Sdrf-Kip Rb Sub Dn . 26-Urgent Rectification Of Thuruthikkara Minor Distributory From Ch . 2300 M To 2530 M Under Sn . 12-3 Bharanikkavu Rectification Work Of Canal
Tender Value
8.03 Lakhs
Estimated cost
Bid Submission
09 Oct 2019
0 days left
EMD
20100
Bank guarantee accepted
Document Fee
1800
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Kunnathoor → Kerala
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Sdrf-Kip Rb Sub Dn . 26-Urgent Rectification Of Thuruthikkara Minor Distributory From Ch . 2300 M To 2530 M Under Sn . 12-3 Bharanikkavu Rectification Work Of Canal
BOQ
| Work Name:SDRF- KIP(RB) Sub Dn. 26 - Urgent rectification of Thuruthikkara minor distributory Ch: 2300 m to 2530 m under Sn.12/3 Bharanikkavu. | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | SCHEME-1 CH 2300 TO 2345 | BI01010001010000000000000515BI0100001113 | ||
| 2 | 1.01 | 2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | BI01010001010000000000000515BI0100001114 | 280.8 | sqm |
| 3 | 1.02 | 2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | BI01010001010000000000000515BI0100001115 | 21.938 | cum |
| 4 | 1.03 | 15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix) | BI01010001010000000000000515BI0100001116 | 1.952 | cum |
| 5 | 1.04 | od32060/2019_2020/P2 : Cement concrete 1:4:7 using 20mm metal to lines and levels including proper compacting curing , watering etc. complete with all leads and lift etc. complete as per specification or as directed by Engineer in chaege | BI01010001010000000000000515BI0100001117 | 13.781 | cum |
| 6 | 1.05 | 50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete | BI01010001010000000000000515BI0100001118 | 208.8 | sqm |
| 7 | 1.06 | 5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints. | BI01010001010000000000000515BI0100001119 | 0.061 | cum |
| 8 | 2 | SCHEME-2 CH 2345 TO 2390 | BI01010001010000000000000515BI0100001120 | ||
| 9 | 2.01 | 2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | BI01010001010000000000000515BI0100001121 | 280.8 | sqm |
| 10 | 2.02 | 2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | BI01010001010000000000000515BI0100001122 | 27 | cum |
| 11 | 2.03 | 15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix) | BI01010001010000000000000515BI0100001123 | 2.12 | cum |
| 12 | 2.04 | od32060/2019_2020/P2 : Cement concrete 1:4:7 using 20mm metal to lines and levels including proper compacting curing , watering etc. complete with all leads and lift etc. complete as per specification or as directed by Engineer in chaege | BI01010001010000000000000515BI0100001124 | 13.781 | cum |
| 13 | 2.05 | 50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete | BI01010001010000000000000515BI0100001125 | 208.8 | sqm |
| 14 | 2.06 | 5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints. | BI01010001010000000000000515BI0100001126 | 0.061 | cum |
| 15 | 3 | SCHEME-3 CH 2390 TO 2435 | BI01010001010000000000000515BI0100001127 | ||
| 16 | 3.01 | 2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | BI01010001010000000000000515BI0100001128 | 280.8 | sqm |
| 17 | 3.02 | 2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | BI01010001010000000000000515BI0100001129 | 27 | cum |
| 18 | 3.03 | 15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix) | BI01010001010000000000000515BI0100001130 | 1.504 | cum |
| 19 | 3.04 | od32060/2019_2020/P2 : Cement concrete 1:4:7 using 20mm metal to lines and levels including proper compacting curing , watering etc. complete with all leads and lift etc. complete as per specification or as directed by Engineer in chaege | BI01010001010000000000000515BI0100001131 | 13.781 | cum |
| 20 | 3.05 | 50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete | BI01010001010000000000000515BI0100001132 | 208.8 | sqm |
| 21 | 3.06 | 5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints. | BI01010001010000000000000515BI0100001133 | 0.061 | cum |
| 22 | 4 | SCHEME-4 CH 2435 TO 2480 | BI01010001010000000000000515BI0100001134 | ||
| 23 | 4.01 | 2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | BI01010001010000000000000515BI0100001135 | 280.8 | sqm |
| 24 | 4.02 | 2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | BI01010001010000000000000515BI0100001136 | 27 | cum |
| 25 | 4.03 | 15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix) | BI01010001010000000000000515BI0100001137 | 1.98 | cum |
| 26 | 4.04 | od32060/2019_2020/P2 : Cement concrete 1:4:7 using 20mm metal to lines and levels including proper compacting curing , watering etc. complete with all leads and lift etc. complete as per specification or as directed by Engineer in chaege | BI01010001010000000000000515BI0100001138 | 13.781 | cum |
| 27 | 4.05 | 50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete | BI01010001010000000000000515BI0100001139 | 208.8 | sqm |
| 28 | 4.06 | 5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints. | BI01010001010000000000000515BI0100001140 | 0.061 | cum |
| 29 | 5 | SCHEME-5 CH 2480 TO 2525 | BI01010001010000000000000515BI0100001141 | ||
| 30 | 5.01 | 2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | BI01010001010000000000000515BI0100001142 | 325.8 | sqm |
| 31 | 5.02 | 2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | BI01010001010000000000000515BI0100001143 | 27 | cum |
| 32 | 5.03 | 15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix) | BI01010001010000000000000515BI0100001144 | 2.088 | cum |
| 33 | 5.04 | od32060/2019_2020/P2 : Cement concrete 1:4:7 using 20mm metal to lines and levels including proper compacting curing , watering etc. complete with all leads and lift etc. complete as per specification or as directed by Engineer in chaege | BI01010001010000000000000515BI0100001145 | 13.781 | cum |
| 34 | 5.05 | 50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete | BI01010001010000000000000515BI0100001146 | 208.8 | sqm |
| 35 | 5.06 | 5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints. | BI01010001010000000000000515BI0100001147 | 0.061 | cum |
| 36 | 6 | SCHEME-6 CH 2525 To 2540 | BI01010001010000000000000515BI0100001148 | ||
| 37 | 6.01 | 2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | BI01010001010000000000000515BI0100001149 | 93.6 | sqm |
| 38 | 6.02 | 2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | BI01010001010000000000000515BI0100001150 | 9 | cum |
| 39 | 6.03 | 15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix) | BI01010001010000000000000515BI0100001151 | 0.664 | cum |
| 40 | 6.04 | od32060/2019_2020/P2 : Cement concrete 1:4:7 using 20mm metal to lines and levels including proper compacting curing , watering etc. complete with all leads and lift etc. complete as per specification or as directed by Engineer in chaege | BI01010001010000000000000515BI0100001152 | 4.594 | cum |
| 41 | 6.05 | 50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete | BI01010001010000000000000515BI0100001153 | 69.6 | sqm |
| 42 | 6.06 | 5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints. | BI01010001010000000000000515BI0100001154 | 0.027 | cum |
AI Tender Summary
Tender Timeline
Sep 30, 2019
11:30 IST
Tender Published
Tender notice published.
CompletedOct 09, 2019
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedOct 11, 2019
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer