Defence Statutory Bodies & Commissions/Committees Closing in 0 days TDR #21917428

Repair/Maintenance To The 33/11 Kv Mrs Yards , Vcbs And Ht Distribution Systems At Nad , Bvy Yard , Abe Park , Nad Colony , Old Mo ( V ) , Ctw And Ins Viswakarma Under Age E/M No-Ii Of Ge ( U-I ) , Visakhapatnam

Issued by Statutory Bodies & Commissions/Committees · Garrison Engineer Utility-I Visakhapatnam, Andhra Pradesh
Tender Value
36 Lakhs
Estimated cost
Bid Submission
15 Oct 2019
0 days left
EMD
72000
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Garrison Engineer Utility-I Visakhapatnam → Andhra Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Repair/Maintenance To The 33/11 Kv Mrs Yards , Vcbs And Ht Distribution Systems At Nad , Bvy Yard , Abe Park , Nad Colony , Old Mo ( V ) , Ctw And Ins Viswakarma Under Age E/M No-Ii Of Ge ( U-I ) , Visakhapatnam , M&L For Disconnecting Carefully Electrical Connection From Both Ht/ Lt ( Primary & Secondary ) Sides Of The Transformer , Keeping Them At Safe Side And Taking Out The Transformer/Voltage Stabiliser Indoor/ Outdoor Type Of Capacity 250 Kva To 750 Kva , 11 Kv/433Kv , Step Down Any Make For Carrying Out Complete Overhauling Which Shall Comprise Of The Following:- , ( A ) M&L For Lifting , Transporting , Handling The Transformer To Workshop And Opening Top Cover Of The Transformer By Unscrewing Nuts , Bolts , Washers Etc . Including Disconnecting Core Assembly From Ht/ Lt Bushing And Lifting The Same Gently And Taking Out From The Shell ( Container/ Body ) Of The Transformer . , ( B ) M&L For Draining Out Transformer Oil From The Above Said Transformer In The Suitable Capacity Of Container /Drums And Keeping It In Safe Custody For Reuse . , ( C ) M&L For Cleaning The Transformer Body From Inside , Removing Deposited Dirt/ Sludge/ Foreign Particles Etc . From The Bottom/ Body Of The Transformer And Drying Up The Shell From Inside Before Refilling Of The Transformer Oil . , ( D ) M&L For Cleaning And Washing Thoroughly Core And Windings Of The Transformer By Hosing Down With Clean Dry Oil Conforming To Is 335/1983 , Removing Deposited Dirt/Sludge/Foreign Particles From The Windings/ Core , Thorough Inspection Of Windings , Providing Insulations To Leads And Terminals , Heating/ Drying/ Baking Complete Carefully And Thoroughly Inside The Heating Chamber At Suitable Temperature To Obtain Required Value Of Insulation Resistance Etc . All As Directed By Engr-In- Charge . , ( E ) Lifting And Refixing Core Assembly Inside The Transformer Shell Gently And Carefully , Connecting Primary/ Secondary/ Neutral Connections To The Bushings Assembly , Fixing Of Tap Change Over Including Tightening Of Nuts , Bolts , Washers Of The Core To Reduce Humming Noise All As Directed . , ( F ) Refilling The Filtered Transformer Oil In The Shell Of Transformer Complete . , ( G ) Refixing The Top Cover Including Replacement Of Cork Sheet/ Gasket 8Mm Thick , Tightening Of Nuts/ Bolts/ Washers Etc . And Replacement Of Breather With Silica Gel Crystal Type All As Directed By Engr-In Charge , ( H ) Lifting/ Shifting To The Place From Where Removed Or To Any Location As Directed And Re-Installing The Transformer Including Connecting Primary/ Secondary/ Neutral Connections Etc . All As Directed By Engr-In-Charge . , ( J ) The Inspection Of Transformer Shall Involve:- ( I ) Checking Of All Clamps , Nuts , Bolts Including Core Bolts & Cover Fixing Bolts . ( Ii ) Checking All Brazings , Joints , Tap Heads And Connection Joints . ( Iii ) Checking All Jumpers , Terminations/ Connections Inside The Transformer . ( Iv ) Checking The Bucholtz Relay/ Conservator Mog If Any . ( V ) Painting Of Transformer Complete With Two Coats Of Synthetic Enamel Paint Externally Transformer Shell Complete All As Directed By Engr-In-Charge . ( Vi ) Inspection Of Tap Changer , Checking The Moving And Fixed Contacts For Contact Wear And Connection To Winding . , ( K ) Conducting The Tests On Core And Windings As Per Is Like Ratio , Magnetic Imbalance , Short Circuit Etc . In Presence Of Engr-In-Charge And Test Results Shall Be Signed Both By The Contractor And Engineer -In-Charge And Kept On Record . , Note:- ( I ) Any Damage To Insulators/ Bushes/ Windings Etc . While In The Custody Of The Contractor Shall Be Made Good At No Extra Cost To Department . The Serviceability Of The Transformer Shall Be Checked And Confirmed By The Contractor Before Taking Into His Custody . ( Ii ) M&L For Rewinding/ Re-Insulation Of Ht/ Lt ( Primary/ Secondary ) Coils , Bushes , Studs , Transformer Oil , Cable Box , Replacement Of Bucholtz Relay/ Mog If Any Etc Will Be Measured And Paid Separately . , All As Per Item No . 1 Herein Before But Transformer/Voltage Stabiliser Indoor/ Outdoor Type Of Capacity Up To 200 Kva , M&L For Replacement Of Damaged Space Heater In Ht Vcb 11 Kv With New One Suitable To Operate On 110 Volts Dc Supply Complete With Necessary Wiring And Control Cable With Toggle Switch And All As Directed By Engr-In-Charge . , Filtration Of Transformer Oil Of Transformers/ Frmus Installed At Various Locations To Achieve Di-Electric Strength Not Less Than 60 Kv At 2 . 5Mm Gap As Per Relevant Is With Portable Filtration Plant , Testing Of The Oil For The Di-Electric Strength Before Filtration And After Filtration Complete All As Directed By The Engineer-In-Charge . , Supply And Topping Up Of Transformer Oil With Di-Electric Strength Not Less Than 60 Kv In To The Conservator Tank/ Body Tank Of The Transformer/ Ocb/ Frmus Etc At Various Locations Complete All As Directed By The Engineer-In-Charge . Make: Power Oil/ Transol/ Sabitha Chemicals , M&L For Rewinding Of Distribution ( Ht/Lt ) Transformers Of Capacity ( 100 Kva To 750 Kva ) / Type By Winding The Defective Coils With New Copper Wire As Per I . S . Of Same Gauge And Existing Size Together With New Insulated Materials/ Bracings Before Placing In To The Transformer And Assembling The Coil With New Insulation And Fitting The Coils In The Chamber , Testing And Commissioning The Transformer And Recording The Test Results Complete All As Directed . [Note: M&L For Re-Insulation Of Serviceable Coils Will Be Measured & Paid Separately Under Relevant Items . ] , M&L For Re-Insulating Windings Of Ht/ Lt Distribution Transformers Of Capacity ( 100 Kva To 750 Kva ) / Size/ Type By Strip Opening Of Ht/ Lt Coils ( I . E . Primary/ Secondary Coils ) From Core Assembly Safely , Unwinding The Ht/ Lt Coils ( I . E . Primary/ Secondary Coils ) Complete , Removing The Old Defective Insulation Paper And Replacing With New Dpc Insulation To The Copper Conductor , Re-Varnishing Of The Windings With Super Varnish Including Heating/ Drying/ Backing Complete Carefully And Thoroughly Inside The Heating Chamber At Suitable Temperature To Obtain Required Value Of Insulation Resistance Etc . All As Per Is 1986-87 And As Directed By Engr-In- Charge . , Disconnection Of The Distribution Transformer From Ht And Lt Supply Mains , Removing Of Bus Duct And Bus Bar , Leakage Arresting To Following Transformers By Draining Out Of Oil , After Arrangement Of Necessary Empty Oil Drums , Buckets Etc . , Dismantling Of Top Cover And Accessories , Dismantling Of Lt Bushings By Disconnecting Leads/Jumpers From Inside , Replacement Of Gaskets And Oil Seals And Re Fixing Of The Lt Bushings , Making Internal And External Connections , Replacement Of Cover Gasket And Accessories , Refixing Of Accessories And Cover , Filling Of Transformer Oil Complete , And Making Cable Connections And For Energising The Transformer . ( Cost Includes Materials Like Gaskets And Oil Seals And Labour , The Bushing And Bushings Rods To Be Measured And Paid Separately ) . , ( A ) 2500 To 3150 Kva , ( B ) 500 Kva To 750 Kva , ( C ) 250 Kva To 400 Kva , ( D ) Up To 200 Kva , Disconnecting The Ht/Lt Connections Of Following Transformers I . E ( Bus Duct / Cable Bunch ) Keeping All The Cables Out From The Ht/Lt Sides , Physically Checking The Transformer For Healthiness , Performing The Transformer Tests Like Meggar Test , Ratio Test , Magnetic Balance Test And Short Circuit Tests For Checking The Condition Of Transformer Complete And Test Results Shall Be Submitted By The Contractor . Note:- ( I ) If The Transformer Found Satisfactory Then Ht/Lt Connections Shall Be Done By The Contractor And Has To Charge The Transformer . ( Ii ) If The Transformer Fails In These Tests Then The Contractor Has To

BOQ

NAME OF WORK : REPAIR/MAINTENANCE TO THE 33/11 KV MRS YARDS, VCBS AND HT DISTRIBUTION SYSTEMS AT NAD, BVY YARD, ABE PARK, NAD COLONY, OLD MO(V), CTW & INS VISWAKARMA UNDER AGE E/M NO-II OF GE(U-I), VISAKHAPATNAM.
Sl.No.Item DescriptionItem Code / MakeQuantityUnits
11M&L for disconnecting carefully electrical connection from both HT/ LT (primary & secondary) sides of the transformer, keeping them at safe side and taking out the transformer/Voltage stabiliser indoor/ outdoor type of capacity 250 KVA to 750 KVA, 11 KV/433KV, step down any make for carrying out complete overhauling which shall comprise of the following:-1Each Job
21.01(a) M&L for lifting, transporting, handling the transformer to workshop and opening top cover of the transformer by unscrewing nuts, bolts, washers etc. including disconnecting core assembly from HT/ LT bushing and lifting the same gently and taking out from the shell (container/ body) of the transformer.
31.02(b) M&L for draining out transformer oil from the above said transformer in the suitable capacity of container /drums and keeping it in safe custody for reuse.
41.03(c) M&L for cleaning the transformer body from inside, removing deposited dirt/ sludge/ foreign particles etc. from the bottom/ body of the transformer and drying up the shell from inside before refilling of the transformer oil.
51.04(d) M&L for cleaning and washing thoroughly core and windings of the transformer by hosing down with clean dry oil conforming to IS 335/1983, removing deposited dirt/sludge/foreign particles from the windings/ core, thorough inspection of windings, providing insulations to leads and terminals, heating/ drying/ baking complete carefully and thoroughly inside the heating chamber at suitable temperature to obtain required value of insulation resistance etc. all as directed by Engr-in- charge.
61.05(e) Lifting and refixing core assembly inside the transformer shell gently and carefully, connecting primary/ secondary/ Neutral connections to the bushings assembly, fixing of tap change over including tightening of nuts, bolts, washers of the core to reduce humming noise all as directed.
71.06(f) Refilling the filtered transformer oil in the shell of transformer complete.
81.07(g) Refixing the top cover including replacement of cork sheet/ gasket 8mm thick, tightening of nuts/ bolts/ washers etc. and replacement of breather with silica gel crystal type all as directed by Engr-in charge
91.08(h) Lifting/ shifting to the place from where removed or to any location as directed and re-installing the transformer including connecting primary/ secondary/ neutral connections etc. all as directed by Engr-in-Charge.
101.09( j) The inspection of transformer shall involve:-\n(i) Checking of all clamps, nuts, bolts including core bolts & cover fixing bolts.\n(ii) Checking all brazings, joints, tap heads and connection joints.\n(iii) Checking all jumpers, terminations/ connections inside the transformer.\n(iv) Checking the Bucholtz relay/ conservator MOG if any.\n(v) Painting of transformer complete with two coats of synthetic enamel paint externally transformer shell complete all as directed by Engr-in-Charge.\n(vi) Inspection of tap changer, checking the moving and fixed contacts for contact wear and connection to winding.
111.1(k) Conducting the tests on core and windings as per IS like ratio, magnetic imbalance, short circuit etc. in presence of Engr-in-Charge and test results shall be signed both by the contractor and Engineer -in-Charge and kept on record.
121.11Note:- \n(i) Any damage to insulators/ bushes/ windings etc. while in the custody of the contractor shall be made good at no extra cost to Department. The serviceability of the transformer shall be checked and confirmed by the contractor before taking into his custody.\n(ii) M&L for rewinding/ re-insulation of HT/ LT (primary/ secondary) coils, bushes, studs, Transformer oil, cable box, replacement of bucholtz relay/ MOG if any etc will be measured and paid separately.
132All as per Item No. 1 herein before but transformer/Voltage stabiliser indoor/ outdoor type of capacity up to 200 KVA1Each Job
143M&L for replacement of damaged space heater in HT VCB 11 KV with new one suitable to operate on 110 Volts DC supply complete with necessary wiring and control cable with toggle switch and all as directed by Engr-in-charge.10Each Job
154Filtration of transformer oil of transformers/ FRMUs installed at various locations to achieve di-electric strength not less than 60 KV at 2.5mm gap as per relevant IS with portable filtration plant, testing of the oil for the di-electric strength before filtration and after filtration complete all as directed by the Engineer-in-Charge.6000Litre
165Supply and topping up of transformer oil with di-electric strength not less than 60 KV in to the conservator tank/ body tank of the transformer/ OCB/ FRMUs etc at various locations complete all as directed by the Engineer-in-Charge. \nMake: Power oil/ Transol/ Sabitha Chemicals500Litre
176M&L for rewinding of distribution (HT/LT) transformers of capacity (100 KVA to 750 KVA)/ type by winding the defective coils with new copper wire as per I.S. of same gauge and existing size together with new insulated materials/ bracings before placing in to the transformer and assembling the coil with new insulation and fitting the coils in the chamber, testing and commissioning the transformer and recording the test results complete all as directed.\n[Note: M&L for re-insulation of serviceable coils will be measured & paid separately under relevant items.]180KG
187M&L for re-insulating windings of HT/ LT distribution transformers of capacity ( 100 KVA to 750 KVA) / size/ type by strip opening of HT/ LT coils (i.e. Primary/ secondary coils) from core assembly safely, unwinding the HT/ LT coils (i.e. Primary/ secondary coils) complete, removing the old defective insulation paper and replacing with new DPC insulation to the copper conductor, re-varnishing of the windings with super varnish including heating/ drying/ backing complete carefully and thoroughly inside the heating chamber at suitable temperature to obtain required value of insulation resistance etc. all as per IS 1986-87 and as directed by Engr-in- charge.360KG
198Disconnection of the Distribution Transformer from HT and LT supply mains, removing of Bus duct and Bus bar, Leakage arresting to following transformers by draining out of oil, after arrangement of necessary empty oil drums, buckets etc., dismantling of top cover and accessories, dismantling of LT bushings by disconnecting leads/jumpers from inside, replacement of gaskets and oil seals and re fixing of the LT bushings, making internal and external connections, replacement of cover gasket and accessories, refixing of accessories and cover, filling of transformer oil complete, and making cable connections and for energising the transformer. (Cost includes materials like gaskets and oil seals and labour, the Bushing and bushings rods to be measured and paid separately).
208.01(a) 2500 to 3150 KVA1Each Job
218.02(b) 500 KVA to 750 KVA1Each Job
228.03(c) 250 KVA to 400 KVA1Each Job
238.04(d) up to 200 KVA1Each Job
249Disconnecting the HT/LT connections of following transformers i.e (Bus duct / Cable bunch) keeping all the cables out from the HT/LT sides, physically checking the transformer for healthiness, performing the transformer tests like Meggar test, Ratio Test, Magnetic Balance test and short circuit tests for checking the condition of transformer complete and test results shall be submitted by the contractor. \nNote:- (i) If the transformer found satisfactory then HT/LT connections shall be done by the contractor and has to charge the transformer. \n(ii) If the transformer fails in these tests then the contractor has to shift the transformer for winding /overhauling. \n(iii) Cost of Transportation / winding / overhauling is exclusive of rate quoted by the contractor.
259.01(a) 2500 KVA to 3150 KVA1Each Job
269.02(b) 500 KVA to 750 KVA1Each Job
279.03(c) 250 KVA to 400 KVA1Each Job
289.04(d) up to 200 KVA1Each Job
2910Shifting the Transformer from existing site to another site within 3 Km distance range by Dismantling of HT and LT cables, jumpers and bus bars including LT busbar cable boxes and close the transformers for loading in to Vehicle with the help of crane, transportation to another site, unloading, cable connections both HT and LT, testing and commissioning.
3010.01(a) 500 KVA to 750 KVA1Each Job
3110.02(b) 250 KVA to 400 KVA1Each Job
3210.03(c) up to 200 KVA1Each Job
3311M&L for replacement of Silica gel breather assembly complete with breather unit and silica gel including connecting with proper necessary gaskets if necessary, including removing the unserviceable breather assembly.
3411.01(a) 2500 KVA to 3150 KVA2Each
3511.02(a) 500 KVA to 750 KVA4Each
3611.03(b) 250 KVA to 400 KVA4Each
3711.04(c) up to 200 KVA6Each
3812Supply and filling Silica gel to the transformer breather of transformer including removing the unserviceable silica gel3KG
3913M&L for replacement of Conservator tank complete unit and including connecting with proper necessary gaskets if necessary, including removing the unserviceable Conservator tank.
4013.01(a) 500 KVA to 750 KVA1Each
4113.02(b) 250 KVA to 400 KVA1Each
4213.03(c) up to 200 KVA1Each
4314M&L for replacement gun metal drain valves of transformers of following capacities including dismantling old one. \nMAKE :- UPADHYAY/ LEADER/ ZOLOTO
4414.01(a) 500 KVA to 750 KVA1Each
4514.02(b) 250 KVA to 400 KVA2Each
4614.03(c) up to 200 KVA2Each
4715Supply and fix in repairs off load tap changer assembly suitable for any make with 7 tapping position including opening top cover, conservator etc.
4815.01(a) 500 KVA to 750 KVA1Each
4915.02(b) up to 400 KVA1Each
5016Supply and replacement of (WTI) Winding Temperature Indicator of following distribution transformers including dismantling old one
5116.01(a) 500 KVA to 750 KVA2Each
5216.02(b) up to 400 KVA4Each
5317Supply and replace LT Bushings made out Porcelain and suitable length/size all as per existing, complete the following capacity distribution transformers of any make/size/type all as directed including dismantling old one.
5417.01(a) 500 KVA to 750 KVA3Each
5517.02(b) 250 KVA to 400 KVA6Each
5617.03(c) up to 200 KVA6Each
5718Supply only HT Bushings made out Porcelain and suitable length/size all as per existing, complete the following capacity distribution transformers of any make/size/type all as directed including dismantling old one.
5818.01(a) 500 KVA to 750 KVA6Each
5918.02(b) 250 KVA to 400 KVA12Each
6018.03(c) up to 200 KVA9Each
6119Supply only LT Bushing rod made out of Brass/Copper with threading and suitable length/size all as per existing metal parts / bolts etc, complete the following capacity distribution transformers of any make/size/type all as directed including dismantling old one.
6219.01(a) 500 KVA to 750 KVA6Each
6319.02(b) 250 KVA to 400 KVA9Each
6419.03(c) up to 200 KVA9Each
6520Supply only HT Bushing rod made out of Brass/Copper with threading and suitable length/size all as per existing including metal parts / bolts etc, complete the following capacity distribution transformers of any make/size/type all as directed including dismantling old one.
6620.01(a) 500 KVA to 750 KVA6Each
6720.02(b) 250 KVA to 400 KVA9Each
6820.03(c) up to 200 KVA9Each
6921M&L for replacement of (OTI) Oil Temperature indicator of following distribution transformers including dismantling old one.
7021.01(a) 500 KVA to 750 KVA1Each
7121.02(b) 250 KVA to 400 KVA3Each
7221.03(c) up to 200 KVA3Each
7322M&L for providing new cable box made out of MS sheet of thickness not less than 3.15 mm including fabrication works, welding etc. to suit the LT/HT side of existing transformer size, including nuts, bolts, cable glands, termination of existing cables etc., all as directed by the Engineer-in-charge for the following capacity transformers:
7422.01(a) 500 KVA to 750 KVA1Each
7522.02(b) 250 KVA to 400 KVA1Each
7622.03(c) up to 200 KVA1Each
7723M&L for replacement of Drain plugs to valves/conservator caps of the sizes 3/4\", 1\", 1.5\" valves and plugs of the following capacity distribution transformers of any make/size/type all as directed including dismantling old one.
7823.01(a) 500 KVA to 750 KVA4Each
7923.02(b) 250 KVA to 400 KVA8Each
8023.03(c) up to 200 KVA6Each
8124M&L for replacement of Oil gauge glass with gaskets of the following capacity distribution transformers of any make/size/type all as directed including dismantling old one.
8224.01(a) 500 KVA to 750 KVA1Each
8324.02(b) 250 KVA to 400 KVA2Each
8424.03(c) up to 200 KVA2Each
8525M&L for preparation of old painted surfaces of transformers with coarse cloth/ brush and painting throughout externally on exposed surfaces with two coats of smoke grey colour synthetic enamel paint including writing of transformer details on plinth in white enamel paint on black enamel paint back ground complete including one coat of white wash for base foundation all as specified and directed by Engineer-in-charge for the following capacity in-door/ out-door type transformer:-
8625.01(a) 500 KVA to 750 KVA6Each
8725.02(b) 250 KVA to 400 KVA8Each
8825.03(c) up to 200 KVA10Each
8926Clearing of bushes/small plants up to root level around and surroundings areas E/M installations (i.e.Two Pole/ Four structures, outdoor-substation yards, pump house & Misc E/M installations etc) including surface dressing n.exc 15 cm deep and removing debris to a distance n.exc 50m complete all as directed2000Sqm
9027Supply and lay Graded coarse aggregate of size 40 mm dia size ( loose filling) in outdoor sub-station yards all as directed80Cum
9128Supply and lay Graded coarse aggregate of size 20 mm dia size ( loose filling) in outdoor sub-station yards all as directed80Cum
9229Excavation in trenches n.exc 1.5mtr wide and not exc 1.5mtr depth and getting out in Soft/loose soil all as directed.40Cum
9330Returning and filling in of excavated material any type including spreading, leveling, watering and well ramming in layers not exceeding 25 cm each all as directed.27Cum
9431Removal of surplus excavated material of any type not exceeding 50 mtr and depositing where directed at a level not exceeding 1.5 mtr above the starting point all as directed.13Cum
9532M&L for Sand cushioning/sand covering for underground cable protection complete all as specified.\nNote: Punned thickness only will be measured and paid.8Cum
9633Supplying and laying reinforced precast concrete cable cover, class HV, Type 1, flat, size 300mmx l80mm x 40mm, laid along alignment of cable as protection to cable in trenches complete all as specified and directed by Engineer-in-Charge550Each
9734M&L for GI pipe light grade 100 mm dia for cable protection on road crossings /plinth protection with fixed to the pole wall etc. suitable fittings for cable protection . \nMake: Surya Roshni Ltd / Tata/ Jindal steel / Prakash12RM
9835M&L cable jointing kit for 11 KV (Earthed) grade XLPE cable for outdoor end termination heat shrinkable type joint complete with jointing material and accessories suitable for size 3 core 120 to 185 Sqmm including testing after jointing complete all as directed. \nMake: M-Seal/ 3M/ Raychem/ Denson2Each
9936M&L cable jointing kit for 11 KV (Earthed) grade XLPE cable for outdoor end termination heat shrinkable type joint complete with jointing material and accessories suitable for size 3 core 240 to 300 Sqmm including testing after jointing complete all as directed. \nMake: M-Seal/ 3M/ Raychem/ Denson2Each
10037M&L cable jointing kit for 11 KV (Earthed) grade XLPE cable for straight through heat shrink type joint complete with jointing material and accessories suitable for 3 core XLPE armored aluminium conductor cable of size 120 to 185 Sqmm including testing after jointing complete all as directed. Make: M-Seal/ 3M/ Raychem/ Denson2Each
10138M&L cable jointing kit for 11 KV (Earthed) grade XLPE cable for straight through heat shrink type joint complete with jointing material and accessories suitable for 3 core XLPE armored aluminium conductor cable of size 240 to 300 Sqmm including testing after jointing complete all as directed. Make: M-Seal/ 3M/ Raychem/ Denson2Each
10239S&L XLPE insulated, screened, PVC bedded galvanised steel strip or wire armoured ,electric power cables heavy duty with aluminium conductor, 11000 Volts grade (earthed) of size 3 core 185 Sqmm complete in trenches/ ducts/ on pole etc complete all as directed. \nMake: Universal/ CCI/ Finolex/Havells/RPG120RM
10340S&L XLPE insulated, screened, PVC bedded galvanised steel strip or wire armoured ,electric power cables heavy duty with aluminium conductor, 11000 Volts grade (earthed) of size 3 core 240 Sqmm complete in trenches/ ducts/ on pole etc complete all as directed. \nMake: Universal/ CCI/ Finolex/Havells/RPG40RM
10441M&L cable jointing kit for 11 KV (Earthed) grade XLPE cable for indoor end termination heat shrinkable type joint complete with jointing material and accessories suitable for size 3 core 120 Sqmm to 185 Sqmm including testing after jointing complete all as directed.\nMake: M-Seal/ 3M/ Raychem/ Denson2Each
10542M&L cable jointing kit for 11 KV (Earthed) grade XLPE cable for indoor end termination heat shrinkable type joint complete with jointing material and accessories suitable for size 3 core 240 to 300 Sqmm including testing after jointing complete all as directed. \nMake: M-Seal/ 3M/ Raychem/ Denson2Each
10643M&L cable jointing kit for 33 KV (Earthed) grade XLPE cable for outdoor end termination heat shrinkable type joint complete with jointing material and accessories suitable for size 3 core 300 Sqmm including testing after jointing complete all as directed. \nMake: M-Seal/ 3M/ Raychem/ Denson2Each
10744M&L cable jointing kit for 33 KV (Earthed) grade XLPE cable for straight through heat shrink type joint complete with jointing material and accessories suitable for 3 core XLPE armored aluminium conductor cable of size 240 to 300 Sqmm including testing after jointing complete all as directed. \nMake: M-Seal/ 3M/ Raychem/ Denson1Each
10845M&L for detecting HT 11KV UG cable faults located in any stretch/ depth with sophisticated cable fault locator consisting of microprocessor based pre-locator system, HV surge generator, fault pin point surge wave receiver, cable identification instrument , cable tracer for exact location of under ground cable routes. Note: The rate quoted deemed to be inclusive of transportation of equipment and charges for service engineer . The fault locator will be issued by department for operation.4Each Job
10946M&L for repair and servicing of HT (HT 11 KV) four pole structure by replacing Aluminium PG clamps, GI bolts and nuts, pieces of ACSR conductor with insulation sleeve RYB of any size as jumpers including lubricating the moving parts of AB switch and cleaning of all disc and pin insulators and applying silicon compound for prevention of arcing due to dust/ salt deposits over the surfaces including preparation of surfaces, applying zinc chromate primer on rusted surfaces and applying one coat of aluminum paint to the entire structure complete all as directed. Note:-Rate quoted shall be inclusive of two coats of white wash on exposed concrete .4Job
11047All as per item No. 46 above but for two pole structure4Job
11148M&L notice plate of 1.6 mm thick mild steel sheet vitreous enameled white, with letters figures and conventional skull and bones in signal red colour and fixed with MS clamps bolts and nuts of approved size for HT 11 KV of size 25 x 20 cm10Each
11249M&L cross arms, bracing, supports, clamps and back plates fabricated from structural steel sections including nuts, bolts, washers, welding, bending cold or hot, drilling holes for bolts in any shape or size as indicted and inclusive of one primer coat one under coat and two finishing coat of aluminium paint including dismantling old one. .0.25Per Qtl
11350M & L for disc insulator porcelain vitreous brown 145 mm height & 225 mm dia ball and socket type two in series assembly with cast aluminium 4 U bolt tension hardware and tension clamps for conductors working pressure HT 11 KV complete including dismantling old one all as specified & directed.6Each Set
11451Material for pin insulator porcelain vitreous brown insulator including one galvanised mild steel spindle two galvanised iron washers and one galvanised iron nut for 11000 volts grade 205 mm dia & 215 mm height, complete including dismantling old one all as specified6Each
11552All as per Sl Item No. 51, but post type insulator including dismantling old one.5Each
11653Supply and install HT 11 KV, 200 Amp outdoor type gang operated single break switch Tilting type vertical mounting consisting of hot dip galvanised channel iron base having 2 Nos 11 KV Post type insulator in stack and 3 stack per phase copper or copper alloy high pressure heavily tinned contacts plated MS arcing horns capable of breaking the magnetizing current complete with horizontal connecting bar GI pipe as down rod levers coupling & operating handle with locking arrangement complete.4Each
11754Supply and install drop out lift OFF HT 11 KV, 200 Amp fuse link consisting of channel iron base having 2 Nos 11 KV post type insulators in stack & 2 stack per phase complete with fuse carrier of SRBP tube with heavily tinned non ferrous metal parts and spring loaded phosphor bronze contact complete manufactured as per IS 9385 Complete3Set
11855M&L for earthing complete with GI earth plate electrode of size 60cm x 60cm x 6 mm thick buried directly in ground (earth pit not less than 2.25 m deep below ground level) with top edge of the plate not less than 1.5m below the normal ground level connected with GI strip 32 x 6mm by means of bolts, nuts, check nuts & washers of galvanized iron steel including necessary excavation and earth work in any type of soil, removing surplus soil to a distance not exc 50m, with and including PCC chamber in PCC (1:2:4), type B1,using (20mm graded stone aggregate), \"mild steel angle iron frame\" made out of MS angle iron of size 40x 40 x 6 mm thick duly painted with two coats of synthetic enamel paint over one coat of red oxide zinc chrome primer hinged with and including 6mm thick CI cover with handle, watering arrangement with funnel internally secured with wire mesh with 20mm dia medium grade pipe for watering 40mm dia light grade, GI pipe for lead protection in & including alternate layers of charcoal dust and common salt complete all as shown in electrical plate No '3' and connected to earthing test point all as specified and indicated including testing on completion including retrieving old GI earth plate, CI cover, GI pipes, angle iron frame from existing earthing as directed.24Each Set
11956S & F following spares of GOD 11 KV grade, 200 Amp rating in position as in repairs including testing after repairs
12056.01(a) Male contact3Each
12156.02(b) Female contact3Each
12256.03(c) Tinned copper flexible jumper6Each
12356.04(d) MS Jumper carrier6Each
12456.05(e) Back connector plate10Each
12557Disconnect and taking out the IDMT/ Numeric/ Microprocessor based relay of any type of any Make from 11 KV HT panel, cleaning the contacts, calibrating the relay by conducting secondary injection tests, checking of current transformer, rectification of defects in control wiring for proper tripping of circuit breakers through CTs and relay and tripping coils, adjustment/setting to plug and time multiplier settings of the relay to achieve the discrimination in tripping, tune/synchronise upstream breaker relay settings, re-installation of relay, testing & commissioning etc complete all as specified and as directed.6Job
12657.01Note: The Contractor has to arrange necessary testing Kits, testing equipments, tools etc. Rental rates for the testing/calibration kits & connected equipments are deemed to be included in the quoted rate. Testing & tuning shall be carried out in the presence of representative of the Department, to the satisfaction of the Department.
12758Taking down HT switch gear (Vacuum circuit breaker ) of capacity 11 KV 250/350 MVA comprising of following repairs, overhauling, servicing, carrying out preventive maintenance and refixing the same after repairs/ overhauling:10Job
12858.01(a) Tripping off the breaker, lowering the breaker with raising/lowering handle and pulling out the breaker complete from the panel along with the trolley for servicing/inspection/overhauling
12958.02(b) Servicing/Inspecting/checking of automatic safety shutter operation for serviceability and replacement of spares if required.
13058.03(b) Servicing/Inspecting/checking of circuit spout and circuit spout connections for RYB phases and replacement of spares if required.
13158.04(c) Dismantling and checking of cross bar assembly, fixed contacts and current carrying parts of the breaker, trolley, insulated assembly and checking lamination with clamps, epoxy spout, isolator assembly etc.
13258.05(d) Setting, reassembling, cleaning, adjustment of fixed contacts, main contact, arcing contacts and chamber baffle pot assembly, moving contact for proper setting of auxiliary contacts operating mechanism.
13358.06(e) Servicing/Inspecting/checking of secondary sockets/busbar earthing plugs/earthing sockets and replacement of spares if required.
13458.07(f) Checking, setting and adjustment of lowering and raising operation of the breaker trolley.
13558.08(g) Decarbonising of busbar and connected items
13658.09(h) Lubrication and greasing of all moving parts of the trolley, stopper bolt for proper operating and closing of shutter gear, isolation resistance of trolley of with vacuum interrupter assembly.
13758.1j) The inspection of HT switch gear shall involve:-\n(i) Inspection of truck & hoist assembly.\n(ii) Inspection of tank assembly & barriers.\n(iii) Inspection of assembly & components of solenoid assembly.\n(iv) Inspection of assembly & components of dependent mechanism.\n(v) Inspection of assembly & components of spring box mechanism.\n(vi) Inspection of motor mechanism spring charge assembly \n(vii) Inspection of assembly of trip unit & related components
13858.11Notes: (i)The servicing includes for busbar duct chamber, cable alleys and connecting accessories \n(ii) The rate quoted shall be deemed to include for necessary T&P, nuts, bolts, washers, gasket, insulation tape, compound, painting of VCB panels with approved colour including lettering details all as per existing etc. to put in to the VCBs and panels in serviceable condition, testing and commissioning all as specified and as directed by the Engineer-in-Charge.\n(iii) Major spares like Breaker bushings, vacuum interrupter assly, busbar spout, busbar spout connections, circuit spout/circuit spout connections/buffer fixed contacts, moving contacts, tank assly/barriers, solenoid spares, dependent/spring mechanism/ motor mechanism, trip unit etc will be measured and paid separately under relevant items of Schedule 'A'. However the rate quoted shall be deemed to include for any other minor spares require replacement. \n(iv) the servicing shall be carried out by Auhtorised service centre as approved by GE
13959Supply only the following spares suitable for 250 MVA to 450 MVA HT switch gear VCBs and 11 KV HT panel repair work under relevant Schedule
14059.01CTs epoxy cast wound primary CTs with minimum primary current 60 to 400 A, single/ double ratio, double core (Protection core-5P10 & Metering core- Class 1.0), 25 KA for 1 sec of 15 VA minimum Burden.3Each
14159.02Supply only 1.5 sqmm flexible PVC stranded copper conductor cable, unsheathed, 1100 V grade for control wiring.90RM
14259.03Supply only 2.5 sqmm flexible PVC stranded copper conductor cable, unsheathed, 1100 V grade for control wiring.90RM
14359.04LED Indication Lamps8Each
14459.05Shunt trip coil 110 V DC/220 V DC1Each
14559.06Shunt trip coil 110 V DC/220 V DC with assembly1Each
14659.07Breaker control switch2Each
14759.08Busbar Spout3Each
14859.09Circuit spout3Each
14959.1Control circuit fuses 2 A to 63 A24Each
15059.11HRC fuse (PT HT side)6Each
15159.12PT plug contact3Each
15259.13Multifunction meter, Digital type (Displaying A, V, PF, Hz, KVA, KW, KVAR, KWh, Karsh etc.) Class 1/0.5 with RS485 port for communication in Modbus protocol. Make : L&T, Conzerve, HPL (SOCOMEC).2Each
15359.14VCB buffers3Each
15459.15110 Volt DC closing coil assembly3Each
15559.16Push to trip knob red assembly2Each
15659.17Push to trip knob green assembly2Each
15759.18Ratchet wheel2Each
15859.19Nylon release lever3Each
15959.2VCB charging powl3Each
16059.21Shutters for racking shaft2Each
16159.22Bus bar support insulator for VCB panel3Each
16260Supply and replace 2V, DC, VRLA cell and arrange properly with connecting leads inside battery rack suitable for control DC circuit of 11 KV VCBs and after assembling required voltage is 110V / 200AH including taking down old complete all as specified and directed by Engineer-in-Charge. Make: AMARA RAJA / EXIDE / AMARON55Each
16361M&L for repairs/servicing of 36 KV outdoor VCBs of (Areva) Schneider make with mechanism comprising of the following:-\n(a) Cleaning of vacuum interrupter limbs for dust, oxidising and decarbonising with CTC.\n(b) Repair/servicing of spring loaded operating mechanism\n(c) Repair/servicing of spring charging motor \n(d) Checking, repairing & servicing of gearbox, auxiliary switches, spring, limit switch etc complete\n(e) Checking & repairing electrical and mechanical operations\n(f) Checking & Repairing remote closing and tripping of VCB from 33KV control panel.\n(g) Lubrication all moving parts with petroleum jelly & cleaning all bushing insulators with CTC\n(h) Tightening of all mechanical connections of mechanism\n(i) Tightening all HV and LV connection of VCB.\n2Job
16462Supply only the following spares for servicing/repairing of 36 KV Circuit breaker of type of make Areva.
16562.01(a) ON/OFF indicator link3Each
16662.02(b) Motor Cut off Switch1Each
16762.03(c) Motor for spring charging (Make: Bosch)1Each
16862.04(d) Auxiliary contactor1Each
16962.05(e) Drive link Assembly1Each
17062.06(f) Auxiliary switch arrangement with Bell crank assly & operating link1Each
17162.07(g) Trip coil3Each
17262.08(h) Release coil3Each
17363Disconnect and taking out the Numeric/ Microprocessor based relay of any type/ of any Make from 33 KV HT panel, cleaning the contacts, calibrating the relay by conducting secondary injection tests, checking of current transformer, rectification of defects in control wiring for proper tripping of circuit breakers through CTs and relay and tripping coils, adjustment/setting to plug and time multiplier settings of the relay to achieve the discrimination in tripping, tune/synchronise upstream breaker relay settings, re-installation of relay, testing & commissioning etc complete all as specified and as directed.3Job
17463.01Note : The Contractor has to arrange necessary testing Kits, testing equipments, tools etc and shall also submit detailed test reports, panel wise, duly spiral bound. Rental rates for the testing/calibration kits & connected equipments are deemed to be included in the quoted rate. Testing & tuning shall be carried out in the presence of representative of the Department, to the satisfaction of the Department.
17564M & L for preparation of old painted surfaces of steel by brushing/cleaning stain, greasy spots with thinner, applying two coats of spray painting (synthetic enamel paint) all sides with spraying machine to 33 KV, outdoor VCB-06 Nos/AB switch gear control ,CTs, PTs and In door 11 KV VCB 21 Nos etc disconnecting of power supply and including writing description of equipment in block English letter 50 mm with white /black synthetic enamel paint all as specified and directed.1Each Job
17665M/L for inspecting, checking, servicing of 33KV Lightening arrestors by decarbonising of lighting arrestors, tightening all earthing connections and HV connections for proper contact, application of petroleum jelly of electrical connection, replacement of corroded nuts and bolts etc Complete6Job
17766M/L for inspecting, checking, servicing of 33 KV Disc/post top insulator by carrying out the following:-\na) Checking insulator for any cracks & pitting\nb) Checking the inter locking pins for corrosion and replacing if necessary. cleaning/decarbornising with CTC.\nc) Replacing the corroded, rusted nuts &bolts of clamps having conductors if necessary. \nd) Tightening of all supporting connections.6Job
17867M/L for repairing/ Servicing of 33 KV/110 V PT(outdoor):\na) Checking PT limb(Ceramic insulator) for any cracks, pitting and burns\nb) Cleaning/decarbonising with CTC\nc) Replacing insulator oil with New Oil.\nd) carrying/conducting ratio test.\ne) Tightening all primary and secondary connections.\nf) Tightening all basement fixing nuts & bolts.3Job
17968M/L for Servicing of 33/11 KV CT(outdoor):\na) Checking CT limb for any cracks, pitting and burns\nb) Cleaning/decarbonising the limbs with CTC\nc) Complete drain out of old insulating oil and filling new insulator oil.\nd) conducting ratio test.\ne) Tightening all primary and secondary connections.\n6Job
18069M/L for repairing & servicing of 33KV gang operated air break isolator & earth switch comprising the following:\na) Cleaning of contact for dust, oxidation & pitting with CTC.\nb) Cleaning of all insulators with CTC and observing any cracks and carbon deposits/contents.\nc) Repairing, adjusting the rotating arms for perfect operation including lubrication with petroleum jelly. \nd) Repairing/replacement of tension spring in fixed contacts.\ne) Lubricating of all moving parts for smooth operation.\nf) Checking of auxiliary contacts and their calibration\ng) Applying petroleum jelly to all electrical contacts/moving contacts.\nh) Tightening of all electrical and mechanical connections.\n6Job
18169.01Note for Item No.66 to 69 : The rate quoted deemed to be inclusive of Consumables like nuts & bolts, washers, petroleum jelly, CTC etc & T&P etc complete and necessary safety measures for working in 33 KV yard.
18270M&L for preparation of steel surfaces of 33 KV structural yard consisting of GODs, CTs, PTs, surge monitors and circuit breakers including yard structures and painting with a coat of Zinc chromate primer on rusted surfaces & applying a coat of rich zinc mix aluminum paint for structures and approved colour synthetic enamel paint on switch gears, transformers etc complete including preparation of surfaces etc. complete all as directed.2Job
18371M & L for preparation of old painted surfaces of steel by brushing/cleaning stain, greasy spots with thinner, applying two coats of spray painting (synthetic enamel paint) all sides with spraying machine to 33 KV (2.5/3.15 MVA -02 No) transformer and its accessories in the yard after disconnecting of power supply and including writing description of equipment in block English letter 50 mm with white/Black synthetic enamel paint all as specified and directed.2Each Job
18472Spraying the herbicide with 5 liter hand pump (with sufficient herbicide to water ratio that can destroy vegetation) to destroy the unwanted vegetation as directed by Engineer-in-charge.6000Sqm
18573M&L for replacement of Bucholtz relay for transformer of capacity 1600 KVA to 3150 KVA2Each
18674M&L for replacement of winding temperature indicator (WTI) for 2500/3150 KVA, 33/11KV transformer including dismantling old one1Each
18775M&L for replacement of oil temperature indicator (OTI) for 2500/3150 KVA ,33/11KV transformer including dismantling old one1Each
18876M&L for carrying out following onsite test with testing equipments and all as directed for 33/11 KV transformer of any capacity:-\ni) IR Test\nii) Magnetic imbalance test\niii) Ratio test\niv) Di-electric test of oil\nv) Flame test1Job
18977S&F in repair insulating mat class-c/voltage grade up to 33 kv (AC) as per IS:15652:2006 with ISI marked of thickness 2.0 mm +/- 10% of approx width 1.0 meter along with suitable adhesive/homebound, resin, waterproofing compound and sealing material all as per IS complete all as directed.60Sqm
19078Preparing the flat/chequered plate surface for painting and painting the same with black paint all as directed.60Sqm
19179Supply and fix copper bare conductor of 6/8 mm dia for overhead earth grid as required including making arrangements for connections all as directed by Engineer-in-charge.\n50Kg

AI Tender Summary

OUR REF NO 21917428
AUTHORITY Statutory Bodies & Commissions/Committees
TENDER VALUE 36 Lakhs
LAST DATE 15-10-2019
Authority
Authority Name Military Engineer Services
Work Description Repair/Maintenance To The 33/11 Kv Mrs Yards , Vcbs And Ht Distribution Systems At Nad , Bvy Yard , Abe Park , Nad Colony , Old Mo ( V ) , Ctw And Ins Viswakarma Under Age E/M No-Ii Of Ge ( U-I ) , Visakhapatnam , M&L For Disconnecting Carefully Electrical Connection From Both Ht/ Lt ( Primary & Secondary ) Sides Of The Transformer , Keeping Them At Safe Side And Taking Out The Transformer/Voltage Stabiliser Indoor/ Outdoor Type Of Capacity 250 Kva To 750 Kva , 11 Kv/433Kv , Step Down Any Make For Carrying Out Complete Overhauling Which Shall Comprise Of The Following:- , ( A ) M&L For Lifting , Transporting , Handling The Transformer To Workshop And Opening Top Cover Of The Transformer By Unscrewing Nuts , Bolts , Washers Etc . Including Disconnecting Core Assembly From Ht/ Lt Bushing And Lifting The Same Gently And Taking Out From The Shell ( Container/ Body ) Of The Transformer . , ( B ) M&L For Draining Out Transformer Oil From The Above Said Transformer In The Suitable Capacity Of Container /Drums And Keeping It In Safe Custody For Reuse . , ( C ) M&L For Cleaning The Transformer Body From Inside , Removing Deposited Dirt/ Sludge/ Foreign Particles Etc . From The Bottom/ Body Of The Transformer And Drying Up The Shell From Inside Before Refilling Of The Transformer Oil . , ( D ) M&L For Cleaning And Washing Thoroughly Core And Windings Of The Transformer By Hosing Down With Clean Dry Oil Conforming To Is 335/1983 , Removing Deposited Dirt/Sludge/Foreign Particles From The Windings/ Core , Thorough Inspection Of Windings , Providing Insulations To Leads And Terminals , Heating/ Drying/ Baking Complete Carefully And Thoroughly Inside The Heating Chamber At Suitable Temperature To Obtain Required Value Of Insulation Resistance Etc . All As Directed By Engr-In- Charge . , ( E ) Lifting And Refixing Core Assembly Inside The Transformer Shell Gently And Carefully , Connecting Primary/ Secondary/ Neutral Connections To The Bushings Assembly , Fixing Of Tap Change Over Including Tightening Of Nuts , Bolts , Washers Of The Core To Reduce Humming Noise All As Directed . , ( F ) Refilling The Filtered Transformer Oil In The Shell Of Transformer Complete . , ( G ) Refixing The Top Cover Including Replacement Of Cork Sheet/ Gasket 8Mm Thick , Tightening Of Nuts/ Bolts/ Washers Etc . And Replacement Of Breather With Silica Gel Crystal Type All As Directed By Engr-In Charge , ( H ) Lifting/ Shifting To The Place From Where Removed Or To Any Location As Directed And Re-Installing The Transformer Including Connecting Primary/ Secondary/ Neutral Connections Etc . All As Directed By Engr-In-Charge . , ( J ) The Inspection Of Transformer Shall Involve:- ( I ) Checking Of All Clamps , Nuts , Bolts Including Core Bolts & Cover Fixing Bolts . ( Ii ) Checking All Brazings , Joints , Tap Heads And Connection Joints . ( Iii ) Checking All Jumpers , Terminations/ Connections Inside The Transformer . ( Iv ) Checking The Bucholtz Relay/ Conservator Mog If Any . ( V ) Painting Of Transformer Complete With Two Coats Of Synthetic Enamel Paint Externally Transformer Shell Complete All As Directed By Engr-In-Charge . ( Vi ) Inspection Of Tap Changer , Checking The Moving And Fixed Contacts For Contact Wear And Connection To Winding . , ( K ) Conducting The Tests On Core And Windings As Per Is Like Ratio , Magnetic Imbalance , Short Circuit Etc . In Presence Of Engr-In-Charge And Test Results Shall Be Signed Both By The Contractor And Engineer -In-Charge And Kept On Record . , Note:- ( I ) Any Damage To Insulators/ Bushes/ Windings Etc . While In The Custody Of The Contractor Shall Be Made Good At No Extra Cost To Department . The Serviceability Of The Transformer Shall Be Checked And Confirmed By The Contractor Before Taking Into His Custody . ( Ii ) M&L For Rewinding/ Re-Insulation Of Ht/ Lt ( Primary/ Secondary ) Coils , Bushes , Studs , Transformer Oil , Cable Box , Replacement Of Bucholtz Relay/ Mog If Any Etc Will Be Measured And Paid Separately . , All As Per Item No . 1 Herein Before But Transformer/Voltage Stabiliser Indoor/ Outdoor Type Of Capacity Up To 200 Kva , M&L For Replacement Of Damaged Space Heater In Ht Vcb 11 Kv With New One Suitable To Operate On 110 Volts Dc Supply Complete With Necessary Wiring And Control Cable With Toggle Switch And All As Directed By Engr-In-Charge . , Filtration Of Transformer Oil Of Transformers/ Frmus Installed At Various Locations To Achieve Di-Electric Strength Not Less Than 60 Kv At 2 . 5Mm Gap As Per Relevant Is With Portable Filtration Plant , Testing Of The Oil For The Di-Electric Strength Before Filtration And After Filtration Complete All As Directed By The Engineer-In-Charge . , Supply And Topping Up Of Transformer Oil With Di-Electric Strength Not Less Than 60 Kv In To The Conservator Tank/ Body Tank Of The Transformer/ Ocb/ Frmus Etc At Various Locations Complete All As Directed By The Engineer-In-Charge . Make: Power Oil/ Transol/ Sabitha Chemicals , M&L For Rewinding Of Distribution ( Ht/Lt ) Transformers Of Capacity ( 100 Kva To 750 Kva ) / Type By Winding The Defective Coils With New Copper Wire As Per I . S . Of Same Gauge And Existing Size Together With New Insulated Materials/ Bracings Before Placing In To The Transformer And Assembling The Coil With New Insulation And Fitting The Coils In The Chamber , Testing And Commissioning The Transformer And Recording The Test Results Complete All As Directed . [Note: M&L For Re-Insulation Of Serviceable Coils Will Be Measured & Paid Separately Under Relevant Items . ] , M&L For Re-Insulating Windings Of Ht/ Lt Distribution Transformers Of Capacity ( 100 Kva To 750 Kva ) / Size/ Type By Strip Opening Of Ht/ Lt Coils ( I . E . Primary/ Secondary Coils ) From Core Assembly Safely , Unwinding The Ht/ Lt Coils ( I . E . Primary/ Secondary Coils ) Complete , Removing The Old Defective Insulation Paper And Replacing With New Dpc Insulation To The Copper Conductor , Re-Varnishing Of The Windings With Super Varnish Including Heating/ Drying/ Backing Complete Carefully And Thoroughly Inside The Heating Chamber At Suitable Temperature To Obtain Required Value Of Insulation Resistance Etc . All As Per Is 1986-87 And As Directed By Engr-In- Charge . , Disconnection Of The Distribution Transformer From Ht And Lt Supply Mains , Removing Of Bus Duct And Bus Bar , Leakage Arresting To Following Transformers By Draining Out Of Oil , After Arrangement Of Necessary Empty Oil Drums , Buckets Etc . , Dismantling Of Top Cover And Accessories , Dismantling Of Lt Bushings By Disconnecting Leads/Jumpers From Inside , Replacement Of Gaskets And Oil Seals And Re Fixing Of The Lt Bushings , Making Internal And External Connections , Replacement Of Cover Gasket And Accessories , Refixing Of Accessories And Cover , Filling Of Transformer Oil Complete , And Making Cable Connections And For Energising The Transformer . ( Cost Includes Materials Like Gaskets And Oil Seals And Labour , The Bushing And Bushings Rods To Be Measured And Paid Separately ) . , ( A ) 2500 To 3150 Kva , ( B ) 500 Kva To 750 Kva , ( C ) 250 Kva To 400 Kva , ( D ) Up To 200 Kva , Disconnecting The Ht/Lt Connections Of Following Transformers I . E ( Bus Duct / Cable Bunch ) Keeping All The Cables Out From The Ht/Lt Sides , Physically Checking The Transformer For Healthiness , Performing The Transformer Tests Like Meggar Test , Ratio Test , Magnetic Balance Test And Short Circuit Tests For Checking The Condition Of Transformer Complete And Test Results Shall Be Submitted By The Contractor . Note:- ( I ) If The Transformer Found Satisfactory Then Ht/Lt Connections Shall Be Done By The Contractor And Has To Charge The Transformer . ( Ii ) If The Transformer Fails In These Tests Then The Contractor Has To
Basic Detail
Tender No 8969/E8
Bidding Type Tender
Location
City Garrison Engineer Utility-I Visakhapatnam
State Andhra Pradesh
Key Dates
Publish Date 23 Sep 2019
Submission Date 15 Oct 2019
Open Date 17 Oct 2019
Finance
Tender Value 36 Lakhs
Tender Fee 500
EMD 72000
Exemption Not Available
Document List
8969Tender.pdf
Tendernotice_1.pdf
BOQ_319703.xls
F596D80F-5B63-43ED-8DC2-878733BE9289.html
8969CREDIT.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 23, 2019
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 15, 2019
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Oct 17, 2019

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
pdf

8969Tender.pdf

pdf

Tendernotice_1.pdf

xls

BOQ_319703.xls

html

F596D80F-5B63-43ED-8DC2-878733BE9289.html

pdf

8969CREDIT.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders