Madhya Pradesh Madhya Kshetra Vidyut Vitaran Company Limited-MPMKVVCL has published Estimate Shifting Of Lt Line And Proposed 11 Kv Line At Proposed Kendriya Vidhyalay, Mohi Under Joulkheda D/C. Submission Date for this Tender is 11-10-2019. Insulated Box Tenders in DGM STC BETUL Madhya Pradesh. Bidders can get complete Tender details and download the document.
Name of Work: Estimate Shifting of LT Line and proposed 11 KV Line at proposed Kendriya Vidhyalay, Mohi under Joulkheda D/c | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1.01 | 140 Kg., 8.0 Mtrs. Long PCC Poles | 7 | NO. | |
2 | 1.02 | D.C. Cross arms 4' centre to centre (100X50x6 mm.) channel | 1 | Set | |
3 | 1.03 | D.C cross-arm 8' Channel (100x50x6 mm) | 1 | Set | |
4 | 1.04 | D.O. Mounting channel 75x40x6 mm | 3 | No. | |
5 | 1.05 | 11 KV Guarding channel 75x40x6 mm | 4 | Set | |
6 | 1.06 | 11 Kv.Polymer Lightning arrestors Gapless Type | 3 | No. | |
7 | 1.07 | 11 KV Top Clamp for 65x65x6 mm. angle type | 1 | No. | |
8 | 1.08 | 11 KV Bridling top clamps 65x65x6mm | 6 | No. | |
9 | 1.09 | Jointing Sleeves Suitable for Rabbite (100 Sq. mm Al. Eq) AAAC Conductor | 40 | No. | |
10 | 1.1 | 11 KV Bridling cross arms 65x65x6mm | 6 | No. | |
11 | 1.11 | Transformer mounting channel (100 x 50 x 6 mm.) | 1 | Set | |
12 | 1.12 | Trans.Mounting with Belting with 50X50X6 mm.angle with two cross fixing channel | 1 | No | |
13 | 1.13 | Red oxide paint | 8.13 | Ltr. | |
14 | 1.14 | Aluminium paint | 8.13 | Ltr. | |
15 | 1.15 | Anti climbing devices | 10 | NO. | |
16 | 1.16 | Danger Boards Enamalled Type 11 KV | 9 | NO. | |
17 | 1.17 | Aluminium Binding wire and tepe | 17 | Kg, | |
18 | 1.18 | M.S. Nut and Bolts | 44 | Kg. | |
19 | 1.19 | 11 KV V Cross arm 65x65x6 mm. angle type | 1 | NO. | |
20 | 1.2 | Back clamp for 140 Kg. PCC pole MS Flat 50x6mm | 8 | No. | |
21 | 1.21 | Bracin/Support angle of 65x65x6 mm for 4' (1.2) center DP | 1 | Set | |
22 | 1.22 | Back Filling of poles with Boulders. | 4 | No | |
23 | 1.23 | Clamp for 140 Kg. PCC pole MS Flat 50x6mm | 16 | Set | |
24 | 1.24 | Earthing for PCC Pole 4.00 mm-8 SWG G.I wire-0.8 Kg. per pole | 0.8 | Kg. | |
25 | 1.25 | Earthing for PCC Pole 4.00 mm-8 SWG G.I wire-0.8 Kg. per pole | 0.8 | Kg. | |
26 | 1.26 | Earthing Set (DTR Earthing) 40mm,3 Meter GI Pipe Gi Wite , Earthing clmap & Nut Bolt | 1 | Set | |
27 | 1.27 | LT XLPE Cable Aerial Bunch 3x50+1x16+1x35 spmm 1100 Volts | 0.16 | Km. | |
28 | 1.28 | Earthing coil of 115 Turns of 50 mm.Dia and 2.5 Mtr. lead of 4.0 MM G.I. wire | 11 | NO. | |
29 | 1.29 | Concreting of stay (20 mm/25 mm) @ 0.3 Cmt. Per stay | 1.8 | Cmt. | |
30 | 1.3 | Concreting of stay (16 mm/12 mm) @ 0.2 Cmt. Per stay | 2 | Cmt. | |
31 | 1.31 | Concreting of PCC Pole @ 0.45 cmt. (Cubic Metric Tan) Per Pole | 1.05 | Cmt. | |
32 | 1.32 | Concreting of Rail / Hbeam supports @0.65 Cmt.per pole including muffing of pole | 3.9 | Cmt. | |
33 | 1.33 | Bi- metallic clamp Distribution Transfrmers Bushing | 3 | NO. | |
34 | 1.34 | Bi- metallic clamp suitable for 12 mm dia stud and 80 sqmm AAAC | 4 | NO. | |
35 | 1.35 | A.B Cable hanging clamps/ tension clamps (Glvanized) as per enclosed Drawing | 3 | NO. | |
36 | 1.36 | Stay complete, without Stay wire set 16 mm (Painted) | 8 | No. | |
37 | 1.37 | Stay complete, without Stay wire set 16 mm (Painted) | 2 | No. | |
38 | 1.38 | Stay complete, without Stay wire set 20 mm (Painted) | 6 | No. | |
39 | 1.39 | G.I Wires 5.0 mm (6 SWG) | 100 | Kg. | |
40 | 1.4 | G.I Wires 4.0 mm (8 SWG) | 48 | Kg. | |
41 | 1.41 | I. Bolts 16 mm | 32 | No. | |
42 | 1.42 | Spring loaded CP multi conn bus-bar in insulated box Three Phase 1 in 3 out | 1 | No. | |
43 | 1.43 | Piercing connector Type-I for 1P/3P (Main 16-50 sqmm tap-off 16-50 sqmm) | 9 | No. | |
44 | 1.44 | Piercing connector Type-II (Main 16-50 sqmm tap-off 16-50 sqmm) | 6 | No. | |
45 | 1.45 | LT Distribution box with Isolator & HRC fuse - 63 KVA DTR (200A & 6 SP of 60A) | 1 | No. | |
46 | 1.46 | Stay Insulators 90X65mm | 8 | No. | |
47 | 1.47 | H.Beam Clamps 65x8mm Flat | 6 | Pairs | |
48 | 1.48 | H.Beam Back Clamps 65x8mm Flat(in Numbers) | 12 | No. | |
49 | 1.49 | Supension Clamp for LT A.B. cable | 3 | No. | |
50 | 1.5 | Clamps for neutral for AB Cable | 3 | No. | |
51 | 1.51 | Stone Block /Per cast block for base pedding (450x450x75mm) | 13 | No. | |
52 | 1.52 | Stay GI wire 7/4 .00mm(7/8 SWG) | 60 | Kg. | |
53 | 1.53 | Stay wire 7/3 .15mm(7/10 SWG) | 55 | Kg. | |
54 | 1.54 | Dismantling Charges @ 50 % of Erection Cost | 1 | IR | |
55 | 1.55 | Labour &Transportation charges including of all material provided by company from area store bhopal to site & Betul to be borne by contractor | 1 | INR | |
56 | 1.56 | Other GST | 1 | INR |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail