Repair And Refixing Of Melting , Mixing And Pre-Coat Pit Coils In Sa Plant , Fact Cd .
Tender Overview
Project Description
Repair And Refixing Of Melting , Mixing And Pre-Coat Pit Coils In Sa Plant , Fact Cd . , Repair And Refixing Of Melting , Mixing And Pre-Coat Pit Coils In Sa Plant , Fact Cd . , Repair & Refixing Of Melting , Mixing And Pre-Coat Pit Coils In Sa Plant:Work Involves:Collect The Required Material/Tools And Tackles From Store/Workshop . Lift And Remove Leaky Coils From The Pit After Isolating The Coils And Providing Equivalent Quantity Of Blind Flanges . Clean The Coil/S , Remove Muck And Other Solid Particles From The Coil/S To Identify The Leak . Identification Of Leak Comes Under The Scope Of The Contractor And Shall Be Done In The Presence Of Competent Personnel From Process Department . Once The Leak/S Are Identified They Shall Be Rectified By Preparing The Spot Necessarily By Grinding , Followed By Welding Using Proper Electrodes . Pressure Test The Coil With 8 Ata Steam To The Satisfaction Of Process Department And Engineer In Charge . Once The Repair Is Complete , Erect The Coil Back , With Proper Gasketting Wherever Necessary . Any Rework On The Coil Pieces , Like The Correction Of Length Involving Cutting And Welding On The Existing Coil/Providing Additional Spool Piece Shall Be Done As Per Instructions From Engineer In Charge And Will Be Under Contractors Scope . The Site Shall Be Cleared From Scrap And Transport The Scrap To Area Earmarked/ Scrap Yard . , Replacing Of Melting , Mixing And Precoat Pit Coils: If Coils Are Found To Be Replaced With New Coil , The Coil Is To Be Collected From The Store And Transported To The Site . Collection Of Coils , Transportation Of The Same And Preparation Of Steam Inlet And Outlet Connections For The New Coils Falls Under The Scope Of The Contractor . Servicing And Replacing Of Steam Trap , Valve , Fittings Etc . , Are Also To Be Done By The Contractor . Cutting And Reducing The Overall Height Of The Coil If Required To Suit The Pit Condition Shall Be Done By The Contractor After Consultation With Th Engineer In Charge . The Erected Coils Shall Be Pressure Tested Using 8 Ata Steam To The Satisfaction Of Process Department And Engineer In Charge .
BOQ
| Name of Work: Repair and Refixing of Melting, Mixing and Pre-coat pit coils in SA Plant, FACT CD. | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Service Code | Quantity | Units | |
| 1 | 1 | Repair and Refixing of Melting, Mixing and Pre-coat pit coils in SA Plant, FACT CD. | |||
| 2 | 1.01 | Repair & Refixing of Melting, Mixing and Pre-coat pit coils in SA Plant:\nWork Involves:Collect the required material/tools and tackles from store/workshop. Lift and remove leaky coils from the pit after isolating the coils and providing equivalent quantity of blind flanges.Clean the coil/s, remove muck and other solid particles from the coil/s to identify the leak.Identification of leak comes under the scope of the contractor and shall be done in the presence of competent personnel from Process department.Once the leak/s are identified they shall be rectified by preparing the spot necessarily by grinding ,followed by welding using proper electrodes. Pressure test the coil with 8 ata steam to the satisfaction of Process department and engineer in charge. Once the repair is complete, erect the coil back,with proper gasketting wherever necessary. Any rework on the coil pieces,like the correction of length involving cutting and welding on the existing coil/providing additional spool piece shall be done as per instructions from engineer in charge and will be under contractor's scope .The site shall be cleared from scrap and transport the scrap to area earmarked/ scrap yard. | CD-16REPAIRCOIL01 | 24 | NO |
| 3 | 1.02 | Replacing of melting ,mixing and precoat pit coils: If coils are found to be replaced with new coil, the coil is to be collected from the store and transported to the site. Collection of coils, transportation of the same and preparation of steam inlet and outlet connections for the new coils falls under the scope of the contractor. Servicing and replacing of Steam trap, valve, fittings etc., are also to be done by the contractor. Cutting and reducing the overall height of the coil if required to suit the pit condition shall be done by the contractor after consultation with th engineer in charge.The erected coils shall be pressure tested using 8 ATA steam to the satisfaction of Process department and engineer in charge. | CD-16REPAIRCOIL02 | 5 | NO |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender