Construction Of Boundary Wall -Civil Work Amol Vihar Yojna Panhuch Marg Ke Baundry Wall Evm Nirman Karya Bhag B
Tender Value
Ref. Documents
Estimated cost
Bid Submission
14 Oct 2019
0 days left
EMD
73000
Bank guarantee accepted
Document Fee
2500
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
raebareli → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
construction of boundary wall -Civil Work Amol Vihar Yojna Panhuch Marg Ke Baundry Wall Evm Nirman Karya Bhag B
BOQ
| Name of Work: veksy fogkj ;kstuk ds igqWp ekxZ ds fdukjs ckm.Mªhoky] ukyh ,oa dyoVZ dk fuekZ.k dk;Z ¼Hkkx&ch½ | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Excavation in foundation in ordinary soil (Loan clay or sand) including lift up to 1.5 M (5fits.) and lead upto 30M (100fits) & including filling, watering and ramming of excavate earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in charges up to a distance of 30m (100 fits.) from the foundation trenches. | BI01010001010000000000000515BI0100001113 | 1100 | cum |
| 2 | 2 | Providing and laying cement concrete 1:4:8 )(1cement : 4 coarse sand : 8 graded stone ballast of 40 mm nominal size) including supply of all materials labour and T &P etc. required for prorper completion of the work and curing complete, also including cost of for work in foundation and floors. All work complete as per S.I. No. 281/2015 | BI01010001010000000000000515BI0100001114 | 170 | cum |
| 3 | 3 | R.C.C. work with cement approved coarse sand and 2 cm (3/4\") gauge approved stone grit in proportion of in (1:1.5:3) in raft work excluding supply of reinforcement & its binding but including its fixing & bending the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and also including supply of all material ,T&P etc. required for proper completetion of the work. Bindig wire cost being included in the item. | BI01010001010000000000000515BI0100001115 | 162 | cum |
| 4 | 4 | R.C.C. work with cement approved coarse sand and 2 cm (3/4\") gauge approved stone grit in proportion of in (1:1.5:3) in beem work excluding supply of reinforcement & its binding but including its fixing & bending the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and also including supply of all material ,T&P etc. required for proper completetion of the work. Bindig wire cost being included in the item. | BI01010001010000000000000515BI0100001116 | 37 | cum |
| 5 | 5 | R.C.C. work with cement approved coarse sand and 2 cm (3/4\") gauge approved stone grit in proportion of in (1:1.5:3) in column work excluding supply of reinforcement & its binding but including its fixing & bending the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and also including supply of all material ,T&P etc. required for proper completetion of the work. Bindig wire cost being included in the item. | BI01010001010000000000000515BI0100001117 | 29 | cum |
| 6 | 6 | R.C.C. work with cement approved coarse sand and 2 cm (3/4\") gauge approved stone grit in proportion of in (1:1.5:3) in wall work excluding supply of reinforcement & its binding but including its fixing & bending the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and also including supply of all material ,T&P etc. required for proper completetion of the work. Bindig wire cost being included in the item. | BI01010001010000000000000515BI0100001118 | 122 | cum |
| 7 | 7 | R.C.C. work with cement approved coarse sand and 2 cm (3/4\") gauge approved stone grit in proportion of in (1:1.5:3) in slab work excluding supply of reinforcement & its binding but including its fixing & bending the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and also including supply of all material ,T&P etc. required for proper completetion of the work. Bindig wire cost being included in the item. | BI01010001010000000000000515BI0100001119 | 11 | cum |
| 8 | 8 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work(when not included in over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage & over lapping & hooks. SI. No.-504 | BI01010001010000000000000515BI0100001119 | 283 | qtl |
| 9 | 9 | P/F of P.C.C. Karb stone all including all labour, T&P material all complete work. | BI01010001010000000000000515BI0100001119 | 540 | rmt |
| 10 | 10 | P/L of 80mm thick ruber molded tiles allincluding all labour, T&P material all complete work. | BI01010001010000000000000515BI0100001119 | 810 | sqm |
| 11 | 11 | 150-Class brick work in 1:3 cement and coarse sand mortar in super structure and plinth including supply of all materials, labour and T & P etc required for proper completion of the work. | BI01010001010000000000000515BI0100001119 | 227 | cum |
| 12 | 12 | P.C.C. work with cement approved coarse sand and 20mm gauge approved stone grit in the proportion of 1:2:4 in including supply of all materials, labour and T&P etc. required for proper completion of the work. | BI01010001010000000000000515BI0100001119 | 9 | cum |
| 13 | 13 | Cortage of earth up to 1KM including its loading unloading all complete work. | BI01010001010000000000000515BI0100001119 | 1100 | cum |
| 14 | 14 | Providing fixing and jointing PVC pipes of different diameters with PVC solvent cement (or as per manufacturers specifications) with or without sockets (if sockets are provided with pipe length ) in vertical Sewage line waste water line and vent line with all neacessary bends , angle bends, Tess, elbows MS bat clamps along with all necessary fastners and bolt with cutting chases and making good the wallas and floors wherever required including testing of the same all as per direction and satisfaction of engineer in charge. 100 mm dia 6kg. pressure. | BI01010001010000000000000515BI0100001119 | 95 | rmt |
| 15 | 15 | 12mm thick cement plaster in dedo or skirting in 1:3 consisting of one part of cement and 3 parts of approved coarse sand laid in panels, including supply of all materials, labour and T & P etc required for proper completion of the work. | BI01010001010000000000000515BI0100001119 | 1500 | sqm |
| 16 | 16 | Snowcem Painting two coat including all labour, T&P material all complete work. | BI01010001010000000000000515BI0100001119 | 1500 | sqm |
| 17 | 17 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work(when not included in over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage & over lapping & hooks. | BI01010001010000000000000515BI0100001119 | 7 | cum |
| 18 | 18 | Enemal painting of steel surface all including all labour, T&P material all complete work. | BI01010001010000000000000515BI0100001119 | 70 | sqm |
AI Tender Summary
Tender Timeline
Sep 24, 2019
11:30 IST
Tender Published
Tender notice published.
CompletedOct 14, 2019
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedOct 16, 2019
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender