K Sltf- 2019-20 - Or - Urgent Patch Repair By Providing Bit Chipping Carpet Andallied Works To Ayamkudi Mannar Road Ch . 2/000 To 3/500 Km Provision For Providing BitOpengraded Premix Chipping Carpet , Pot Hole Filling With 36Mm MetalAnd 12Mm Metal
Tender Overview
Project Description
K Sltf- 2019-20 - Or - Urgent Patch Repair By Providing Bit Chipping Carpet Andallied Works To Ayamkudi Mannar Road Ch . 2 / 000 To 3 / 500 Km Provision For Providing Bit Opengraded Premix Chipping Carpet , Pot Hole Filling With 36Mm Metal And 12Mm Metal And Removalof Excess Soil From The Shoulder Etc
BOQ
| Work Name:SLTF- 2019-20 - OR - Urgent Patch repair By Providing Bit Chipping Carpet andallied works to Ayamkudi Mannar road ch. 2/000 to 3/500 km | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Patch work | BI01010001010000000000000515BI0100001113 | ||
| 2 | 1.01 | 55.4 : Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.Supplying and stacking 36mm size hard broken stone in standard heaps for measurement. | BI01010001010000000000000515BI0100001114 | 12 | cum |
| 3 | 1.02 | 55.2 : Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a) | BI01010001010000000000000515BI0100001115 | 59.835 | cum |
| 4 | 1.03 | 55.3 : Supplying and stacking 6mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)Supplying and stacking 6mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a) | BI01010001010000000000000515BI0100001116 | 18.945 | cum |
| 5 | 1.04 | 55.8.a : Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface. | BI01010001010000000000000515BI0100001117 | 12 | cum |
| 6 | 1.05 | od21306/2019_2020 : Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface. | BI01010001010000000000000515BI0100001118 | 3 | cum |
| 7 | 1.06 | 55.1.a : Providing, laying and rolling of open graded premix carpet of 20 mm thickness with 0.27 cum of 12 mm departmental aggregates premixed with 12.96 kg of bitumen per 10 sqm using penetration grade bitumen to required line, grade and level on a previously prepared base, after priming the existing surface with 5 kg of bitumen (VG 30) 10 sqm including mixing in a suitable plant, laying and rolling with a three wheel static roller of 80-100 KN capacity, finished to required level and grades,followed by a seal coat of 0.09 cum of 6 mm departmental aggregates premixed with 8.64 kg of bitumen per 10 sqm. <br>\nBy Manual Means.Providing, laying and rolling of open graded premix carpet of 20 mm thickness with 0.27 cum of 12 mm departmental aggregates premixed with 12.96 kg of bitumen per 10 sqm using penetration grade bitumen to required line, grade and level on a previously prepared base, after priming the existing surface with 5 kg of bitumen (VG 30) 10 sqm including mixing in a suitable plant, laying and rolling with a three wheel static roller of 80-100 KN capacity, finished to required level and grades,followed by a seal coat of 0.09 cum of 6 mm departmental aggregates premixed with 8.64 kg of bitumen per 10 sqm. By Manual Means. | BI01010001010000000000000515BI0100001119 | 2105 | sqm |
| 8 | 1.07 | 10.3 : Maintenance of Earth Shoulder (stripping excess soil) from the shoulder surface to achieve the approved level and compacting with plate compactorMaintenance of Earth Shoulder (stripping excess soil) from the shoulder surface to achieve the approved level and compacting with plate compactor | BI01010001010000000000000515BI0100001120 | 605 | sqm |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender