| 1 | 1 | SCHEDULE 'A' (PART -I) | | | |
|---|
| 2 | 2 | Taking down of sealing compound grade 'A' mixed with epoxy compound and removing nylon ropes from construction joints of dispersal and making the surface clean, sweeping the debries and removing the wastage 100 m from work permises complete all as specified and as directed | BI01010001010000000000000515BI0100001114 | 28 | X Running Metre |
|---|
| 3 | 3 | S&F 16 mm dia nylon rope (in Unstreched position) into construction joint in dispersal area into two layers , each after proper cushining with grade \"A\" sealing compound and sealed with polyeurethene based sealant compound COLPAR 200 competely from top & leveling with top surface of existing dispersal slab complete all as specified and as directed. | BI01010001010000000000000515BI0100001115 | 28 | X Running Metre |
|---|
| 4 | 4 | Dismantling wall and ceiling board (fibre,pulp,insulation, etc) or insulation boards/slabs/blankets any thickness including cover fillets complete all as specified. | | 100 | Square Metre |
|---|
| 5 | 5 | Supply and fix Gl frame work for seamless ceiling comprising of Gl perimeter channnel 0.55 mm thick with two unequal flanges of 20 and 30 mm and web of 27 mm fixed to surrounding wall using nylon sleeves and screws at 450 mm centre to centre/intermediate channel 0.9 mm thick having two equal flanges of 15 mm each and web of 45 mm suspended from soffit at approx 900 mm centre to centre with Gl cleat and steel expansion fasteners with and including ceiling section (not exc 1.2 m length) of 0.55 mm thickness having kurled web of 50 mm and flange of 26 mm each with lips of 10.5 mm fixed to the intermediate channel with connecting clips across the intermediate channel at 457 mm centre to centre including necessary hangers6mm dia GI up to1200mm length adjusting level fixed to roof slab by means of cleats made out of FI 40x3mm size 60 cm long and expansion holdfast 12.5mm dia 40mm long with and including 12mm thick gypsum board fixed with screws completely all as specified and as directed. | | 100 | Square Metre |
|---|
| 6 | 6 | M&L Hand rails, half round or other stock section or core for wooden hand-rail straight portion, drilled and countersunk for balusters running bars, for doors, balusters, nosing to steps including embedding in concrete and screwing etc. wind ties for roof including securing bolts; posts and struts in fencing including cutting tops to shape as directed, drilling holes, notching for wire, etc.; flat iron fillets (for securing wire mesh etc.) including all necessary drilling, bolting or riveting, etc., and similar work conforming to Fe 410-0 or Fe 310-0 complete all as specified and as directed. | | 350 | Kilogram |
|---|
| 7 | 7 | M & L for preparing new steel surfaces and applying two coats of synthetic enamel paint over a coat of red oxide primer all as specified and as directed. | | 110 | Square Metre |
|---|
| 8 | 8 | M & L for preparing old painted steel surfaces over 10 cm width or girth and applying two coat of synthetic enamel paint complete all as specified and as directed. | | 440 | Square Metre |
|---|
| 9 | 9 | S&F in repair of sheet glass 5.50 mm thick and glazing with beadings with metal panels of size n. exc 0.50 sqm complete all as specifed and as directed. | | 11 | Square Metre |
|---|
| 10 | 10 | S&F reflective type solar control film of 25 Micron thick complete all as specified and as directed. | | 11 | Square Metre |
|---|
| 11 | 11 | Material and labour for Preparation of old steel surfaces of 10m height hanger steel structure and applying one coat of Epoxy paint complete all as specified and as directed. | | 5225 | Square Metre |
|---|
| 12 | 12 | Material and labour for preparation of old wall/steel surfaces and applying one coat of weather proof exterior acralic paint of comoflage pattern complete all as specified and as directed . | | 540 | Square Metre |
|---|
| 13 | 13 | SCHEDULE 'A' (PART -II)GRASS CUTTING: | | | |
|---|
| 14 | 14 | Cutting of grass and bushes upto ground level by sackle knife / grass cutting machine and scrapping with spades including removal of rubbish to a distance exceeding 1000 m outside the MD land complete all as specified and direected by Engineer-in-Charge.\nNote: \n(a) Grass cutting to be carried around the airfield operational area all as directed by Engineer-In-Charge.\n(b) Each cutting shall be measured separetely.\n(c ) Rate quoted for the item is for each cutting\n(d) For each cutting minimum two tractor and four hand cutting machine are to be incorporated to complete the work with in time frame. | | 128729 | X Square Metre |
|---|
| 15 | Total in Figures | | | | |
|---|