| 1 | 1 | retaining wall | BI01010001010000000000000515BI0100001113 | | |
|---|
| 2 | 1.001 | 2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | BI01010001010000000000000515BI0100001114 | 61.2 | cum |
|---|
| 3 | 1.002 | 4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | BI01010001010000000000000515BI0100001115 | 15.3 | cum |
|---|
| 4 | 1.003 | 60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | BI01010001010000000000000515BI0100001116 | 86.7 | cum |
|---|
| 5 | 1.004 | 4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | BI01010001010000000000000515BI0100001117 | 40.8 | sqm |
|---|
| 6 | 1.005 | 5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | BI01010001010000000000000515BI0100001118 | 377.2 | kilogram |
|---|
| 7 | 1.006 | 4.1.5 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | BI01010001010000000000000515BI0100001119 | 9.18 | cum |
|---|
| 8 | 2 | concreting | BI01010001010000000000000515BI0100001120 | | |
|---|
| 9 | 2.001 | 51.2.3 : Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade | BI01010001010000000000000515BI0100001121 | 12.851 | cum |
|---|
| 10 | 2.002 | 16.42 : Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size ) in pavements, laid to required slope and camber in panels as required including consolidation finishing and tamping complete | BI01010001010000000000000515BI0100001122 | 21.975 | cum |
|---|
| 11 | 2.003 | od168838/2019_2020 : Charges for name board including fabrication, lettering, painting, fixing in position etc complete | BI01010001010000000000000515BI0100001123 | 1 | each |
|---|