Construction Of Meeting Cum Conference Hall At Banjagola Ugup , Puja Mandap And Solar Water Tank At Banjagola Village Under Naktideul Block
Tender Value
58.84 Lakhs
Estimated cost
Bid Submission
19 Oct 2019
0 days left
EMD
58844
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Naktideul → Odisha
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Construction Of Meeting Cum Conference Hall At Banjagola Ugup , Puja Mandap And Solar Water Tank At Banjagola Village Under Naktideul Block
BOQ
| Name of Work: Construction of Meeting cum Conference Hall at Banjagola UGUP, Puja Mandap and solar water Tank at Banjagola village under Naktideul Block | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | MEETING CUM CONFERENCE HALL | BI01010001010000000000000515BI0100001113 | ||
| 2 | 1.01 | Earth work excavation in hard soil or gravel within 50 mtr initial lead & 1.5 mtr initial lift including rough dressing the trench etc complete as per the direction of the engineer in charge. | 174.707 | cum | |
| 3 | 2 | Filling foundation & plinth with corse sand well waterwd and rammed as per the direction of engineer in charge etc complete. | BI01010001010000000000000515BI0100001114 | 222.675 | cum |
| 4 | 3 | P.C.C (1:3:6) in foundation and plinth using 40mm H.G.C.B metal including cost, conveyance, royalty etc complete as per the direction of engineer incharge. | BI01010001010000000000000515BI0100001115 | 31.56 | cum |
| 5 | 4 | R.C.C. work of M-20 grade with 20mm and down graded black hard granite C/B chips including hoisting,and laying per 1cum. | BI01010001010000000000000515BI0100001116 | ||
| 6 | 4.01 | In columns | BI01010001010000000000000515BI0100001117 | 30.792 | cum |
| 7 | 4.02 | Column upto roof level | BI01010001010000000000000515BI0100001118 | 10.5 | cum |
| 8 | 4.03 | In Grade beam | BI01010001010000000000000515BI0100001119 | 8.06778 | cum |
| 9 | 4.04 | In contineous lintel | BI01010001010000000000000515BI0100001120 | 6.31892 | cum |
| 10 | 4.05 | chajja | 91.5024 | Sqm | |
| 11 | 4.06 | In roof beam | 8.68602 | cum | |
| 12 | 4.07 | In roof slab | 32.7079 | cum | |
| 13 | 5 | Straightening, cutting, bending, binding of M.S rod or Tor steel, tying up the grills and placing in position including cost of binding wire with all cost conveyance, taxes etc completed in all respect as per the direction of engineer in charge. | 108.489 | qntl | |
| 14 | 6 | Brick work withFly Ash brick with cement mortar (1:6) in F&P including cost, conveyance, royalty, taxes of all materials, all labourT & P sundries etc complete as per direction of engineer in charge. | 30.3324 | cum | |
| 15 | 7 | Brick work with Fly Ash brick with cement mortar (1:6) in superstructure including cost, conveyance, royalty, taxes of all materials, all labourT & P sundries etc complete as per direction of engineer in charge. | 7.6545 | cum | |
| 16 | 8 | Brick work with Fly Ash brick with cement mortar (1:6) in superstructure including cost, conveyance, royalty, taxes of all materials, all labourT & P sundries etc complete as per direction of engineer in charge. | 55.4915 | cum | |
| 17 | 9 | 12mm thick cement plaster with cement mortar (1:6) including cost, conveyence, royalties, taxes etc of all materials, costs of all labour sundries T& P etc complete as per direction of engineer in charge.( outer walls) | 472.849 | Sqm | |
| 18 | 10 | 16mm thick cement plaster with cement mortar (1:6) including cost, conveyence, royalties, taxes etc of all materials, costs of all labour sundries T& P etc complete as per direction of engineer in charge.(Internal walls) | 302.602 | Sqm | |
| 19 | 11 | P.C.C (1:3:6) below A.S flooring using 40mm H.G.C.B metal including cost, conveyance, royalty etc complete as per the direction of engineer incharge. | 21.2992 | cum | |
| 20 | 12 | Fixing tiles in floors treads or steps and landing on 25mm thick bed of cement mortar 1:1 (1 cement : 1 sand) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of precast tiles. Per 1sqm | 308.237 | Sqm | |
| 21 | 13 | Fixing Chequred tiles in floors treads of steps and landing on 25mm thick bed of cement mortar (1:1) jointed with neat cement slurry mixed with pigment to match the shades of the tiles including rubbing and polishing etc. complete. Data for 10 Sqm | 45.42 | Sqm | |
| 22 | 14 | Cement washing two coats including all charges. Data for 93 Sqm | 1072.77 | Sqm | |
| 23 | 15 | 6mm thick cement plaster (1:4) to RCC surfaces finished smooth including closed deep chipping and slurry treatment per 1 sqm (AR page-109/item-27) | 222.97 | Sqm | |
| 24 | 16 | Painting 2 coats with weather coat on new work including cost, conveyance & royalty of all metarials etc complete as per direction of the Engineer-in-charge. .(data for 10 sqm) | 425.986 | Sqm | |
| 25 | 17 | Distempering two coats to walls with distemper of approved shade on new work to give an even shade excluding cost of distemper. Per 1sqm. Data for 10sqm. | 635.662 | Sqm | |
| 26 | 18 | Supplying,fitting and fixing MS Grills,Doors and Windows made out of structural steel flat etc. | 1775.93 | kg | |
| 27 | 19 | Painting two coats with any approved on new wood work / iron work with all cost, of materials and labour, T & P etc completed | 111.679 | Sqm | |
| 28 | 20 | 12mm thick cement plaster ( 1:4 ) for brick work with cement punning for skirting. Per 1 sqm. | 2.88 | Sqm | |
| 29 | 21 | 2.5cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips on new work. Per 1 sqm. | 261.663 | Sqm | |
| 30 | 22 | Logo | 1 | job | |
| 31 | 23 | Electrifcation | 1 | L.S. | |
| 32 | 24 | 12% GST | 1 | 12% GST | |
| 33 | 25 | Labour CESS 1% | 1 | L.S. | |
| 34 | 26 | PUJA MANDAP | |||
| 35 | 26.01 | Earth work excavation in hard soil or gravel within 50 mtr initial lead & 1.5 mtr initial lift including rough dressing the trench etc complete as per the direction of the engineer in charge. | 59.4707 | cum | |
| 36 | 27 | Filling foundation & plinth with corse sand well waterwd and rammed as per the direction of engineer in charge etc complete. | 61.5249 | cum | |
| 37 | 28 | P.C.C (1:3:6) in foundation and plinth using 40mm H.G.C.B metal including cost, conveyance, royalty etc complete as per the direction of engineer incharge. | 10.2098 | cum | |
| 38 | 29 | R.C.C. work of M-20 grade with 20mm and down graded black hard granite C/B chips including hoisting,and laying per 1cum. | |||
| 39 | 30 | In columns | 9.46377 | cum | |
| 40 | 30.01 | Column upto roof level | 2.4 | cum | |
| 41 | 30.02 | In Grade beam | 3.34629 | cum | |
| 42 | 30.03 | In contineous lintel | 1.75924 | cum | |
| 43 | 30.04 | chajja | 13.8791 | Sqm | |
| 44 | 30.05 | In roof beam | 1.72424 | cum | |
| 45 | 30.06 | In roof slab | 7.04357 | cum | |
| 46 | 31 | Straightening, cutting, bending, binding of M.S rod or Tor steel, tying up the grills and placing in position including cost of binding wire with all cost conveyance, taxes etc completed in all respect as per the direction of engineer in charge. | 28.5181 | qntl | |
| 47 | 32 | Brick work withFly Ash brick with cement mortar (1:6) in F&P including cost, conveyance, royalty, taxes of all materials, all labourT & P sundries etc complete as per direction of engineer in charge. | 13.0101 | cum | |
| 48 | 33 | Brick work with Fly Ash brick with cement mortar (1:6) in superstructure including cost, conveyance, royalty, taxes of all materials, all labourT & P sundries etc complete as per direction of engineer in charge. | 1.36957 | cum | |
| 49 | 34 | Brick work with Fly Ash brick with cement mortar (1:6) in superstructure including cost, conveyance, royalty, taxes of all materials, all labourT & P sundries etc complete as per direction of engineer in charge. | 17.6291 | cum | |
| 50 | 35 | 12mm thick cement plaster with cement mortar (1:6) including cost, conveyence, royalties, taxes etc of all materials, costs of all labour sundries T& P etc complete as per direction of engineer in charge.( outer walls) | 125.707 | Sqm | |
| 51 | 36 | 16mm thick cement plaster with cement mortar (1:6) including cost, conveyence, royalties, taxes etc of all materials, costs of all labour sundries T& P etc complete as per direction of engineer in charge.(Internal walls) | 97.7168 | Sqm | |
| 52 | 37 | P.C.C (1:3:6) below A.S flooring using 40mm H.G.C.B metal including cost, conveyance, royalty etc complete as per the direction of engineer incharge. | 3.9715 | cum | |
| 53 | 38 | Fixing tiles in floors treads or steps and landing on 25mm thick bed of cement mortar 1:1 (1 cement : 1 sand) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of precast tiles. Per 1sqm | 72.5938 | Sqm | |
| 54 | 39 | Fixing Chequred tiles in floors treads of steps and landing on 25mm thick bed of cement mortar (1:1) jointed with neat cement slurry mixed with pigment to match the shades of the tiles including rubbing and polishing etc. complete. Data for 10 Sqm | 8.22 | Sqm | |
| 55 | 40 | Cement washing two coats including all charges. Data for 93 Sqm | 270.5 | Sqm | |
| 56 | 41 | 6mm thick cement plaster (1:4) to RCC surfaces finished smooth including closed deep chipping and slurry treatment per 1 sqm (AR page-109/item-27) | 43.42 | Sqm | |
| 57 | 42 | Painting 2 coats with weather coat on new work including cost, conveyance & royalty of all metarials etc complete as per direction of the Engineer-in-charge. .(data for 10 sqm) | 77.805 | Sqm | |
| 58 | 43 | Distempering two coats to walls with distemper of approved shade on new work to give an even shade excluding cost of distemper. Per 1sqm. Data for 10sqm. | 149.134 | Sqm | |
| 59 | 44 | Supplying,fitting and fixing MS Grills,Doors and Windows made out of structural steel flat etc. | 794.475 | kg | |
| 60 | 45 | Painting two coats with any approved on new wood work / iron work with all cost, of materials and labour, T & P etc completed | 52.7513 | Sqm | |
| 61 | 46 | 2.5cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips on new work. Per 1 sqm. | 56.3485 | Sqm | |
| 62 | 47 | Logo | 1 | job | |
| 63 | 48 | Electrifcation | 1 | L.S. | |
| 64 | 49 | 12% GST | 1 | 12% GST | |
| 65 | 50 | Labour CESS 1% | 1 | L.S. | |
| 66 | 51 | Solar Water Tank (Details in Annexeur -A) | BI01010001010000000000000515BI0100001128 | 2 | each |
AI Tender Summary
Tender Timeline
Oct 04, 2019
11:30 IST
Tender Published
Tender notice published.
CompletedOct 19, 2019
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedOct 23, 2019
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender