Corrigendum - Comprehensive Maintenance Contract ( Cmc ) Of Datacenter Components For The Year ( 2019 To 2022 ) , Cmc-Datacentre Components For The Year 2019-2022 , Modular Ups- Module -Cmc For First Year , Modular Ups- Module -Cmc For Second Year , Modular Ups - Module Cmc For Third Year , Liquid Cooling Package - Cmc For First Year , Liquid Cooling Package - Cmc For Second Year , Liquid Cooling Package - Cmc For Third Year , Auto Transfer Switch-100A Ats Module-Cmc For First Year , Auto Transfer Switch-100A Ats Module-Cmc For Second Year , Auto Transfer Switch-100A Ats Module-Cmc For Third Year , Ip Based Rack Power Distribution Unit -Cmc For First Year , Ip Based Rack Power Distribution Unit -Cmc For Second Year , Ip Based Rack Power Distribution Unit -Cmc For Third Year , Auxilliary Ups -Cmc For First Year , Auxilliary Ups -Cmc For Second Year , Auxilliary Ups -Cmc For Third Year , Chiller -Cmc For First Year , Chiller -Cmc For Second Year , Chiller -Cmc For Third Year , Chiller Low Side Ppr- Water Piping System With Motorized Valves , Actuators , Pressure Gauge Monitoring Meter And Chiller Sequencing Panel -Cmc- First Year , Chiller Low Side Ppr- Water Piping System With Motorized Valves , Actuators , Pressure Gauge Monitoring Meter And Chiller Sequencing Panel -Cmc- Second Year , Chiller Low Side Ppr- Water Piping System With Motorized Valves , Actuators , Pressure Gauge Monitoring Meter And Chiller Sequencing Panel -Cmc- Third Year , Rack Based Monitoring System Including , Processing Unit , I/O Unit , Power Supply Unit And Gsm Units - Cmc- First Year , Rack Based Monitoring System Including , Processing Unit , I/O Unit , Power Supply Unit And Gsm Units - Cmc- Second Year , Rack Based Monitoring System Including , Processing Unit , I/O Unit , Power Supply Unit And Gsm Units - Cmc- Third Year , Rack Based Fire Detector And Extinguisher-Master -Cmc- First Year , Rack Based Fire Detector And Extinguisher-Master -Cmc- Second Year , Rack Based Fire Detector And Extinguisher-Master -Cmc- Third Year , Rack Based Fire Detector And Extinguisher-Slave -Cmc-First Year , Rack Based Fire Detector And Extinguisher-Slave -Cmc-Second Year , Rack Based Fire Detector And Extinguisher-Slave -Cmc-Third Year , Automatic Door Opening System For Server Racks -Cmc-First Year , Automatic Door Opening System For Server Racks -Cmc-Second Year , Automatic Door Opening System For Server Racks -Cmc-Third Year , Main Electrical Panel -Cmc- First Year , Main Electrical Panel -Cmc- Second Year , Main Electrical Panel -Cmc- Third Year , Ups Distribution Panel -Cmc-First YearUps Distribution PanelUps Distribution Panel -Cmc- First Year , Ups Distribution Panel -Cmc- Second Year , Ups Distribution Panel -Cmc- Third Year , Bms- Building Management System -Cmc- First Year , Bms- Building Management System -Cmc-Second Year , Bms- Building Management System -Cmc-Third Year , Modular Ups- Module -Cmc -First Year Including Control Pcb Replacement , Modular Ups- Module -Cmc -Second Year , Modular Ups- Module -Cmc -Third Year