Irrigation And Public Health Department has published Construction Of Check Dams And Dykes On Various Khads Nallah In Bhoranj Constituency In Tehsil Bhoranj , Distt . Hamirpur Hp Consultancy Service For Survey Investigation For Prepration Of Detail Project Report Including Feasibility Studies Etc . Co. Submission Date for this Tender is 23-10-2019. Check Dam Tenders in EE IPH Bhoranj Himachal Pradesh. Bidders can get complete Tender details and download the document.
Name of Work: C/O Check Dams and Dykes on various Khads/ Nallah in Bhoranj constituency in Tehsil Bhoranj, Distt. Hamirpur HP (SH: Consultancy service for Survey & Investigation for prepration of detail project report including feasibility studies etc. complete in all respect) | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1.01 | Preparation of detailed project report (DPR) for Construction of Check Dams and Dykes on various khad in Bhoranj Constituency, Tehsil Bhoranj, Distt. Hamirpur HP with suitable provision of spillway, wing walls, de-silting sluice gate, detailed hydraulic design & design calculations, cost estimations complete including the detailed study of all related parameters given in the following check list. (List of Khad of Nallahs enclosed). | BI01010001010000000000000515BI0100001113 | ||
2 | 1.02 | C/O Check Dam | BI01010001010000000000000515BI0100001114 | 5 | Nos |
3 | 1.03 | C/O Dyke | BI01010001010000000000000515BI0100001115 | 10 | Nos |
4 | 1.04 | Check List:-The Report shall be presented covering the following parameters. | BI01010001010000000000000515BI0100001113 | ||
5 | 1.05 | i) Introduction | BI01010001010000000000000515BI0100001114 | ||
6 | 1.06 | ii)Salient features | BI01010001010000000000000515BI0100001115 | ||
7 | 1.07 | iii)Physical features | BI01010001010000000000000515BI0100001113 | ||
8 | 1.08 | iv) General Investigations (Social, Climate, Geological, Population & other details. | BI01010001010000000000000515BI0100001114 | ||
9 | 1.09 | v) Hydrological studies & water resources. | BI01010001010000000000000515BI0100001115 | ||
10 | 1.1 | vi) Design features. | BI01010001010000000000000515BI0100001113 | ||
11 | 1.11 | vii) Construction Material & Construction Programme. | BI01010001010000000000000515BI0100001114 | ||
12 | 1.12 | viii) Envioronmental & ecological studies:- The rates are including of Environment Impact Assessment (EIA) or Environment and ecological studies and clearance from concerned departments if required. | BI01010001010000000000000515BI0100001115 | ||
13 | 1.13 | Following data needs to be collected from various department. | BI01010001010000000000000515BI0100001113 | ||
14 | 1.14 | a)Meteorological data in catchment area of source and command area of project from meteorological department | BI01010001010000000000000515BI0100001114 | ||
15 | 1.15 | b) Soil investigation survey has to be got conducted for assertaining Bearing Capacity of soil for construction of various civil structures. | BI01010001010000000000000515BI0100001115 | ||
16 | 1.16 | c) Geological investigation from state geologist/any other agency in respect of DAM. | BI01010001010000000000000515BI0100001113 | ||
17 | 1.17 | Detailed Project Report (DPR) should contains the followings | BI01010001010000000000000515BI0100001114 | ||
18 | 1.18 | Volume-I | BI01010001010000000000000515BI0100001115 | ||
19 | 1.19 | i)History | BI01010001010000000000000515BI0100001113 | ||
20 | 1.2 | ii) Salient features | BI01010001010000000000000515BI0100001114 | ||
21 | 1.21 | iii) Physical features | BI01010001010000000000000515BI0100001115 | ||
22 | 1.22 | iv) General Investigations (Social, Climate, Geological, Population & other details. | BI01010001010000000000000515BI0100001113 | ||
23 | 1.23 | v) Design features. | BI01010001010000000000000515BI0100001114 | ||
24 | 1.24 | vi)Design of main components of the project. Keeping in view all the external forces including wind, land slide, earth quake etc. | BI01010001010000000000000515BI0100001115 | ||
25 | 1.25 | vii) Construction Material & Construction Programme. | BI01010001010000000000000515BI0100001113 | ||
26 | 1.26 | viii) Environment & ecological studies and clearance from concerned department | BI01010001010000000000000515BI0100001114 | ||
27 | 1.27 | xi) Revenue record if required. | BI01010001010000000000000515BI0100001115 | ||
28 | 1.28 | Drawings. :- | BI01010001010000000000000515BI0100001114 | ||
29 | 1.29 | i) Key plan on 100 m grid and contour plan ( C.I =2.0m) on the scale 1:15000 (Detailed Topographical survey & contour plan (C.I = 1.0m) on 30mx30m grid at the scale 1:1000 Surveyed and prepared with the help of total station & shall be presented in auto CAD as Soft copy along with prints. | BI01010001010000000000000515BI0100001115 | ||
30 | 1.3 | ii). Any item required in addition to above for preparation of Detailed Project Report (DPR). | BI01010001010000000000000515BI0100001113 | ||
31 | 1.31 | Volume-2 | BI01010001010000000000000515BI0100001114 | ||
32 | 1.32 | i)General Abstract of Cost. | BI01010001010000000000000515BI0100001115 | ||
33 | 1.33 | ii)Sub head wise abstract of cost & detail of measurements. | BI01010001010000000000000515BI0100001113 | ||
34 | 1.34 | iii) Basic rates of material & labour | BI01010001010000000000000515BI0100001114 | ||
35 | 1.35 | iv) carriage of material by mechanical transport & mannual | BI01010001010000000000000515BI0100001115 | ||
36 | 1.36 | v) Analysis of rates | BI01010001010000000000000515BI0100001113 |