Construction Of Tahasil Record Room At Titilagarh In Balangir District For The Year 2019- 20 Construction Of Tahasil Record Room At Titilagarh In Balangir District For The Year 2019- 20
Tender Value
16.48 Lakhs
Estimated cost
Bid Submission
03 Oct 2019
0 days left
EMD
16500
Bank guarantee accepted
Document Fee
6000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Rate Contract
Location / State
KANTABANJI → Odisha
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Construction Of Tahasil Record Room At Titilagarh In Balangir District For The Year 2019- 20 Construction Of Tahasil Record Room At Titilagarh In Balangir District For The Year 2019-20
BOQ
| Name of Work: Construction of Tahasil Record Room at Titilagarh in Balangir District for the year 2019-20 | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Earth work in excavation of foundation trenches in hard soil including moorum, stoney earth and earth mixed with boulders except sheet rocks and boulders requiring blasting including dressing and levelling the bed upto the required depth and depositing the excavated materials with all leads and lifts, T&P shoring & shuttering if required etc. complete as directed by the Engineer-in-charge. | BI01010001010000000000000515BI0100001113 | 14.15 | Cum |
| 2 | 2 | Supplying filling in foundation and plinth with sand including watering ramming including cost conveyance royalties and taxes of materials and cost of labour T & P required for the work etc. complete as directed by the Engineer-in-charge. | BI01010001010000000000000515BI0100001114 | 4.28 | Cum |
| 3 | 3 | Plain Cement concrete (1:3:6) in foundation 4cm size black hard crusher broken granite stone metals of approved quality from approved quarry including lowering, laying and compacting the concret, watering and curring etc. complete to required levels laid in layers not exceeding 0'-6\" thick including, cost and conveyance royalities and taxes of all materials and cost of all labour T & P required for the work complete as directed by the Engineer-in-charge. | BI01010001010000000000000515BI0100001115 | 1.98 | Cum |
| 4 | 4 | R.C.C. work M-20 in all floors having minimum compressive strength in work test of 200 Kg./Cm2 using 20mm and down graded size black hard cruser broken granite chips including hoisting, lowering laying and compacting the concrete, watering and curring for 28 days including centering and shutering and finishing the exposed surface.smooth providing grooves or beds wherever necesary including cost conveyances, royalities, taxes and cost of labour with T & P required of the work etc. complete in all respect but excluding cost of M.S. Rods or Tor Steel and bending, binding and tying the grills.\n(A) Column in Foundation & Plinth | |||
| 5 | 4.01 | Ground Floor | 5.02 | Cum | |
| 6 | 5 | (B) Column in Superstructure | |||
| 7 | 5.01 | Ground Floor | 1.22 | Cum | |
| 8 | 5.02 | 1st Floor | 5.16 | Cum | |
| 9 | 6 | (C) Lintel | |||
| 10 | 6.01 | 1st Floor | 2.89 | Cum | |
| 11 | 7 | (D) Chajja / Shelves | |||
| 12 | 7.01 | 1st Floor | 9.48 | Sqm | |
| 13 | 8 | (E) Beam | |||
| 14 | 8.01 | 1st Floor | 7.92 | Cum | |
| 15 | 9 | (F) Stair case | |||
| 16 | 9.01 | Ground Floor | 3.42 | Cum | |
| 17 | 10 | (G) Roof Slab | |||
| 18 | 10.01 | 1st Floor | 23.52 | Cum | |
| 19 | 11 | (H) Plinth Bend | |||
| 20 | 11.01 | Ground Floor | 2.37 | Cum | |
| 21 | 12 | Fly ash brick masonary in cement mortar (1:6) using Fly ash bricks of size 23cmx11cmx8cm having crushing strength not less than 75 Kg /cm2 with dimensional tolerance + 2 % after immersing the bricks for six hours in water before use in super-structures including splays cutting circular mouding and corbelling champhering and similar such type, including cost conveyance royality and other taxes of all materials and cost of all labour with T & P required for the work etc. complete. | |||
| 22 | 12.01 | 1st Floor | 52.82 | Cum | |
| 23 | 13 | Supplying, fitting & fixing of Vetrified colour printed series tiles in floor of size 600mmx 600mm of approved make confirming to IS:13755 laid on 25 mm thick cement mortar (1:1) (1 cement : 1 course sand) jointed with slurry mixed with pigment to match the shades of the tiles including rubbing and polishing etc. complete including cost of all materials, labour T&P etc. required for the work all complete as per direction of the Engineer-in-charge | |||
| 24 | 13.01 | 1st Floor | 143.34 | Sqm | |
| 25 | 14 | Supplying, fitting & fixing of Vitrified colour printed series tiles in Wall or Dado of size 600mmx 600mm of approved make confirming to IS:13755 laid on 12 mm thick cement mortar (1:3) (1 cement : 3 course sand) and filling joints with white cement of approved quality including cost of all materials, labour T&P etc. required for the work all complete as per direction of the Engineer-in-charge (for New Work only ) | |||
| 26 | 14.01 | 1st Floor | 18.27 | Sqm | |
| 27 | 15 | Cutting, straightening coiled or bent up M.S. Rod or tor steel (SAIL) including bending, binding, welding and jointing if necessary and tying the grills and placing in position as required for R.C.C. Work , hoisting, lowering, laying including cost, conveyances, taxes of M.S. Rod or tor steel and binding wires of 18 to 20 gauge and labour required for the work for bending, binding and tying the grills(Linear measurement will be taken and quantity will be calculated basing on the standard weight of B.I.S. for M.S. Rods or tor steel only. Lapping, wastage including weight of binding wire will not be considered for measurement) etc. complete as per specification & direction of Engineer-in-charge. | |||
| 28 | 15.01 | 1st Floor | 57.59 | Qntl | |
| 29 | 16 | Supplying fitting and fixng in all floor W.I. grills gates, M.S. gates with top and bottom rails,steel window, critical frames for windows staire case and parapet railing as per approved drawing and design including making holes in walls and R.C.C. structures, wood works etc. and making good the dameges to walls with cement concrete (1:2:4) with black hard crusher broken granite chips of 12mm size complete in all respect including cost of materials labour etc. required form the work complete. (1st Floor) | 980 | Kg. | |
| 30 | 17 | Painting three coats in all floors (Two coats with paints of approved shade and base coat with primer) to new wood/iron work including sand papering, polishing the surface including cost conveyance taxes and royalties of all materials and with T & P required for the work including cost of paints and primer complete in all respect as per direction of Engg-in-charge. | |||
| 31 | 17.01 | 1st Floor | 47.98 | Sqm | |
| 32 | 18 | 16mm (5/8 \") thick cement plaster (1:6) in finishing smooth to inside rough surface of 10\" thick brick walls after racking out the joints including watering and curring, with cost, conveyance, royalty and cost of all labour and T & P required for the work etc. complete. | |||
| 33 | 18.01 | 1st Floor | 323.59 | Sqm | |
| 34 | 19 | 12mm (1/2 \") thick cement plaster (1:6) in finished smooth to outside surface of brick walls after racking out joints including watering and curring etc. complete with cost, conveyance, royalty and taxes of all materials with T & P and labour required for the work complete. | |||
| 35 | 19.01 | 1st Floor | 255.88 | Sqm | |
| 36 | 20 | Providing fitting fixing of false ceiling with Aluminium anodised T section No.3215 with 2'-0\" center to center, L section No.1705 on 4 walls to be fixed by means of steel screw and P.V.C. plug and the Aluminium grid 2'0\"x2'0\" with water proof Gypsum board suspended from ceiling including cost of all materials, labour T&P etc required for the work all complete as per direction of the Engineer-in-charge | 116.87 | Sqm | |
| 37 | 21 | (A) Providing fitting and fixing of AI door with anodized AI. door section of 9202 as vertical member, 9201 as top, 9200 as bottom and middle member with frame section as 9221 with tapered clip No.4660 and the frame to be completed by means of jointing angle No.1855 including all cost of labour T&P hire charges of drilling machine labour charges etc. complete excluding cost of laminated board. | |||
| 38 | 21.01 | 1st Floor | 68.21 | Kg. | |
| 39 | 21.02 | (B) Cost of 12mm prelaminated board including wastages (NB:-Measurement will be taken for finished area only. No measurement towards wastages will be considered). | 5.2 | Sqm | |
| 40 | 22 | (A) Providing fitting and fixing up window (sliding type) made of alluminium section of 9778 as windows frame, section 4095, 4096, 9777, 3994, as shutter frame with 5 mm thick black glass as pannel fitted with rubber beading including locking arrangement including all fitting including cost of materials all taxes labour, T & P excluding cost of glass etc. complete as per direction of engineer in charge. | |||
| 41 | 22.01 | 1st Floor | 46.41 | Kg. | |
| 42 | 22.02 | (B) Cost of 5mm thick black glass including wastages (NB:-Measurement will be taken for finished area only. No measurement towards wastages will be considered). | 9.48 | Sqm | |
| 43 | 23 | Supplying, fitting & fixing of 6mm thick Black glass of Stair case, Ventilator with Gum putty in proper position including wastages (NB:-Measurement will be taken for finished area only. No measurement towards wastages will be considered). | |||
| 44 | 23.01 | 1st Floor | 6.13 | Sqm | |
| 45 | 24 | Finishing wall surface of wall with Acrylic Wall Putty (water based) of approved make and finished smooth and even surface to receive painting including cost of scoffolding staging charges with cost of all materials, taxes, labour, T&P etc. complete. | |||
| 46 | 24.01 | 1st Floor | 323.59 | Sqm | |
| 47 | 25 | Primering one coat with approved water bound wall cement primer on plastered surface of walls including cost, conveyance and taxes of all labour with T&P required for the work etc. complete as directed by the Engineer-in-charge. | |||
| 48 | 25.01 | 1st Floor | 579.47 | Sqm | |
| 49 | 26 | Finishing Wall with Plastic Emulsion Paint two coats of approved shade on new work by means of brush including watering and curing etc. complete including cost of paint with taxes and cost of all labour with T & P required for the work etc. complete. | |||
| 50 | 26.01 | 1st Floor | 323.59 | Sqm | |
| 51 | 27 | Wall painting two coats with weather coat of approved shade on new work by means of brush including watering and curing etc. complete including cost of paint with taxes and cost of all labour with T & P required for the work etc. complete. | |||
| 52 | 27.01 | 1st Floor | 255.88 | Sqm | |
| 53 | 28 | Removal of debries from the work site to clear the site by mechanical means lead upto 5 Km. including all cost etc. complete as per direction of Engineer-in-charge. | 84.69 | Cum |
AI Tender Summary
Tender Timeline
Sep 21, 2019
11:30 IST
Tender Published
Tender notice published.
CompletedOct 03, 2019
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedOct 04, 2019
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender