Central Water Commission-CWC has published Tender For Excavation Of Drift ) On The Left Abutment Of Dam Portion Of Tlawng Hydro-Electric Project Geo-Technical Investigation ( Excavation Of Drift ) On The Left Abutment Of Dam Portion Of Tlawng Hydro-Electric Project Near Lungleng Village , Dist. Submission Date for this Tender is 30-09-2019. Hydro Power Plants Tenders in Lungleng village, Distt. Aizawl , Mizoram Mizoram. Bidders can get complete Tender details and download the document.
Name of Work: Geo-Technical Investigation (Excavation of Drift) on the Left Abutment of Dam Portion of Tlawng Hydro-Electric Project near Lungleng village, Distt. Aizawl under North Eastern Investigation Division-II, CWC, Aizawl (Mizoram) | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Construction of INLET portal at the entrance of DRIFT. | BI01010001010000000000000515BI0100001112 | ||
2 | 1.01 | Steel Reinforcement for RCC work including straightning, cutting, bending in position and binding all complete. | BI01010001010000000000000515BI0100001113 | 627.65 | Kg |
3 | 1.02 | Providing and laying in position specified grade of reinforced cement concrete excluding cost of formwork, finishing and reinforcement. | BI01010001010000000000000515BI0100001114 | 7.255 | cum |
4 | 2 | Clearing jungle including uprooting of rank vegetation, grass, bush, wood, trees and sapling of girth upto a distance of 50m outside the periphery of the area cleared. | BI01010001010000000000000515BI0100001118 | 625 | sqm |
5 | 3 | Making approach path and cutting of steps in hilly terrain including cost of labour and T&P complete. For 1.5 m wide path | BI01010001010000000000000515BI0100001119 | 250 | m |
6 | 4 | Erection of wooden supports in drifts including cost of materials, fitting and fixing in position complete with cost of all labour, T&p and transport as per directions of Engineer-in-charge | BI01010001010000000000000515BI0100001120 | 110 | m |
7 | 5 | Carriages by mechanical transport including loading and unloading and stacking etc. (Excavated rock) | BI01010001010000000000000515BI0100001121 | 502.7 | cum |
8 | 6 | Excavation in hard rock (blasting) with disposal upto 1000meters. | BI01010001010000000000000515BI0100001122 | 502.7 | cum |
9 | 7 | Excavation of drift in different formation with cost of all labours, T&P and POL, excluding cost of explosive material, wooden/steel supports complete and as per directions of engineer-in-charge: (Assuming 2mX2.5m size DRIFT tunnel in hard rock formation. | BI01010001010000000000000515BI0100001124 | ||
10 | 7.01 | Up to 30m length | BI01010001010000000000000515BI0100001125 | 411.3 | cum |
11 | 7.02 | From 30m to 100m | BI01010001010000000000000515BI0100001126 | 91.4 | cum |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail