtained after cutting within a lead of 50M and lift of 1.5 all complete job as per specification and direction of E/I all complete job. | | 5 | Each |
|---|
| 15 | 12 | Carriage of Materials\nStone Metal (Lead 20 KM) | | 8.885 | /M3 |
|---|
| 16 | 12.01 | Sand (Lead 30 KM) | | 5.78 | /M3 |
|---|
| 17 | 12.02 | Stone Chips( Lead 30 KM) | | 9.55 | /M3 |
|---|
| 18 | 12.03 | Cement (Lead 10 KM) | | 4.25 | /M3 |
|---|
| 19 | 13 | (3) PCC at Sikline tola from Shiva Vishwkarma house to Basudev Chourasia\nLabour for clearing the road surface do----do---all complete job as per specification and direction of E/I all complete job. | | 20 | Each |
|---|
| 20 | 14 | Supplying and laying good quality of Stone Metal Packing filter (20mm to 63mm size) in the rock toe, heel trenches, toe drain as per design and drawing including the cost of material, royalty all taxes etc but excluding the cost of carriage all complete job as per specification and direction of E/I all complete job. (8.6.3) | | 15.576 | /M3 |
|---|
| 21 | 15 | Providing PCC M-100 with nominal mix of (1:3:6) in Foundation with approved quality of stone metal grade-III (50mm to 25mm size) clean coarse sand of F.M 2.5 to 3 including screening, shuttering, mixing cement concrete in mixer and placing in position, vibrating, striking, curing, taxes and royalty all complete job as per specification and direction of E/I. (5.3.3) | | 2.336 | /M3 |
|---|
| 22 | 16 | Providing PCC M-150 with nominal mix of (1:2:4) in Foundation and plinth with approved quality of stone Chips (20mm to 6mm size graded and clean coarse sand of F.M 2.5 to 3 including screening, shuttering, mixing cement concrete in mixer and placing in position, vibrating, striking, curing, taxes and royalty all complete job as per specification and direction of E/I. (5.3.2) | | 21.24 | /M3 |
|---|
| 23 | 17 | Earth work filing in flanks in road fuly compacted and fine dressed with earh obtained after cutting within a lead of 50M and lift of 1.5 all complete job as per specification and direction of E/I all complete job. | | 10 | Each |
|---|
| 24 | 18 | Carriage of Materials\nStone Metal (Lead 20 KM) | | 17.77 | /M3 |
|---|
| 25 | 18.01 | Sand (Lead 30 KM) | | 11.56 | /M3 |
|---|
| 26 | 18.02 | Stone Chips( Lead 30 KM) | | 19.1 | /M3 |
|---|
| 27 | 18.03 | Cement (Lead 10 KM) | | 8.5 | /M3 |
|---|
| 28 | 19 | (4) PCC from main Bablulal Hansda field to Sonaram Murmu house\nLabour for clearing the road surface do----do---all complete job as per specification and direction of E/I all complete job. | | 30 | Each |
|---|
| 29 | 20 | Supplying and laying good quality of Stone Metal Packing filter (20mm to 63mm size) in the rock toe, heel trenches, toe drain as per design and drawing including the cost of material, royalty all taxes etc but excluding the cost of carriage all complete job as per specification and direction of E/I all complete job. (8.6.3) | | 23.364 | /M3 |
|---|
| 30 | 21 | Providing PCC M-100 with nominal mix of (1:3:6) in Foundation with approved quality of stone metal grade-III (50mm to 25mm size) clean coarse sand of F.M 2.5 to 3 including screening, shuttering, mixing cement concrete in mixer and placing in position, vibrating, striking, curing, taxes and royalty all complete job as per specification and direction of E/I. (5.3.3) | | 3.504 | /M3 |
|---|
| 31 | 22 | Providing PCC M-150 with nominal mix of (1:2:4) in Foundation and plinth with approved quality of stone Chips (20mm to 6mm size graded and clean coarse sand of F.M 2.5 to 3 including screening, shuttering, mixing cement concrete in mixer and placing in position, vibrating, striking, curing, taxes and royalty all complete job as per specification and direction of E/I. (5.3.2) | | 31.86 | /M3 |
|---|
| 32 | 23 | Earth work filing in flanks in road fuly compacted and fine dressed with earh obtained after cutting within a lead of 50M and lift of 1.5 all complete job as per specification and direction of E/I all complete job. | | 15 | Each |
|---|
| 33 | 24 | Carriage of Materials\nStone Metal (Lead 20 KM) | | 26.655 | /M3 |
|---|
| 34 | 24.01 | Sand (Lead 30 KM) | | 17.34 | /M3 |
|---|
| 35 | 24.02 | Stone Chips( Lead 30 KM) | | 28.65 | /M3 |
|---|
| 36 | 24.03 | Cement (Lead 10 KM) | | 12.75 | /M3 |
|---|
| 37 | 25 | Goods & Service Tax (G.S.T.) - | BI01010001010000000000000515BI0100001150 | 753083 | Rs. |
|---|
| 38 | 26 | Labour Cess - | BI01010001010000000000000515BI0100001151 | 843453 | Rs. |
|---|