Indian Institute Of Technology-IITB has published Re-Tender For Construction Of Half Basketball Court In Front Side Of B-23 Hostel At North Campus Of Iit Mandi . . Submission Date for this Tender is 28-09-2019. Playground Construction Tenders in North campus of IIT Mandi Himachal Pradesh. Bidders can get complete Tender details and download the document.
Name of Work: “ Construction of Half Basketball Court in front side of B-23 hostel at North Campus of IIT Mandi. ” Note:- 1. Quoted rate should be inclusive of all applicable taxes including GST (nothing extra shall be payable). 2. All Statutory deduction will be made as per prevailing rates. | |||||
---|---|---|---|---|---|
Sr. No. | Description of items | Item Code / Make | Qty | Units | |
1 | 1 | Earth work in surface excavation not exceeding 30 cm in depth but\nexceeding 1.5 m in width as well as 10 sqm on plan including getting\nout and disposal of excavated earth within all lead and lift, as\ndirected by Engineer-in-Charge:All kinds of soil as per entire satisfaction and direction of Engineer -in-charge. | 272 | sqm | |
2 | 2 | Excavating holes more than 0.10 cum & upto 0.5 cum including getting out the excavated soil, then returning the soil as required in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering etc, disposing of surplus excavated soil, as directed within all lead and lift. All kinds of soil as per entire satisfaction and direction of Engineer -in-charge. | 1 | each | |
3 | 3 | Providing and laying in position cement concrete of specified grade\nexcluding the cost of centering and shuttering - All work up to plinth\nlevel :"1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) as per entire satisfaction and direction of Engineer -in-charge including carriage of material in all lead and lift.\n | 24.59 | cum | |
4 | 4 | Providing and laying in position cement concrete of specified grade\nexcluding the cost of centering and shuttering - All work up to plinth\nlevel :1:5:10 (1 cement : 5 coarse sand (zone-III): 10 graded stone\naggregate 40 mm nominal size) as per entire satisfaction and direction of Engineer -in-charge including carriage of material in all lead and lift. | 36.07 | cum | |
5 | 5 | Centering and shuttering including strutting, propping etc. and removal\nof form work for :Foundations, footings, bases for columns as per entire satisfaction and direction of Engineer -in-charge including carriage of material in all lead and lift. | 15.5 | sqm |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail