E_Tender For Annual Rate Contract For Instrument Erection Jobs For Gtg_1 Break Down / Overhaul At Steam Generation Plant At Rcf Thal , Annual Rate Contract For Instrument Erection Jobs For Gtg Break Down / Overhaul At Steam Generation Plant At Rcf Thal . , 2 , 3 , 4 , 7 Core Cable Laying , 12 , 19 , 24 Core Cable Laying , 2 , 3 , 4 , 7 Core Cable Removal , 12 , 19 , 24 Core Cable Removal , 2 , 3 , 4 , 7 Core Cable Gland Fixing , 10 , 12 , 19 , 24 Core Cable Gland Fixing , Termination Of 12P Cable With Ferruling , Crimping & Dressing , Termination Of 6P Cable With Ferruling , Crimping & Dressing , Termination Of 1P Cable With Ferruling , Crimping & Dressing , 6Mm / 1 / 4 , 8Mm , 10Mm , Ss Tube Laying , 12Mm / 1 / 2Ss Tube , 12Mm / 1 / 2 Pipe Laying , 6Mm / 1 / 4 , 8Mm , 10Mm , Ss Tube , Removal , 12Mm / 1 / 2Ss Tube , 12Mm / 1 / 2 Pipe Removal , Installation Of Pg / Rtd / T / C / Regulator , I / P Convertor , Remote Seal Transmitter , Transmitter , Panel Instrument , Pressure Switch , Level Switch , Solenoid Valve , Instrument Canopy , Stand Pipe , Air Header , 1 / 4 , 1 / 2 Valves , Removal Of Pg / Rtd / T / C / Regulator , I / P Convertor , Remote Seal Transmitter , Transmitter , Panel Instrument , Pressure Switch , Level Switch , Solenoid Valve . , Installation Of Speed Probe / Vibration Probe / Axial Probe / Key Phasor / Bearing Sensor / Wndg Sensor , Removal Of Speed Probe / Vibration Probe / Axial Probe / Key Phasor / Bearing Sensor / Wndg Sensor , Erection Of Control Valve ( 1 To 3 300 / 600# ) , Removal Of Control Valve ( 1 To 3 300 / 600# ) , Erection Of Control Valve ( 4 To 6 300 / 600# ) , Removal Of Control Valve ( 4 To 6 300 / 600# ) , Erection Of Control Valve ( 8 To 10 300 / 600# ) , Removal Of Control Valve ( 8 To 10 300 / 600# ) , Testing & Calibration Of Control Valve , Testing & Calibration Of Level / Flow Transmitters , Loop Checking & Commissioning Of Level / Flow Transmitters , Erection / Removal Of Level Gauges , Erection & Installation Of Junction Box For Signal Cable 12 In , 1 Out With Cable Glands & Metal Frame For Mounting The Jb . , Erection Of Frp Canopy For Junction Boxes , Removal Of Junction Box 12 In 1 Out With Mounting Frame , Erection Of Perforated Anodized Aluminium Cable Tray As Per Is 737 Size 300Mm ( W ) X 3Mm Thk X 75Mm Height X 2500Mm Long With Tray Coupler Plate Sets With Ss Nut , Bolts & Washers For Clamping . , Erection Of Perforated Anodized Aluminium Cable Tray As Per Is 737 Size 100Mm ( W ) X 2Mm Thk X 30Mm Height X 2500Mm Long With Tray Coupler Plate Sets With Ss Nut , Bolts & Washers For Clamping . , Skilled Labour For Instrument Erection , Un-Skilled Labour For Instrument Erection