Water Resources Department-WRD has published Tender For Exploratory triple tube NX size core drilling by Hydraulic core drilling rig and permeability test for bore holes for proposed Right Additional Spill Way on Right Dyke of Hirakud Dam Project. Submission Date for this Tender is 31-10-2019. Drilling and Exploration Equipment Tenders in BURLA Odisha. Bidders can get complete Tender details and download the document.
Name of Work: Exploratory triple tube NX size core drilling by Hydraulic core drilling rig and permeability test for bore holes for proposed Right Additional Spill Way on Right Dyke of Hirakud Dam Project. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Exploratory triple tube drilling of NX size (54.7mm) bore holes by hydraulic diamond drilling machine in all kinds of soil (overburden) including cost of all labours, cost of transportation of all machineries to the site and hire charges of all machineries and T&P etc. complete with all cost incidental to the work as per specification and direction of Engineer- In- Charge. | item1 | 40 | One mtr. |
2 | 2 | Exploratory triple tube drilling of NX size (54.7mm) bore holes by hydraulic diamond drilling machine in D.I./Laterite rock and highly weathered rock and preservation of samples recovered from holes in polythene bags including cost of all labours, cost of transportation of all machineries to the site and hire charges of all machineries and T&P etc. complete with all cost incidental to the work as per specification and direction of Engineer- In- Charge. | item2 | 160 | One mtr. |
3 | 3 | Exploratory triple tube drilling of NX size (54.7mm) bore holes by hydraulic diamond drilling machine in hard rock and preservation of samples recovered from holes in core boxes including cost of all labours, cost of transportation of all machineries to the site and hire charges of all machineries and T&P etc. complete with all cost incidental to the work as per specification and direction of Engineer- In- Charge. | item3 | 600 | One mtr. |
4 | 4 | Conducting water loss testing in all drill holes as per ascending and descending method using NX/BX Bit. (at 3 mtrs interval in Rock strata) and handing over the testing reports to the department in booklet shape including cost of all labours, cost of transportation of all machineries to the site and hire charges of all machineries and T&P etc. complete with all cost incidental to the work as per specification and direction of Engineer- In- Charge. | item4 | 600 | One No. |
5 | 5 | Manufacturing and supplying of core boxes of size 1.50m x 0.45m x 0.10m as per ISI specification and handing over the boxes with samples at departmental stores including cost of all labours, materials, transportation and hire charges of all machineries and T&P etc. complete with all cost incidental to the work as per specification and direction of Engineer- In- Charge. | item5 | 120 | One No. |
6 | 6 | Conduction of SPT Test (at 1.5m interval) of all bore holes in all kinds of soil, D.I. & highly weathered rock and preservation of samples recovered from holes in polythene bags including cost of all labours, cost of transportation and hire charges of all machineries and T&P etc. complete with all cost incidental to the work as per specification and direction of Engineer- In- Charge.e | item6 | 120 | One No. |
7 | 7 | Determination of in-situ dry density & moisture content test of all SPT soil samples as per ISI specification (IS: 2720 Part 3) in authorised laboratory and handing over the testing reports to the department in booklet shape including cost of all labours, cost of transportation of all samples to the authorised laboratory and hire charges of all machineries and T&P etc. complete with all cost incidental to the work as per specification and direction of Engineer- In- Charge. | item7 | 120 | One No. |
8 | 8 | Determination of Specific gravity test of all SPT soil samples as per ISI specification (IS:2720, Part-3) in authorised laboratory and handing over the testing reports to the department in booklet shape including cost of all labours, cost of transportation of all samples to the authorised laboratory and hire charges of all machineries and T&P etc. complete with all cost incidental to the work as per specification and direction of Engineer- In- Charge. | item8 | 120 | One No. |
9 | 9 | Determination of Liquid & Plastic limit test in clayey soil samples as per ISI specification (IS: 2720, Part 6) in authorised laboratory and handing over the testing reports to the department in booklet shape including cost of all labours, cost of transportation of all samples to the authorised laboratory and hire charges of all machineries and T&P etc. complete with all cost incidental to the work as per specification and direction of Engineer- In- Charge. | item9 | 120 | One No. |
10 | 10 | Determination of Shrinkage limit test in clayey soil samoles as per ISI specification (IS: 2720, Part-5) in authorised laboratory and handing over the testing reports to the department in booklet shape including cost of all labours, cost of transportation of all samples to the authorised laboratory and hire charges of all machineries and T&P etc. complete with all cost incidental to the work as per specification and direction of Engineer- In- Charge. | item10 | 120 | One No. |
11 | 11 | Determination of Grain size analysis test of soil samples as per ISI specification (IS: 2720, Part4) in authorised laboratory and handing over the testing reports to the department in booklet shape including cost of all labours, cost of transportation of all samples to the authorised laboratory and hire charges of all machineries and T&P etc. complete with all cost incidental to the work as per specification and direction of Engineer- In- Charge. | item11 | 120 | One No. |
12 | 12 | Determination of clay and silt content test from clayey soil samples as per ISI specification in authorised laboratory and handing over the testing reports to the department in booklet shape including cost of all labours, cost of transportation of all samples to the authorised laboratory and hire charges of all machineries and T&P etc. complete with all cost incidental to the work as per specification and direction of Engineer- In- Charge. | item12 | 120 | One No. |
13 | 13 | Determination of unit weight test of rock samples as per ISI specification (Rock core sample 1 no. from each mtr depth) in authorised laboratory and handing over the testing reports to the department in booklet shape including cost of all labours, cost of transportation of all samples to the authorised laboratory and hire charges of all machineries and T&P etc. complete with all cost incidental to the work as per specification and direction of Engineer- In- Charge. | item13 | 600 | One No. |
14 | 14 | Determination of specific gravity test of rock samples as per ISI specification (one number rock core sample from each mtr depth) in authorised laboratory and handing over the testing reports to the department in booklet shape including cost of all labours, cost of transportation of all samples to the authorised laboratory and hire charges of all machineries and T&P etc. complete with all cost incidental to the work as per specification and direction of Engineer- In- Charge. | item14 | 600 | One No. |
15 | 15 | Determination of water absorption test of rock samples as per ISI specification (one number rock core sample from each mtr depth) in authorised laboratory and handing over the testing reports to the department in booklet shape including cost of all labours, cost of transportation of all samples to the authorised laboratory and hire charges of all machineries and T&P etc. complete with all cost incidental to the work as per specification and direction of Engineer- In- Charge. | item15 | 600 | One No. |
16 | 16 | Determination of compressive strength test of rock samples as per ISI specification for one set (one set i,e 3 nos rock core specimens from each three mtr. depth) in authorised laboratory and handing over the testing reports to the department in booklet shape including cost of all labours, cost of transportation of all samples to the authorised laboratory and hire charges of all machineries and T&P etc. complete with all cost incidental to the work as per specification and direction of Engineer- In- Charge. | item16 | 200 | One Set. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail