Preparation Of Fire Mitigation Plan And Handholding Support For Its Effective Implementation Preparation Of Fire Mitigation Plan AndHandholding Support For Its EffectiveImplementation
Tender Overview
Project Description
Preparation Of Fire Mitigation Plan And Handholding Support For Its Effective Implementation Preparation Of Fire Mitigation Plan And Handholding Support For Its Effective Implementation , Name Of Task / Description , Preparation Of Fire Mitigation Plan , Technical Expert ( Urban Services ) , Technical Expert ( Environment & Social ) , Carrying Out Electronic Survey ( Total Station Survey ) With Geo-Referencing , Carrying Out The Survey Of The Transit Corridor / Project Area Using Mid Height Capability Mapping Drone Of Indian Licensed Manufacturer 5 Having Various Interoperable Medium Altitude Long Endurance ( Male ) Drone With Atleast 24 Megapixel Camera And Variety Of Payload And Sensors , The Detailed Topographic Survey Of The Transit Corridor / Project Area Shall Be Done Using Digital Aero Triangulation And Gps And Will Be Produced In Both Electronic Format ( In X , Y , Z Coordinate System ) , 3D Models And Hard Copies . The Digital Output Needs To Be A High-Resolution 3D Model Of The Existing Conditions Withanavigablefully Photo-Textured , Geographically Located 3D Model With Precise Geometric . A Licensed Version Of The Software For Future Processing Needs To Be Delivered Along With The 3D Model . Plans , Longitudinal Sections And Cross Sections Shall Be Prepared To The Scale . , The Agency Needs To Use Still Oblique Photography Of The Project Area To Create 3D Vector Model , The Agency Needs To Create A Scaled 3D Rendered Model In 3D Max Software Having Resolution Upto 4K Of The Transit Corridor And Drawings Supplied By Client , The Said 3D Model Of The Proposed Structures Needs To Be Incorporated On Actual Model So Created Of The Transit Corridor / Project Area , The Animation Film In Augmented Reality Software Using The Rendered Models And Actual Videos With Well Researched And Drafted Script In Marathi , Hindi And English Languages , Prepare Final Documentary Film Of Actual Work Been Done And The Challenges Faced Using Stock Photos And Videos ) , Safety Assessment And Audit Of Assets As Guidelines Of Government Issued Time To Time , Safety Assessment And Audit Of Assets As Guidelines Of Government Issued Time To Time ( Linear Structures E . G . Road )
BOQ
| Name of Work: PREPARATION OF FIRE MITIGATION PLAN AND HANDHOLDING SUPPORT FOR ITS EFFECTIVE IMPLEMENTATION | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Name of Task / Description | |||
| 2 | 1.01 | Preparation of Fire Mitigation Plan | item1 | 1 | LS |
| 3 | 1.02 | Technical Expert (Urban Services) | item2 | 12 | Month |
| 4 | 1.03 | Technical Expert (Environment & Social) | item3 | 12 | Month |
| 5 | 1.04 | Carrying out electronic survey (Total Station Survey) with Geo-referencing | item4 | 50 | Per km |
| 6 | 1.05 | Carrying out the survey of the transit corridor /\nproject area using mid height capability\nmapping drone of Indian licensed manufacturer\n5 having various interoperable medium altitude \nlong endurance (MALE) drone with atleast 24\nmegapixel camera and variety of payload and\nsensors | item5 | 50 | Per km |
| 7 | 1.06 | The detailed topographic survey of the transit corridor / project area shall be done using digital aero triangulation and GPS and will be produced in both electronic format (in X, Y, Z Coordinate system), 3D Models and hard\ncopies. The digital output needs to be a high-resolution 3D model of the existing conditions withanavigablefully photo-textured,geographically located 3D model with precise geometric. A licensed version of the software for future processing needs to be delivered along with the 3D model. Plans, longitudinal sections\nand cross sections shall be prepared to the scale.\n | item6 | 50 | Per km |
| 8 | 1.07 | The agency needs to use still\noblique photography of the project area to create 3D\nvector model | item7 | 50 | Per km |
| 9 | 1.08 | The agency needs to create a scaled 3D rendered model in 3D max software having\nresolution upto 4K of the transit corridor and drawings supplied by Client | item8 | 50 | per km |
| 10 | 1.09 | The said 3D model of the proposed structures needs to be incorporated on actual model so \ncreated of the transit corridor / project area | item9 | 50 | Per km |
| 11 | 1.1 | The animation film in Augmented Reality\nsoftware using the rendered models and actual\nvideos with well researched and drafted script in\nMarathi, Hindi and English languages | item10 | 20 | Per\nminute of\nrendering\n/\nshooting |
| 12 | 1.11 | Prepare final documentary film of actual work\nBeen done and the challenges faced using\nstock photos and videos) | item11 | 10 | Per\nminute of\nrendering\n/\nshooting |
| 13 | 1.12 | Safety Assessment and Audit of Assets as Guidelines of government issued time to time | item12 | 1 | sq.m |
| 14 | 1.13 | Safety Assessment and Audit of Assets as\nGuidelines of government issued time to time\n(linear Structures e.g. Road) | item13 | 1 | running km |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender