Airports Authority Of India has published Annual Comprehensive Maintenance Contract Of Departure And Arrival Baggage Conveyor System At Sgrdj International Airport , Amritsar ( 2019-21 ) . . Submission Date for this Tender is 15-10-2019. Conveyors and Accessories Tenders in Amritsar International Airport. Punjab. Bidders can get complete Tender details and download the document.
Name of Work: < Annual Comprehensive Maintenance Contract of Departure and Arrival Baggage Conveyor system at SGRDJ International Airport, Amritsar (2019-2021).> | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | All Inclusive Comprehensive maintenance contract of existing Baggage Handling system , complete in all respect. | |||
2 | 1.01 | During 1st Year (Arrival Belt) | 12 | Month | |
3 | 1.02 | During 2nd Year (Arrival Belt) | 12 | Month | |
4 | 1.03 | During 1st Year (Departure Belt) | 12 | Month | |
5 | 1.04 | During 2nd Year (Departure Belt) | 12 | Month | |
6 | 2 | Operation & running of existing Baggage Handling system (Make Pteris Global) complete in all respect by deployment of required manpower. ARRIVAL & DEPARTURE (3 shifts per day) | 24 | Month | |
7 | 3 | Supply of following spares during the contract period as and when required compatible with existing baggage handling system :- | |||
8 | 3.01 | Power Curve Belt 90 degree | 1 | Nos. | |
9 | 3.02 | 6 V DC Adaptor for counter | 1 | Nos. | |
10 | 3.03 | Weighing scale complete set with both display | 5 | set | |
11 | 3.04 | Drive roller | 1 | Nos. | |
12 | 3.05 | End roller | 1 | Nos. | |
13 | 3.06 | Return roller | 5 | Nos. | |
14 | 3.07 | Flange bearing | 4 | Nos. | |
15 | 3.08 | Oval bearing | 4 | Nos. | |
16 | 3.09 | Belt jointing fastner | 4 | set | |
17 | 3.1 | Gear motor 1.1 kw | 2 | Nos. | |
18 | 3.11 | Gear motor 0.75 kw | 2 | Nos. | |
19 | 3.12 | Gear motor 2.2 kw | 1 | Nos. | |
20 | 3.13 | Gear motor 3 kw | 1 | Nos. | |
21 | 3.14 | Photo sensor | 2 | Nos. | |
22 | 3.15 | Soft starter | 1 | Nos. | |
23 | 3.16 | Carousel Drive Belt | 1 | Nos. | |
24 | 3.17 | Friction wheel | 5 | Nos. | |
25 | 3.18 | Support wheel | 5 | Nos. | |
26 | 3.19 | SMPS | 1 | Nos. | |
27 | 3.2 | PLC - Input Card | 1 | Nos. | |
28 | 3.21 | PLC - Output Card | 1 | Nos. | |
29 | 3.22 | PLC CPU | 1 | Nos. | |
30 | 4 | Supply of 660mm long drum pulley having dia 113mm, 0.3Kw, 3 Phase, 50Hz, speed 0.5/sec. for conveyor belt complete as required at site. | 1 | Each | |
31 | 5 | Supply of pressure rollers for arrival conveyor belt complete as required at site. | 10 | Each | |
32 | 6 | Supply of PVC conveyor belt, black, smooth top, size 910 mm x 3mm for Departure conveyor belt | 100 | mtr | |
33 | 7 | Supply of PVC conveyor belt, black, rough top, size 960 mm x 4.5mm for Arrival conveyor belt | 50 | mtr | |
34 | 8 | Belt jointing hot valcanizing for 910 mm belt for Departure conveyor | 10 | each | |
35 | 9 | Belt jointing hot valcanizing for 960 mm belt for Arrival conveyor | 10 | each | |
36 | 10 | Supply of Drum motor suitable for operation of weighing conveyor belt and despatch conveyor belt of check-in-counters used for departure conveyor baggage handling system, with following specifications complete as required at site :-\nType : 113 i/ SL 650 mm\nWattage : 0.37 KW / 2 Pole\nSpeed : 0.47 mtr. /Sec.\nVoltage : 3 Phase, 230/400V - 50Hz.\nConnector : Elbow Connector\nSuitable size cable : 3.5 mtr. (Minimum)\nMaterial of construction (MOC) : Standard + (SS Labyrinth seal) | 5 | each |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail