Tender For Tiruvannamalai Strengthening / Improvements , Construction Of Culvert Works Including Upkeeping In Polur ( H ) C And M Sub Division Jurisdiction
Tender Overview
Project Description
Strengthening / Improvements, Construction Of Culvert Works Including Upkeeping In Polur ( H ) C&M Sub Division Jurisdictiona ) Strengthening To Vadamathimangalam Kommanandal Road Km 6 / 0 - 9 / 0 Including Upkeeping For A Period Of 60 Months ( 01-Cridp-19-20-M-1014 ) B ) Strengthening To Vadamathimangalam Kommanandal Road Km 9 / 0 - 13 / 0 Including Construction Of Culvert At 12 / 10. Including Upkeeping For A Period Of 60 Months ( 01-Cridp-19-20-M-1015 ) C ) Strengthening To Vadamathimangalam Kommanandal Road Km13 / 0-17 / 0. Including Upkeeping For A Period Of 60 Months ( 01-Cridp-19-20-M-1016 ) D ) Improvements To Vadamathimangalam Guddalore Road Km 4 / 0 - 5 / 0 Including Upkeeping For A Period Of 60 Months ( 01-Cridp-19-20-O-2059 ) E ) |Improvements To Riding Surface At Km 5 / 0 - 6 / 0 Of Vadamathimangalam Kommanandal Road Including Upkeeping For A Period Of 60 Months ( 01-Cridp-19-20-I-3950 ) F ) Improvements To Riding Surface At Km 1 / 4 - 4 / 0 In Vadamathimangalam Guddalore Road Including Upkeeping For A Period Of 60 Months ( 01-Cridp-19-20-I-3972 ) G ) Improvements To Riding Surface At Km 0 / 0 - 1 / 4 In Kilpattu Road Including Upkeeping For A Period Of 60 Months ( 01-Cridp-19-20-I-3973 ) H ) Reconstruction Of Culvert At Km 3 / 4 Of Vadamathimangalam Guddalore Road ( 01-Cridp-19-20-O-2066 )
BOQ
| Name of work : Package 100 Strengthening / Improvements, Construction of Culvert works including upkeeping in Polur (H) C&M Sub Division JurisdictionA)Strengthening to Vadamathimangalam Kommanandal road Km 6/0 - 9/0 including Upkeeping for a period of 60 months (01-CRIDP-19-20-M-1014)B) Strengthening to Vadamathimangalam Kommanandal road Km 9/0 - 13/0 including Construction of Culvert at 12/10. including Upkeeping for a period of 60 months (01-CRIDP-19-20-M-1015)C) Strengthening to Vadamathimangalam Kommanandal road Km13/0-17/0. including Upkeeping for a period of 60 months (01-CRIDP-19-20-M-1016)D) Improvements to Vadamathimangalam Guddalore road KM 4/0 - 5/0 including Upkeeping for a period of 60 months (01-CRIDP-19-20-O-2059)E) |Improvements to Riding surface at Km 5/0 - 6/0 of Vadamathimangalam Kommanandal road including Upkeeping for a period of 60 months (01-CRIDP-19-20-I-3950)F) Improvements to Riding surface at KM 1/4 - 4/0 in Vadamathimangalam Guddalore road including Upkeeping for a period of 60 months (01-CRIDP-19-20-I-3972)G) Improvements to Riding surface at Km 0/0 - 1/4 in Kilpattu road including Upkeeping for a period of 60 months(01-CRIDP-19-20-I-3973)H) Reconstruction of Culvert at Km 3/4 of Vadamathimangalam Guddalore road (01-CRIDP-19-20-O-2066) | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Wet Mix Macadam (Table 400-13) (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at Optimum Moisture Content in accordance with IS 2720 (part 8) in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, Complete as per clause 406) | BI01010001010000000000000515BI0100001112 | ||
| 2 | 1.1 | Road D | BI01010001010000000000000515BI0100001113 | 375 | Cubic Metre |
| 3 | 1.2 | Road E | 120 | Cubic Metre | |
| 4 | 1.3 | Road F | 121.6 | Cubic Metre | |
| 5 | 1.4 | Road G | 121.25 | Cubic Metre | |
| 6 | 2 | Prime coat Providing and applying primer coat with bitumen emulsion (SS-I type) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per clause 502) - over WMM/ WBM | |||
| 7 | 2.1 | Road D | 3750 | Square Metre | |
| 8 | 2.2 | Road E | 800 | Square Metre | |
| 9 | 2.3 | Road F | 1216 | Square Metre | |
| 10 | 2.4 | Road G | 966.25 | Square Metre | |
| 11 | 3 | Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the granular surface treated with primer as per clause 503 - over granular surfaces treated with primer | |||
| 12 | 3.1 | Road D | 3750 | Square Metre | |
| 13 | 3.2 | Road E | 800 | Square Metre | |
| 14 | 3.3 | Road F | 1216 | Square Metre | |
| 15 | 3.4 | Road G | 966.25 | Square Metre | |
| 16 | 4 | Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the bituminous surface cleaned with mechanical broom and high pressure air jet,or other means as directed by the Engineer.As per clause 503 - over bituminous surfaces | |||
| 17 | 4.1 | Road A | 16500 | Square Metre | |
| 18 | 4.2 | Road B | 22000 | Square Metre | |
| 19 | 4.3 | Road C | 22000 | Square Metre | |
| 20 | 4.4 | Road E | 4413 | Square Metre | |
| 21 | 4.5 | Road F | 8534 | Square Metre | |
| 22 | 4.6 | Road G | 4315 | Square Metre | |
| 23 | 5 | Providing and Laying 50mm thick Bituminous Macadam using course aggregate and VG30 bitumen which shall consist of construction in a single course base/binder course confirming to the specficationon a previously prepared base.(using Mini Hot Mix Plant and Power Roller) including cost of material, labourcharges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 504 MORTHRev-5 (Mix-in-placemethod) (For Patch Works) | |||
| 24 | 5.1 | Road E | 51.75 | Cubic Metre | |
| 25 | 5.2 | Road F | 95.43 | Cubic Metre | |
| 26 | 5.3 | Road G | 52.08 | Cubic Metre | |
| 27 | 6 | Bituminous Macadam (Table - 500-10) - (Providing and laying Bituminous Macadam with Hot Mix Plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade 30) at percentage specified by JMF by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic Paver Finisher to the required grade, level and alignment, rolling with smooth wheeled vibratory and tandem rollers to achieve the desired compaction as per Clause 505 MORT&H Rev-V) - Grading II. | |||
| 28 | 6.1 | Road A | 825 | Cubic Metre | |
| 29 | 6.2 | Road B | 1100 | Cubic Metre | |
| 30 | 6.3 | Road C | 1100 | Cubic Metre | |
| 31 | 6.4 | Road D | 187.5 | Cubic Metre | |
| 32 | 7 | Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade - 30) at percentage specified by JMF of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects) - Grading II | |||
| 33 | 7.1 | Road A | 495 | Cubic Metre | |
| 34 | 7.2 | Road B | 660 | Cubic Metre | |
| 35 | 7.3 | Road C | 660 | Cubic Metre | |
| 36 | 7.4 | Road D | 112.5 | Cubic Metre | |
| 37 | 7.5 | Road E | 156.39 | Cubic Metre | |
| 38 | 7.6 | Road F | 292.5 | Cubic Metre | |
| 39 | 7.7 | Road G | 158.44 | Cubic Metre | |
| 40 | 8 | Providing and laying of Carted Earth including cost and conveyance of the same to work site including stacking the same to departmental gauge for premeasurement including all labour charges for laying, spreading etc., complete and as directed by the departmental Engineers. | |||
| 41 | 8.1 | Road A | 900 | Cubic Metre | |
| 42 | 8.2 | Road B | 1200 | Cubic Metre | |
| 43 | 8.3 | Road C | 1200 | Cubic Metre | |
| 44 | 8.4 | Road D | 200 | Cubic Metre | |
| 45 | 8.5 | Road E | 300 | Cubic Metre | |
| 46 | 8.6 | Road F | 520 | Cubic Metre | |
| 47 | 8.7 | Road G | 280 | Cubic Metre | |
| 48 | 9 | Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete for Retaining Wall as per standard specification MoRTH Rev.V No. 301, 304 | |||
| 49 | 9.1 | Road A | 3000 | Cubic Metre | |
| 50 | 9.2 | Road B | 4000 | Cubic Metre | |
| 51 | 9.3 | Road C | 4000 | Cubic Metre | |
| 52 | 9.4 | Road D | 20 | Cubic Metre | |
| 53 | 9.7 | Road E | 750 | Cubic Metre | |
| 54 | 9.8 | Road F | 1650 | Cubic Metre | |
| 55 | 9.9 | Road G | 235 | Cubic Metre | |
| 56 | 10 | Vibrated Cement concrete M15, 1:2:4 mix using 20mm ISS HBG graded metal including cost and conveyance of all materials to site, complying to the required standard and specifications including labour charges for formwork, laying, watering, compacting, vibration charges, curing and all other incidental charges etc., complete as per relevant standard specification for repairing the parapet and culvert portion. | |||
| 57 | 10.1 | Road A | 6.57 | Cubic Metre | |
| 58 | 10.2 | Road B | 2.59 | Cubic Metre | |
| 59 | 10.3 | Road C | 7.06 | Cubic Metre | |
| 60 | 10.4 | Road D | 0.68 | Cubic Metre | |
| 61 | 10.5 | Road E | 1.35 | Cubic Metre | |
| 62 | 10.6 | Road G | 2.03 | Cubic Metre | |
| 63 | 11 | Providing RCC M15 grade precast KM Stone of standard design as per IRC: 8 - 1980 and fixing in position including all incidental charges, etc., complete as per MORT&H specification No. 804 and as directed by the Engineer. (Replacing the damaged / non-standard / missing KM stones) | |||
| 64 | 11.1 | Road A | 3 | Nos. | |
| 65 | 11.2 | Road B | 3 | Nos. | |
| 66 | 11.3 | Road C | 3 | Nos. | |
| 67 | 11.4 | Road D | 1 | Nos. | |
| 68 | 11.5 | Road E | 1 | Nos. | |
| 69 | 11.6 | Road F | 2 | Nos. | |
| 70 | 11.7 | Road G | 1 | Nos. | |
| 71 | 12 | Providing RCC M15 grade precast 5th KM Stone of standard design as per IRC: 8 - 1980 and fixing in position including all incidental charges, etc., complete as per MORT&H specification No. 804 and as directed by the Engineer. (Replacing the damaged / non-standard / missing KM stones) | |||
| 72 | 12.1 | Road B | 1 | Nos. | |
| 73 | 12.2 | Road C | 1 | Nos. | |
| 74 | 12.3 | Road D | 1 | Nos. | |
| 75 | 13 | Providing RCC M15 grade precast HM Stone of standard design as per IRC: 26 - 1976 and fixing in position including all incidental charges, etc., complete as per MORT&H specification No. 804 and as directed by the Engineer (Replacing the damaged / non-standard / missing HM stones) | |||
| 76 | 13.1 | Road A | 12 | Nos. | |
| 77 | 13.2 | Road B | 16 | Nos. | |
| 78 | 13.3 | Road C | 16 | Nos. | |
| 79 | 13.4 | Road D | 4 | Nos. | |
| 80 | 13.5 | Road E | 4 | Nos. | |
| 81 | 13.6 | Road F | 10 | Nos. | |
| 82 | 13.7 | Road G | 6 | Nos. | |
| 83 | 14 | Supply and fixing of RCC Guide post of size 0.20 x 0.20 x 1.20m using vibrated RCC 1:2:4 mix using 20mm ISS HBG metal and fixing 0.50m below GL and side packing CC 1:3:6 using 40mm HBG metal including cost and conveyance of all materials to site, including moulding and fixing charges and all other incidental charges, etc., complete. | |||
| 84 | 14.1 | Road A | 225 | Nos. | |
| 85 | 14.2 | Road B | 99 | Nos. | |
| 86 | 14.3 | Road C | 140 | Nos. | |
| 87 | 14.4 | Road D | 5 | Nos. | |
| 88 | 14.5 | Road E | 20 | Nos. | |
| 89 | 14.6 | Road F | 65 | Nos. | |
| 90 | 14.7 | Road G | 10 | Nos. | |
| 91 | 15 | Clearing the Light Jungles including weeding out shrubs, bushes, vegetables, growth etc., as per standard specifications and directions of Engineer incharge | |||
| 92 | 15.1 | Road A | 5400 | Square Metre | |
| 93 | 15.2 | Road B | 7200 | Square Metre | |
| 94 | 15.3 | Road C | 5814 | Square Metre | |
| 95 | 15.4 | Road D | 180 | Square Metre | |
| 96 | 15.5 | Road E | 1440 | Square Metre | |
| 97 | 15.6 | Road F | 1620 | Square Metre | |
| 98 | 15.7 | Road G | 480 | Square Metre | |
| 99 | 16 | Provision for Hire charges including pay and allowances of Crews for JCB for clearing the ventway of culverts and clearing on either sides, etc., complete as directed by departmental officers. | |||
| 100 | 16.1 | Road A | 16 | Hrs | |
| 101 | 16.2 | Road B | 34 | Hrs | |
| 102 | 16.3 | Road C | 20 | Hrs | |
| 103 | 16.4 | Road D | 2 | Hrs | |
| 104 | 16.5 | Road E | 4 | Hrs | |
| 105 | 16.6 | Road F | 22 | Hrs | |
| 106 | 16.7 | Road G | 14 | Hrs | |
| 107 | 17 | Painting with synthetic Enamel paint over the existing KM, HM Stones, boundary stones, Guide stones, Parapets of Culverts, Tree number back ground, etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers. | |||
| 108 | 17.1 | Road A | 194.8 | Square Metre | |
| 109 | 17.2 | Road B | 129.21 | Square Metre | |
| 110 | 17.3 | Road C | 130.65 | Square Metre | |
| 111 | 17.4 | Road D | 18.31 | Square Metre | |
| 112 | 17.5 | Road E | 37.09 | Square Metre | |
| 113 | 17.6 | Road F | 72.85 | Square Metre | |
| 114 | 17.7 | Road G | 23.6 | Square Metre | |
| 115 | 18 | Painting with synthetic Enamel paint over the existing iron surfaces, etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers. | |||
| 116 | 18.1 | Road A | 13.46 | Square Metre | |
| 117 | 18.2 | Road B | 13.46 | Square Metre | |
| 118 | 18.3 | Road C | 29 | Square Metre | |
| 119 | 18.4 | Road D | 18.09 | Square Metre | |
| 120 | 18.5 | Road E | 31.55 | Square Metre | |
| 121 | 18.6 | Road F | 26.91 | Square Metre | |
| 122 | 18.7 | Road G | 31.55 | Square Metre | |
| 123 | 19 | Whitewashing with white cem over the Culvert parapets, etc., including cost of white cem and labour charges, etc., including all other incidental charges as directed by departmental officers. | |||
| 124 | 19.1 | Road A | 58.53 | Square Metre | |
| 125 | 19.2 | Road B | 109 | Square Metre | |
| 126 | 19.3 | Road C | 62.36 | Square Metre | |
| 127 | 19.4 | Road D | 5.25 | Square Metre | |
| 128 | 19.5 | Road E | 19.2 | Square Metre | |
| 129 | 19.6 | Road F | 65.55 | Square Metre | |
| 130 | 19.7 | Road G | 67.2 | Square Metre | |
| 131 | 20 | Providing Alternate banding of White banding with White cem & Black banding with Japan Black over the Centre Medians, Avenues, EB Poles etc., including cost of all materials, all labour charges and all other incidental charges etc complete as directed by the departmental officers. (White Banding) | |||
| 132 | 20.1 | Road A | 53.9 | Square Metre | |
| 133 | 20.2 | Road B | 76.48 | Square Metre | |
| 134 | 20.3 | Road C | 94.15 | Square Metre | |
| 135 | 20.4 | Road D | 10.8 | Square Metre | |
| 136 | 20.5 | Road E | 9.4 | Square Metre | |
| 137 | 20.6 | Road F | 79.67 | Square Metre | |
| 138 | 20.7 | Road G | 25.15 | Square Metre | |
| 139 | 21 | Providing Alternate banding of White banding with White cem & Black banding with Japan Black over the Centre Medians, Avenues, EB Poles etc., including cost of all materials, all labour charges and all other incidental charges etc complete as directed by the departmental officers. (Black Banding) | |||
| 140 | 21.1 | Road A | 26.95 | Square Metre | |
| 141 | 21.2 | Road B | 38.25 | Square Metre | |
| 142 | 21.3 | Road C | 47.08 | Square Metre | |
| 143 | 21.4 | Road D | 5.4 | Square Metre | |
| 144 | 21.5 | Road E | 4.7 | Square Metre | |
| 145 | 21.6 | Road F | 39.84 | Square Metre | |
| 146 | 21.7 | Road G | 12.58 | Square Metre | |
| 147 | 22 | Letterings in KM & HM Stones, Culvert parapets / Bridges and tree numbers including cost of Paint and labour charges and all other incidental charges, etc., complete as directed by departmental Engineer. (Lettering 5 to 10 cm) | |||
| 148 | 22.1 | Road A | 810 | Nos. | |
| 149 | 22.2 | Road B | 876 | Nos. | |
| 150 | 22.3 | Road C | 1154 | Nos. | |
| 151 | 22.4 | Road D | 222 | Nos. | |
| 152 | 22.5 | Road E | 234 | Nos. | |
| 153 | 22.6 | Road F | 293 | Nos. | |
| 154 | 22.7 | Road G | 415 | Nos. | |
| 155 | 23 | Letterings in KM & HM Stones, Culvert parapets / Bridges and tree numbers including cost of Paint and labour charges and all other incidental charges, etc., complete as directed by departmental Engineer. (Lettering 10 to 15 cm) | |||
| 156 | 23.1 | Road A | 25 | Nos. | |
| 157 | 23.2 | Road B | 25 | Nos. | |
| 158 | 23.3 | Road C | 25 | Nos. | |
| 159 | 23.4 | Road D | 15 | Nos. | |
| 160 | 23.5 | Road E | 5 | Nos. | |
| 161 | 23.6 | Road F | 10 | Nos. | |
| 162 | 23.7 | Road G | 5 | Nos. | |
| 163 | 24 | Dismantling and removing, clearing away and carefully stacking materials useful for re-use for any thickness of wall. Brick / Stone masonry in lime mortar walls under 3m high including all labour and other incidental charges as directed by the departmental officers etc., complete | |||
| 164 | 24.1 | Road - B - Reconstruction of Pipe Culvert (Sub-Estimate) | 6.75 | Cubic Metre | |
| 165 | 24.2 | Road - H - Reconstruction of Pipe Culvert (Sub-Estimate) | 6.75 | Cubic Metre | |
| 166 | 25 | Dismantling and removing, clearing away the existing cut stone and carefully stacking materials useful for re-use for any thickness of walls including all labour and other incidental charges as directed by the departmental officers etc., complete | |||
| 167 | 25.1 | Road - B - Reconstruction of Pipe Culvert (Sub-Estimate) | 9.75 | Cubic Metre | |
| 168 | 25.2 | Road - H - Reconstruction of Pipe Culvert (Sub-Estimate) | 9.75 | Cubic Metre | |
| 169 | 26 | Earthwork excavation in all classes of soil except soft rock not requiring blasting and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidential charges such as bailing out water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for Foundation of Retaining Wall & Pipe Culvert | |||
| 170 | 26.1 | Road - B - Reconstruction of Pipe Culvert (Sub-Estimate) | 33.4 | Cubic Metre | |
| 171 | 26.2 | Road - H - Reconstruction of Pipe Culvert (Sub-Estimate) | 29.01 | Cubic Metre | |
| 172 | 27 | Vibrated cement concrete of grade M15 Nominal Mix 1:2:4 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of formwork, soft water,labour charges for mixing, transporting, laying and curing concrete, working at depths,Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per MORTH Rev.V (Below Sill level) | |||
| 173 | 27.1 | Road - B - Reconstruction of Pipe Culvert (Sub-Estimate) | 14.1 | Cubic Metre | |
| 174 | 27.2 | Road - H - Reconstruction of Pipe Culvert (Sub-Estimate) | 10.58 | Cubic Metre | |
| 175 | 28 | Vibrated cement concrete of grade M15 Nominal Mix 1:2:4 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of formwork, soft water,labour charges for mixing, transporting, laying and curing concrete, working at depths,Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per MORTH Rev.V (Above Sill level) | |||
| 176 | 28.1 | Road - B - Reconstruction of Pipe Culvert (Sub-Estimate) | 12.21 | Cubic Metre | |
| 177 | 28.2 | Road - H - Reconstruction of Pipe Culvert (Sub-Estimate) | 8.93 | Cubic Metre | |
| 178 | 29 | Supply and fixing of RCC pipes 1000 mm dia NP4 class IV including cost and conveyance to work site to proper gradient including all labour charges and all other incidental charges etc., complete as per MORTH Rev.V | |||
| 179 | 29.1 | Road - B - Reconstruction of Pipe Culvert (Sub-Estimate) | 7.5 | Running Metre | |
| 180 | 29.2 | Road - H - Reconstruction of Pipe Culvert (Sub-Estimate) | 7.5 | Running Metre | |
| 181 | 30 | Laying Reinforced cement concrete pipe 1000mm dia NP3 / Prestressed concrete pipe for culverts of first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets. | |||
| 182 | 30.1 | Road - B - Reconstruction of Pipe Culvert (Sub-Estimate) | 7.5 | Running Metre | |
| 183 | 30.2 | Road - H - Reconstruction of Pipe Culvert (Sub-Estimate) | 7.5 | Running Metre | |
| 184 | 31 | Filling with US Gravel including cost and conveyance of gravel to worksite laying handling charges and filling in layers tamering to optimum mositure content to get the maximum density including watering with a lead and all other incidental charges etc. complete. | |||
| 185 | 31.1 | Road - B - Reconstruction of Pipe Culvert (Sub-Estimate) | 11.21 | Cubic Metre | |
| 186 | 31.2 | Road - H - Reconstruction of Pipe Culvert (Sub-Estimate) | 11.21 | Cubic Metre | |
| 187 | 32 | Upkeeping of Roads for 1st Year \nProviding and laying of Carted Earth including cost and conveyance of the same to work site including stacking the same to departmental gauge for premeasurement including all labour charges for laying, spreading etc., complete and as directed by the departmental Engineers. | |||
| 188 | 32.1 | Road A | 270 | Cubic Metre | |
| 189 | 32.2 | Road B | 360 | Cubic Metre | |
| 190 | 32.3 | Road C | 360 | Cubic Metre | |
| 191 | 32.4 | Road D | 60 | Cubic Metre | |
| 192 | 32.5 | Road E | 90 | Cubic Metre | |
| 193 | 32.6 | Road F | 156 | Cubic Metre | |
| 194 | 32.7 | Road G | 84 | Cubic Metre | |
| 195 | 33 | Earthwork Excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross section shown in the drawings or as directed by the Engineer for the Earthern Drain | |||
| 196 | 33.1 | Road A | 900 | Cubic Metre | |
| 197 | 33.2 | Road B | 1200 | Cubic Metre | |
| 198 | 33.3 | Road C | 1200 | Cubic Metre | |
| 199 | 33.4 | Road D | 6 | Cubic Metre | |
| 200 | 33.5 | Road E | 225 | Cubic Metre | |
| 201 | 33.6 | Road F | 495 | Cubic Metre | |
| 202 | 33.7 | Road G | 70.5 | Cubic Metre | |
| 203 | 34 | Clearing the Light Jungles including weeding out shrubs, bushes, vegetables, growth etc., as per standard specifications and directions of Engineer incharge | |||
| 204 | 34.1 | Road A | 10800 | Square Metre | |
| 205 | 34.2 | Road B | 14400 | Square Metre | |
| 206 | 34.3 | Road C | 11628 | Square Metre | |
| 207 | 34.4 | Road D | 360 | Square Metre | |
| 208 | 34.5 | Road E | 3600 | Square Metre | |
| 209 | 34.6 | Road F | 3240 | Square Metre | |
| 210 | 34.7 | Road G | 960 | Square Metre | |
| 211 | 35 | Provision for Hire charges including pay and allowances of Crews for JCB for clearing the ventway of culverts and clearing on either sides, etc., complete as directed by departmental officers. | |||
| 212 | 35.1 | Road A | 16 | Hrs | |
| 213 | 35.2 | Road B | 36 | Hrs | |
| 214 | 35.3 | Road C | 20 | Hrs | |
| 215 | 35.4 | Road D | 2 | Hrs | |
| 216 | 35.5 | Road E | 4 | Hrs | |
| 217 | 35.6 | Road F | 20 | Hrs | |
| 218 | 35.7 | Road G | 14 | Hrs | |
| 219 | 36 | Painting with synthetic Enamel paint over the existing KM, HM Stones, boundary stones, Guide stones, Parapets of Culverts, Tree number back ground, etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers. | |||
| 220 | 36.1 | Road A | 19.7 | Square Metre | |
| 221 | 36.2 | Road B | 29.71 | Square Metre | |
| 222 | 36.3 | Road C | 24.55 | Square Metre | |
| 223 | 36.4 | Road D | 7.06 | Square Metre | |
| 224 | 36.5 | Road E | 5.99 | Square Metre | |
| 225 | 36.6 | Road F | 11.52 | Square Metre | |
| 226 | 36.7 | Road G | 8.15 | Square Metre | |
| 227 | 37 | Painting with synthetic Enamel paint over the existing iron surfaces, etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers. | |||
| 228 | 37.1 | Road A | 13.46 | Square Metre | |
| 229 | 37.2 | Road B | 13.46 | Square Metre | |
| 230 | 37.3 | Road C | 29 | Square Metre | |
| 231 | 37.4 | Road D | 18.09 | Square Metre | |
| 232 | 37.5 | Road E | 31.55 | Square Metre | |
| 233 | 37.6 | Road F | 26.91 | Square Metre | |
| 234 | 37.7 | Road G | 31.55 | Square Metre | |
| 235 | 38 | Letterings in KM & HM Stones, Culvert parapets / Bridges and tree numbers including cost of Paint and labour charges and all other incidental charges, etc., complete as directed by departmental Engineer. Lettering 5 to 10 cm | |||
| 236 | 38.1 | Road A | 810 | Nos. | |
| 237 | 38.2 | Road B | 876 | Nos. | |
| 238 | 38.3 | Road C | 1154 | Nos. | |
| 239 | 38.4 | Road D | 222 | Nos. | |
| 240 | 38.5 | Road E | 234 | Nos. | |
| 241 | 38.6 | Road F | 293 | Nos. | |
| 242 | 38.7 | Road G | 415 | Nos. | |
| 243 | 39 | Letterings in KM & HM Stones, Culvert parapets / Bridges and tree numbers including cost of Paint and labour charges and all other incidental charges, etc., complete as directed by departmental Engineer. Lettering 10 to 15 cm | |||
| 244 | 39.1 | Road A | 25 | Nos. | |
| 245 | 39.2 | Road B | 25 | Nos. | |
| 246 | 39.3 | Road C | 25 | Nos. | |
| 247 | 39.4 | Road D | 15 | Nos. | |
| 248 | 39.5 | Road E | 5 | Nos. | |
| 249 | 39.6 | Road F | 10 | Nos. | |
| 250 | 39.7 | Road G | 5 | Nos. | |
| 251 | 40 | Whitewashing with white cem over the Culvert parapets, etc., including cost of white cem and labour charges, etc., including all other incidental charges as directed by departmental officers. | |||
| 252 | 40.1 | Road A | 58.53 | Square Metre | |
| 253 | 40.2 | Road B | 109 | Square Metre | |
| 254 | 40.3 | Road C | 62.36 | Square Metre | |
| 255 | 40.4 | Road D | 5.25 | Square Metre | |
| 256 | 40.5 | Road E | 19.2 | Square Metre | |
| 257 | 40.6 | Road F | 65.55 | Square Metre | |
| 258 | 40.7 | Road G | 67.2 | Square Metre | |
| 259 | 41 | Providing Alternate banding of White banding with White cem over the Centre Medians, Avenues, EB Poles etc., including cost of all materials, all labour charges and all other incidental charges etc complete as directed by the departmental officers. | |||
| 260 | 41.1 | Road A | 53.9 | Square Metre | |
| 261 | 41.2 | Road B | 76.48 | Square Metre | |
| 262 | 41.3 | Road C | 94.15 | Square Metre | |
| 263 | 41.4 | Road D | 10.8 | Square Metre | |
| 264 | 41.5 | Road E | 9.4 | Square Metre | |
| 265 | 41.6 | Road F | 79.67 | Square Metre | |
| 266 | 41.7 | Road G | 25.15 | Square Metre | |
| 267 | 42 | Providing Alternate banding of Black banding with Japan Black over the Centre Medians, Avenues, EB Poles etc., including cost of all materials, all labour charges and all other incidental charges etc complete as directed by the departmental officers. | |||
| 268 | 42.1 | Road A | 26.95 | Square Metre | |
| 269 | 42.2 | Road B | 38.25 | Square Metre | |
| 270 | 42.3 | Road C | 47.08 | Square Metre | |
| 271 | 42.4 | Road D | 5.4 | Square Metre | |
| 272 | 42.5 | Road E | 4.7 | Square Metre | |
| 273 | 42.6 | Road F | 39.84 | Square Metre | |
| 274 | 42.7 | Road G | 12.58 | Square Metre | |
| 275 | 43 | Painting with synthetic Enamel paint over the existing Guide stones, Boundary stones, etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers. | |||
| 276 | 43.1 | Road A | 175.1 | Square Metre | |
| 277 | 43.2 | Road B | 99.5 | Square Metre | |
| 278 | 43.3 | Road C | 106.1 | Square Metre | |
| 279 | 43.4 | Road D | 11.25 | Square Metre | |
| 280 | 43.5 | Road E | 31.1 | Square Metre | |
| 281 | 43.6 | Road F | 61.33 | Square Metre | |
| 282 | 43.7 | Road G | 15.45 | Square Metre | |
| 283 | 44 | Upkeeping of Roads for 2nd Year \nProviding and laying of Carted Earth including cost and conveyance of the same to work site including stacking the same to departmental gauge for premeasurement including all labour charges for laying, spreading etc., complete and as directed by the departmental Engineers. | |||
| 284 | 44.1 | Road A | 270 | Cubic Metre | |
| 285 | 44.2 | Road B | 360 | Cubic Metre | |
| 286 | 44.3 | Road C | 360 | Cubic Metre | |
| 287 | 44.4 | Road D | 60 | Cubic Metre | |
| 288 | 44.5 | Road E | 90 | Cubic Metre | |
| 289 | 44.6 | Road F | 156 | Cubic Metre | |
| 290 | 44.7 | Road G | 84 | Cubic Metre | |
| 291 | 45 | Earthwork Excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross section shown in the drawings or as directed by the Engineer for the Earthern Drain | |||
| 292 | 45.1 | Road A | 900 | Cubic Metre | |
| 293 | 45.2 | Road B | 1200 | Cubic Metre | |
| 294 | 45.3 | Road C | 1200 | Cubic Metre | |
| 295 | 45.4 | Road D | 6 | Cubic Metre | |
| 296 | 45.5 | Road E | 225 | Cubic Metre | |
| 297 | 45.6 | Road F | 495 | Cubic Metre | |
| 298 | 45.7 | Road G | 70.5 | Cubic Metre | |
| 299 | 46 | Clearing the Light Jungles including weeding out shrubs, bushes, vegetables, growth etc., as per standard specifications and directions of Engineer incharge | |||
| 300 | 46.1 | Road A | 10800 | Square Metre | |
| 301 | 46.2 | Road B | 14400 | Square Metre | |
| 302 | 46.3 | Road C | 11628 | Square Metre | |
| 303 | 46.4 | Road D | 360 | Square Metre | |
| 304 | 46.5 | Road E | 3600 | Square Metre | |
| 305 | 46.6 | Road F | 3240 | Square Metre | |
| 306 | 46.7 | Road G | 960 | Square Metre | |
| 307 | 47 | Provision for Hire charges including pay and allowances of Crews for JCB for clearing the ventway of culverts and clearing on either sides, etc., complete as directed by departmental officers. | |||
| 308 | 47.1 | Road A | 16 | Hrs | |
| 309 | 47.2 | Road B | 36 | Hrs | |
| 310 | 47.3 | Road C | 20 | Hrs | |
| 311 | 47.4 | Road D | 2 | Hrs | |
| 312 | 47.5 | Road E | 4 | Hrs | |
| 313 | 47.6 | Road F | 20 | Hrs | |
| 314 | 47.7 | Road G | 14 | Hrs | |
| 315 | 48 | Painting with synthetic Enamel paint over the existing KM, HM Stones, boundary stones, Guide stones, Parapets of Culverts, Tree number back ground, etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers. | |||
| 316 | 48.1 | Road A | 19.7 | Square Metre | |
| 317 | 48.2 | Road B | 29.71 | Square Metre | |
| 318 | 48.3 | Road C | 24.55 | Square Metre | |
| 319 | 48.4 | Road D | 7.06 | Square Metre | |
| 320 | 48.5 | Road E | 5.99 | Square Metre | |
| 321 | 48.6 | Road F | 11.52 | Square Metre | |
| 322 | 48.7 | Road G | 8.15 | Square Metre | |
| 323 | 49 | Painting with synthetic Enamel paint over the existing iron surfaces, etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers. | |||
| 324 | 49.1 | Road A | 13.46 | Square Metre | |
| 325 | 49.2 | Road B | 13.46 | Square Metre | |
| 326 | 49.3 | Road C | 29 | Square Metre | |
| 327 | 49.4 | Road D | 18.09 | Square Metre | |
| 328 | 49.5 | Road E | 31.55 | Square Metre | |
| 329 | 49.6 | Road F | 26.91 | Square Metre | |
| 330 | 49.7 | Road G | 31.55 | Square Metre | |
| 331 | 50 | Letterings in KM & HM Stones, Culvert parapets / Bridges and tree numbers including cost of Paint and labour charges and all other incidental charges, etc., complete as directed by departmental Engineer. Lettering 5 to 10 cm | |||
| 332 | 50.1 | Road A | 810 | Nos. | |
| 333 | 50.2 | Road B | 876 | Nos. | |
| 334 | 50.3 | Road C | 1154 | Nos. | |
| 335 | 50.4 | Road D | 222 | Nos. | |
| 336 | 50.5 | Road E | 234 | Nos. | |
| 337 | 50.6 | Road F | 293 | Nos. | |
| 338 | 50.7 | Road G | 415 | Nos. | |
| 339 | 51 | Letterings in KM & HM Stones, Culvert parapets / Bridges and tree numbers including cost of Paint and labour charges and all other incidental charges, etc., complete as directed by departmental Engineer. Lettering 10 to 15 cm | |||
| 340 | 51.1 | Road A | 25 | Nos. | |
| 341 | 51.2 | Road B | 25 | Nos. | |
| 342 | 51.3 | Road C | 25 | Nos. | |
| 343 | 51.4 | Road D | 15 | Nos. | |
| 344 | 51.5 | Road E | 5 | Nos. | |
| 345 | 51.6 | Road F | 10 | Nos. | |
| 346 | 51.7 | Road G | 5 | Nos. | |
| 347 | 52 | Whitewashing with white cem over the Culvert parapets, etc., including cost of white cem and labour charges, etc., including all other incidental charges as directed by departmental officers. | |||
| 348 | 52.1 | Road A | 58.53 | Square Metre | |
| 349 | 52.2 | Road B | 109 | Square Metre | |
| 350 | 52.3 | Road C | 62.36 | Square Metre | |
| 351 | 52.4 | Road D | 5.25 | Square Metre | |
| 352 | 52.5 | Road E | 19.2 | Square Metre | |
| 353 | 52.6 | Road F | 65.55 | Square Metre | |
| 354 | 52.7 | Road G | 67.2 | Square Metre | |
| 355 | 53 | Providing Alternate banding of White banding with White cem over the Centre Medians, Avenues, EB Poles etc., including cost of all materials, all labour charges and all other incidental charges etc complete as directed by the departmental officers. | |||
| 356 | 53.1 | Road A | 53.9 | Square Metre | |
| 357 | 53.2 | Road B | 76.48 | Square Metre | |
| 358 | 53.3 | Road C | 94.15 | Square Metre | |
| 359 | 53.4 | Road D | 10.8 | Square Metre | |
| 360 | 53.5 | Road E | 9.4 | Square Metre | |
| 361 | 53.6 | Road F | 79.67 | Square Metre | |
| 362 | 53.7 | Road G | 25.15 | Square Metre | |
| 363 | 54 | Providing Alternate banding of Black banding with Japan Black over the Centre Medians, Avenues, EB Poles etc., including cost of all materials, all labour charges and all other incidental charges etc complete as directed by the departmental officers. | |||
| 364 | 54.1 | Road A | 26.95 | Square Metre | |
| 365 | 54.2 | Road B | 38.25 | Square Metre | |
| 366 | 54.3 | Road C | 47.08 | Square Metre | |
| 367 | 54.4 | Road D | 5.4 | Square Metre | |
| 368 | 54.5 | Road E | 4.7 | Square Metre | |
| 369 | 54.6 | Road F | 39.84 | Square Metre | |
| 370 | 54.7 | Road G | 12.58 | Square Metre | |
| 371 | 55 | Painting with synthetic Enamel paint over the existing Guide stones, Boundary stones, etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers. | |||
| 372 | 55.1 | Road A | 175.1 | Square Metre | |
| 373 | 55.2 | Road B | 99.5 | Square Metre | |
| 374 | 55.3 | Road C | 106.1 | Square Metre | |
| 375 | 55.4 | Road D | 11.25 | Square Metre | |
| 376 | 55.5 | Road E | 31.1 | Square Metre | |
| 377 | 55.6 | Road F | 61.33 | Square Metre | |
| 378 | 55.7 | Road G | 15.45 | Square Metre | |
| 379 | 56 | Upkeeping of Roads for 3rd Year\nProviding and laying of Carted Earth including cost and conveyance of the same to work site including stacking the same to departmental gauge for premeasurement including all labour charges for laying, spreading etc., complete and as directed by the departmental Engineers. | |||
| 380 | 56.1 | Road A | 270 | Cubic Metre | |
| 381 | 56.2 | Road B | 360 | Cubic Metre | |
| 382 | 56.3 | Road C | 360 | Cubic Metre | |
| 383 | 56.4 | Road D | 60 | Cubic Metre | |
| 384 | 56.5 | Road E | 90 | Cubic Metre | |
| 385 | 56.6 | Road F | 156 | Cubic Metre | |
| 386 | 56.7 | Road G | 84 | Cubic Metre | |
| 387 | 57 | Earthwork Excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross section shown in the drawings or as directed by the Engineer for the Earthern Drain | |||
| 388 | 57.1 | Road A | 900 | Cubic Metre | |
| 389 | 57.2 | Road B | 1200 | Cubic Metre | |
| 390 | 57.3 | Road C | 1200 | Cubic Metre | |
| 391 | 57.4 | Road D | 6 | Cubic Metre | |
| 392 | 57.5 | Road E | 225 | Cubic Metre | |
| 393 | 57.6 | Road F | 495 | Cubic Metre | |
| 394 | 57.7 | Road G | 70.5 | Cubic Metre | |
| 395 | 58 | Clearing the Light Jungles including weeding out shrubs, bushes, vegetables, growth etc., as per standard specifications and directions of Engineer incharge | |||
| 396 | 58.1 | Road A | 10800 | Square Metre | |
| 397 | 58.2 | Road B | 14400 | Square Metre | |
| 398 | 58.3 | Road C | 11628 | Square Metre | |
| 399 | 58.4 | Road D | 360 | Square Metre | |
| 400 | 58.5 | Road E | 3600 | Square Metre | |
| 401 | 58.6 | Road F | 3240 | Square Metre | |
| 402 | 58.7 | Road G | 960 | Square Metre | |
| 403 | 59 | Provision for Hire charges including pay and allowances of Crews for JCB for clearing the ventway of culverts and clearing on either sides, etc., complete as directed by departmental officers. | |||
| 404 | 59.1 | Road A | 16 | Hrs | |
| 405 | 59.2 | Road B | 36 | Hrs | |
| 406 | 59.3 | Road C | 20 | Hrs | |
| 407 | 59.4 | Road D | 2 | Hrs | |
| 408 | 59.5 | Road E | 4 | Hrs | |
| 409 | 59.6 | Road F | 20 | Hrs | |
| 410 | 59.7 | Road G | 14 | Hrs | |
| 411 | 60 | Painting with synthetic Enamel paint over the existing KM, HM Stones, boundary stones, Guide stones, Parapets of Culverts, Tree number back ground, etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers. | |||
| 412 | 60.1 | Road A | 19.7 | Square Metre | |
| 413 | 60.2 | Road B | 29.71 | Square Metre | |
| 414 | 60.3 | Road C | 24.55 | Square Metre | |
| 415 | 60.4 | Road D | 7.06 | Square Metre | |
| 416 | 60.5 | Road E | 5.99 | Square Metre | |
| 417 | 60.6 | Road F | 11.52 | Square Metre | |
| 418 | 60.7 | Road G | 8.15 | Square Metre | |
| 419 | 61 | Painting with synthetic Enamel paint over the existing iron surfaces, etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers. | |||
| 420 | 61.1 | Road A | 13.46 | Square Metre | |
| 421 | 61.2 | Road B | 13.46 | Square Metre | |
| 422 | 61.3 | Road C | 29 | Square Metre | |
| 423 | 61.4 | Road D | 18.09 | Square Metre | |
| 424 | 61.5 | Road E | 31.55 | Square Metre | |
| 425 | 61.6 | Road F | 26.91 | Square Metre | |
| 426 | 61.7 | Road G | 31.55 | Square Metre | |
| 427 | 62 | Letterings in KM & HM Stones, Culvert parapets / Bridges and tree numbers including cost of Paint and labour charges and all other incidental charges, etc., complete as directed by departmental Engineer. Lettering 5 to 10 cm | |||
| 428 | 62.1 | Road A | 810 | Nos. | |
| 429 | 62.2 | Road B | 876 | Nos. | |
| 430 | 62.3 | Road C | 1154 | Nos. | |
| 431 | 62.4 | Road D | 222 | Nos. | |
| 432 | 62.5 | Road E | 234 | Nos. | |
| 433 | 62.6 | Road F | 293 | Nos. | |
| 434 | 62.7 | Road G | 415 | Nos. | |
| 435 | 63 | Letterings in KM & HM Stones, Culvert parapets / Bridges and tree numbers including cost of Paint and labour charges and all other incidental charges, etc., complete as directed by departmental Engineer. Lettering 10 to 15 cm | |||
| 436 | 63.1 | Road A | 25 | Nos. | |
| 437 | 63.2 | Road B | 25 | Nos. | |
| 438 | 63.3 | Road C | 25 | Nos. | |
| 439 | 63.4 | Road D | 15 | Nos. | |
| 440 | 63.5 | Road E | 5 | Nos. | |
| 441 | 63.6 | Road F | 10 | Nos. | |
| 442 | 63.7 | Road G | 5 | Nos. | |
| 443 | 64 | Whitewashing with white cem over the Culvert parapets, etc., including cost of white cem and labour charges, etc., including all other incidental charges as directed by departmental officers. | |||
| 444 | 64.1 | Road A | 58.53 | Square Metre | |
| 445 | 64.2 | Road B | 109 | Square Metre | |
| 446 | 64.3 | Road C | 62.36 | Square Metre | |
| 447 | 64.4 | Road D | 5.25 | Square Metre | |
| 448 | 64.5 | Road E | 19.2 | Square Metre | |
| 449 | 64.6 | Road F | 65.55 | Square Metre | |
| 450 | 64.7 | Road G | 67.2 | Square Metre | |
| 451 | 65 | Providing Alternate banding of White banding with White cem over the Centre Medians, Avenues, EB Poles etc., including cost of all materials, all labour charges and all other incidental charges etc complete as directed by the departmental officers. | |||
| 452 | 65.1 | Road A | 53.9 | Square Metre | |
| 453 | 65.2 | Road B | 76.48 | Square Metre | |
| 454 | 65.3 | Road C | 94.15 | Square Metre | |
| 455 | 65.4 | Road D | 10.8 | Square Metre | |
| 456 | 65.5 | Road E | 9.4 | Square Metre | |
| 457 | 65.6 | Road F | 79.67 | Square Metre | |
| 458 | 65.7 | Road G | 25.15 | Square Metre | |
| 459 | 66 | Providing Alternate banding of Black banding with Japan Black over the Centre Medians, Avenues, EB Poles etc., including cost of all materials, all labour charges and all other incidental charges etc complete as directed by the departmental officers. | |||
| 460 | 66.1 | Road A | 26.95 | Square Metre | |
| 461 | 66.2 | Road B | 38.25 | Square Metre | |
| 462 | 66.3 | Road C | 47.08 | Square Metre | |
| 463 | 66.4 | Road D | 5.4 | Square Metre | |
| 464 | 66.5 | Road E | 4.7 | Square Metre | |
| 465 | 66.6 | Road F | 39.84 | Square Metre | |
| 466 | 66.7 | Road G | 12.58 | Square Metre | |
| 467 | 67 | Painting with synthetic Enamel paint over the existing Guide stones, Boundary stones, etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers. | |||
| 468 | 67.1 | Road A | 175.1 | Square Metre | |
| 469 | 67.2 | Road B | 99.5 | Square Metre | |
| 470 | 67.3 | Road C | 106.1 | Square Metre | |
| 471 | 67.4 | Road D | 11.25 | Square Metre | |
| 472 | 67.5 | Road E | 31.1 | Square Metre | |
| 473 | 67.6 | Road F | 61.33 | Square Metre | |
| 474 | 67.7 | Road G | 15.45 | Square Metre | |
| 475 | 68 | Upkeeping of Roads for 4th Year\nProviding and laying of Carted Earth including cost and conveyance of the same to work site including stacking the same to departmental gauge for premeasurement including all labour charges for laying, spreading etc., complete and as directed by the departmental Engineers. | |||
| 476 | 68.1 | Road A | 270 | Cubic Metre | |
| 477 | 68.2 | Road B | 360 | Cubic Metre | |
| 478 | 68.3 | Road C | 360 | Cubic Metre | |
| 479 | 68.4 | Road D | 60 | Cubic Metre | |
| 480 | 68.5 | Road E | 90 | Cubic Metre | |
| 481 | 68.6 | Road F | 156 | Cubic Metre | |
| 482 | 68.7 | Road G | 84 | Cubic Metre | |
| 483 | 69 | Earthwork Excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross section shown in the drawings or as directed by the Engineer for the Earthern Drain | |||
| 484 | 69.1 | Road A | 900 | Cubic Metre | |
| 485 | 69.2 | Road B | 1200 | Cubic Metre | |
| 486 | 69.3 | Road C | 1200 | Cubic Metre | |
| 487 | 69.4 | Road D | 6 | Cubic Metre | |
| 488 | 69.5 | Road E | 225 | Cubic Metre | |
| 489 | 69.6 | Road F | 495 | Cubic Metre | |
| 490 | 69.7 | Road G | 70.5 | Cubic Metre | |
| 491 | 70 | Clearing the Light Jungles including weeding out shrubs, bushes, vegetables, growth etc., as per standard specifications and directions of Engineer incharge | |||
| 492 | 70.1 | Road A | 10800 | Square Metre | |
| 493 | 70.2 | Road B | 14400 | Square Metre | |
| 494 | 70.3 | Road C | 11628 | Square Metre | |
| 495 | 70.4 | Road D | 360 | Square Metre | |
| 496 | 70.5 | Road E | 3600 | Square Metre | |
| 497 | 70.6 | Road F | 3240 | Square Metre | |
| 498 | 70.7 | Road G | 960 | Square Metre | |
| 499 | 71 | Provision for Hire charges including pay and allowances of Crews for JCB for clearing the ventway of culverts and clearing on either sides, etc., complete as directed by departmental officers. | |||
| 500 | 71.1 | Road A | 16 | Hrs | |
| 501 | 71.2 | Road B | 36 | Hrs | |
| 502 | 71.3 | Road C | 20 | Hrs | |
| 503 | 71.4 | Road D | 2 | Hrs | |
| 504 | 71.5 | Road E | 4 | Hrs | |
| 505 | 71.6 | Road F | 20 | Hrs | |
| 506 | 71.7 | Road G | 14 | Hrs | |
| 507 | 72 | Painting with synthetic Enamel paint over the existing KM, HM Stones, boundary stones, Guide stones, Parapets of Culverts, Tree number back ground, etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers. | |||
| 508 | 72.1 | Road A | 19.7 | Square Metre | |
| 509 | 72.2 | Road B | 29.71 | Square Metre | |
| 510 | 72.3 | Road C | 24.55 | Square Metre | |
| 511 | 72.4 | Road D | 7.06 | Square Metre | |
| 512 | 72.5 | Road E | 5.99 | Square Metre | |
| 513 | 72.6 | Road F | 11.52 | Square Metre | |
| 514 | 72.7 | Road G | 8.15 | Square Metre | |
| 515 | 73 | Painting with synthetic Enamel paint over the existing iron surfaces, etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers. | |||
| 516 | 73.1 | Road A | 13.46 | Square Metre | |
| 517 | 73.2 | Road B | 13.46 | Square Metre | |
| 518 | 73.3 | Road C | 29 | Square Metre | |
| 519 | 73.4 | Road D | 18.09 | Square Metre | |
| 520 | 73.5 | Road E | 31.55 | Square Metre | |
| 521 | 73.6 | Road F | 26.91 | Square Metre | |
| 522 | 73.7 | Road G | 31.55 | Square Metre | |
| 523 | 74 | Letterings in KM & HM Stones, Culvert parapets / Bridges and tree numbers including cost of Paint and labour charges and all other incidental charges, etc., complete as directed by departmental Engineer. Lettering 5 to 10 cm | |||
| 524 | 74.1 | Road A | 810 | Nos. | |
| 525 | 74.2 | Road B | 876 | Nos. | |
| 526 | 74.3 | Road C | 1154 | Nos. | |
| 527 | 74.4 | Road D | 222 | Nos. | |
| 528 | 74.5 | Road E | 234 | Nos. | |
| 529 | 74.6 | Road F | 293 | Nos. | |
| 530 | 74.7 | Road G | 415 | Nos. | |
| 531 | 75 | Letterings in KM & HM Stones, Culvert parapets / Bridges and tree numbers including cost of Paint and labour charges and all other incidental charges, etc., complete as directed by departmental Engineer. Lettering 10 to 15 cm | |||
| 532 | 75.1 | Road A | 25 | Nos. | |
| 533 | 75.2 | Road B | 25 | Nos. | |
| 534 | 75.3 | Road C | 25 | Nos. | |
| 535 | 75.4 | Road D | 15 | Nos. | |
| 536 | 75.5 | Road E | 5 | Nos. | |
| 537 | 75.6 | Road F | 10 | Nos. | |
| 538 | 75.7 | Road G | 5 | Nos. | |
| 539 | 76 | Whitewashing with white cem over the Culvert parapets, etc., including cost of white cem and labour charges, etc., including all other incidental charges as directed by departmental officers. | |||
| 540 | 76.1 | Road A | 58.53 | Square Metre | |
| 541 | 76.2 | Road B | 109 | Square Metre | |
| 542 | 76.3 | Road C | 62.36 | Square Metre | |
| 543 | 76.4 | Road D | 5.25 | Square Metre | |
| 544 | 76.5 | Road E | 19.2 | Square Metre | |
| 545 | 76.6 | Road F | 65.55 | Square Metre | |
| 546 | 76.7 | Road G | 67.2 | Square Metre | |
| 547 | 77 | Providing Alternate banding of White banding with White cem over the Centre Medians, Avenues, EB Poles etc., including cost of all materials, all labour charges and all other incidental charges etc complete as directed by the departmental officers. | |||
| 548 | 77.1 | Road A | 53.9 | Square Metre | |
| 549 | 77.2 | Road B | 76.48 | Square Metre | |
| 550 | 77.3 | Road C | 94.15 | Square Metre | |
| 551 | 77.4 | Road D | 10.8 | Square Metre | |
| 552 | 77.5 | Road E | 9.4 | Square Metre | |
| 553 | 77.6 | Road F | 79.67 | Square Metre | |
| 554 | 77.7 | Road G | 25.15 | Square Metre | |
| 555 | 78 | Providing Alternate banding of Black banding with Japan Black over the Centre Medians, Avenues, EB Poles etc., including cost of all materials, all labour charges and all other incidental charges etc complete as directed by the departmental officers. | |||
| 556 | 78.1 | Road A | 26.95 | Square Metre | |
| 557 | 78.2 | Road B | 38.25 | Square Metre | |
| 558 | 78.3 | Road C | 47.08 | Square Metre | |
| 559 | 78.4 | Road D | 5.4 | Square Metre | |
| 560 | 78.5 | Road E | 4.7 | Square Metre | |
| 561 | 78.6 | Road F | 39.84 | Square Metre | |
| 562 | 78.7 | Road G | 12.58 | Square Metre | |
| 563 | 79 | Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 - over granular surfaces treated with primer. | |||
| 564 | 79.1 | Road A | 495 | Square Metre | |
| 565 | 79.2 | Road B | 660 | Square Metre | |
| 566 | 79.3 | Road C | 660 | Square Metre | |
| 567 | 79.4 | Road D | 112.5 | Square Metre | |
| 568 | 79.5 | Road E | 315 | Square Metre | |
| 569 | 79.6 | Road F | 292.5 | Square Metre | |
| 570 | 79.7 | Road G | 158.44 | Square Metre | |
| 571 | 80 | Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade - 30) at percentage specified by JMF of mix and filler, transporting the hot mix to work site, to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects) - Grading II | |||
| 572 | 80.1 | Road A | 14.85 | Cubic Metre | |
| 573 | 80.2 | Road B | 19.8 | Cubic Metre | |
| 574 | 80.3 | Road C | 19.8 | Cubic Metre | |
| 575 | 80.4 | Road D | 3.38 | Cubic Metre | |
| 576 | 80.5 | Road E | 9.45 | Cubic Metre | |
| 577 | 80.6 | Road F | 8.78 | Cubic Metre | |
| 578 | 80.7 | Road G | 4.75 | Cubic Metre | |
| 579 | 81 | Painting with synthetic Enamel paint over the existing Guide stones, Boundary stones, etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers. | |||
| 580 | 81.1 | Road A | 175.1 | Square Metre | |
| 581 | 81.2 | Road B | 99.5 | Square Metre | |
| 582 | 81.3 | Road C | 106.1 | Square Metre | |
| 583 | 81.4 | Road D | 11.25 | Square Metre | |
| 584 | 81.5 | Road E | 31.1 | Square Metre | |
| 585 | 81.6 | Road F | 61.33 | Square Metre | |
| 586 | 81.7 | Road G | 15.45 | Square Metre | |
| 587 | 82 | Upkeeping of Roads for 5th Year \nProviding and laying of Carted Earth including cost and conveyance of the same to work site including stacking the same to departmental gauge for premeasurement including all labour charges for laying, spreading etc., complete and as directed by the departmental Engineers. | |||
| 588 | 82.1 | Road A | 270 | Cubic Metre | |
| 589 | 82.2 | Road B | 360 | Cubic Metre | |
| 590 | 82.3 | Road C | 360 | Cubic Metre | |
| 591 | 82.4 | Road D | 60 | Cubic Metre | |
| 592 | 82.5 | Road E | 90 | Cubic Metre | |
| 593 | 82.6 | Road F | 156 | Cubic Metre | |
| 594 | 82.7 | Road G | 84 | Cubic Metre | |
| 595 | 83 | Earthwork Excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross section shown in the drawings or as directed by the Engineer for the Earthern Drain | |||
| 596 | 83.1 | Road A | 900 | Cubic Metre | |
| 597 | 83.2 | Road B | 1200 | Cubic Metre | |
| 598 | 83.3 | Road C | 1200 | Cubic Metre | |
| 599 | 83.4 | Road D | 6 | Cubic Metre | |
| 600 | 83.5 | Road E | 225 | Cubic Metre | |
| 601 | 83.6 | Road F | 495 | Cubic Metre | |
| 602 | 83.7 | Road G | 70.5 | Cubic Metre | |
| 603 | 84 | Clearing the Light Jungles including weeding out shrubs, bushes, vegetables, growth etc., as per standard specifications and directions of Engineer incharge | |||
| 604 | 84.1 | Road A | 10800 | Square Metre | |
| 605 | 84.2 | Road B | 14400 | Square Metre | |
| 606 | 84.3 | Road C | 11628 | Square Metre | |
| 607 | 84.4 | Road D | 360 | Square Metre | |
| 608 | 84.5 | Road E | 3600 | Square Metre | |
| 609 | 84.6 | Road F | 3240 | Square Metre | |
| 610 | 84.7 | Road G | 960 | Square Metre | |
| 611 | 85 | Provision for Hire charges including pay and allowances of Crews for JCB for clearing the ventway of culverts and clearing on either sides, etc., complete as directed by departmental officers. | |||
| 612 | 85.1 | Road A | 16 | Hrs | |
| 613 | 85.2 | Road B | 36 | Hrs | |
| 614 | 85.3 | Road C | 20 | Hrs | |
| 615 | 85.4 | Road D | 2 | Hrs | |
| 616 | 85.5 | Road E | 4 | Hrs | |
| 617 | 85.6 | Road F | 20 | Hrs | |
| 618 | 85.7 | Road G | 14 | Hrs | |
| 619 | 86 | Painting with synthetic Enamel paint over the existing KM, HM Stones, boundary stones, Guide stones, Parapets of Culverts, Tree number back ground, etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers. | |||
| 620 | 86.1 | Road A | 19.7 | Square Metre | |
| 621 | 86.2 | Road B | 29.71 | Square Metre | |
| 622 | 86.3 | Road C | 24.55 | Square Metre | |
| 623 | 86.4 | Road D | 7.06 | Square Metre | |
| 624 | 86.5 | Road E | 5.99 | Square Metre | |
| 625 | 86.6 | Road F | 11.52 | Square Metre | |
| 626 | 86.7 | Road G | 8.15 | Square Metre | |
| 627 | 87 | Painting with synthetic Enamel paint over the existing iron surfaces, etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers. | |||
| 628 | 87.1 | Road A | 13.46 | Square Metre | |
| 629 | 87.2 | Road B | 13.46 | Square Metre | |
| 630 | 87.3 | Road C | 29 | Square Metre | |
| 631 | 87.4 | Road D | 18.09 | Square Metre | |
| 632 | 87.5 | Road E | 31.55 | Square Metre | |
| 633 | 87.6 | Road F | 26.91 | Square Metre | |
| 634 | 87.7 | Road G | 31.55 | Square Metre | |
| 635 | 88 | Letterings in KM & HM Stones, Culvert parapets / Bridges and tree numbers including cost of Paint and labour charges and all other incidental charges, etc., complete as directed by departmental Engineer. Lettering 5 to 10 cm | |||
| 636 | 88.1 | Road A | 810 | Nos. | |
| 637 | 88.2 | Road B | 876 | Nos. | |
| 638 | 88.3 | Road C | 1154 | Nos. | |
| 639 | 88.4 | Road D | 222 | Nos. | |
| 640 | 88.5 | Road E | 234 | Nos. | |
| 641 | 88.6 | Road F | 293 | Nos. | |
| 642 | 88.7 | Road G | 415 | Nos. | |
| 643 | 89 | Letterings in KM & HM Stones, Culvert parapets / Bridges and tree numbers including cost of Paint and labour charges and all other incidental charges, etc., complete as directed by departmental Engineer. Lettering 10 to 15 cm | |||
| 644 | 89.1 | Road A | 25 | Nos. | |
| 645 | 89.2 | Road B | 25 | Nos. | |
| 646 | 89.3 | Road C | 25 | Nos. | |
| 647 | 89.4 | Road D | 15 | Nos. | |
| 648 | 89.5 | Road E | 5 | Nos. | |
| 649 | 89.6 | Road F | 10 | Nos. | |
| 650 | 89.7 | Road G | 5 | Nos. | |
| 651 | 90 | Whitewashing with white cem over the Culvert parapets, etc., including cost of white cem and labour charges, etc., including all other incidental charges as directed by departmental officers. | |||
| 652 | 90.1 | Road A | 58.53 | Square Metre | |
| 653 | 90.2 | Road B | 109 | Square Metre | |
| 654 | 90.3 | Road C | 62.36 | Square Metre | |
| 655 | 90.4 | Road D | 5.25 | Square Metre | |
| 656 | 90.5 | Road E | 19.2 | Square Metre | |
| 657 | 90.6 | Road F | 65.55 | Square Metre | |
| 658 | 90.7 | Road G | 67.2 | Square Metre | |
| 659 | 91 | Providing Alternate banding of White banding with White cem over the Centre Medians, Avenues, EB Poles etc., including cost of all materials, all labour charges and all other incidental charges etc complete as directed by the departmental officers. | |||
| 660 | 91.1 | Road A | 53.9 | Square Metre | |
| 661 | 91.2 | Road B | 76.48 | Square Metre | |
| 662 | 91.3 | Road C | 94.15 | Square Metre | |
| 663 | 91.4 | Road D | 10.8 | Square Metre | |
| 664 | 91.5 | Road E | 9.4 | Square Metre | |
| 665 | 91.6 | Road F | 79.67 | Square Metre | |
| 666 | 91.7 | Road G | 25.15 | Square Metre | |
| 667 | 92 | Providing Alternate banding of Black banding with Japan Black over the Centre Medians, Avenues, EB Poles etc., including cost of all materials, all labour charges and all other incidental charges etc complete as directed by the departmental officers. | |||
| 668 | 92.1 | Road A | 26.95 | Square Metre | |
| 669 | 92.2 | Road B | 38.25 | Square Metre | |
| 670 | 92.3 | Road C | 47.08 | Square Metre | |
| 671 | 92.4 | Road D | 5.4 | Square Metre | |
| 672 | 92.5 | Road E | 4.7 | Square Metre | |
| 673 | 92.6 | Road F | 39.84 | Square Metre | |
| 674 | 92.7 | Road G | 12.58 | Square Metre | |
| 675 | 93 | Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 - over granular surfaces treated with primer. | |||
| 676 | 93.1 | Road A | 825 | Square Metre | |
| 677 | 93.2 | Road B | 1100 | Square Metre | |
| 678 | 93.3 | Road C | 1100 | Square Metre | |
| 679 | 93.4 | Road D | 187.5 | Square Metre | |
| 680 | 93.5 | Road E | 525 | Square Metre | |
| 681 | 93.6 | Road F | 487.5 | Square Metre | |
| 682 | 93.7 | Road G | 264.06 | Square Metre | |
| 683 | 94 | Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade - 30) at percentage specified by JMF of mix and filler, transporting the hot mix to work site, to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects) - Grading II | |||
| 684 | 94.1 | Road A | 24.75 | Cubic Metre | |
| 685 | 94.2 | Road B | 33 | Cubic Metre | |
| 686 | 94.3 | Road C | 33 | Cubic Metre | |
| 687 | 94.4 | Road D | 5.63 | Cubic Metre | |
| 688 | 94.5 | Road E | 15.75 | Cubic Metre | |
| 689 | 94.6 | Road F | 14.63 | Cubic Metre | |
| 690 | 94.7 | Road G | 7.92 | Cubic Metre | |
| 691 | 95 | Painting with synthetic Enamel paint over the existing Guide stones, Boundary stones, etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers. | |||
| 692 | 95.1 | Road A | 175.1 | Square Metre | |
| 693 | 95.2 | Road B | 99.5 | Square Metre | |
| 694 | 95.3 | Road C | 106.1 | Square Metre | |
| 695 | 95.4 | Road D | 11.25 | Square Metre | |
| 696 | 95.5 | Road E | 31.1 | Square Metre | |
| 697 | 95.6 | Road F | 61.33 | Square Metre | |
| 698 | 95.7 | Road G | 15.45 | Square Metre | |
| 699 | 97 | Calculation of SubTotal, GST and Total Amount carried out by system automatically | |||
| 700 | 97.1 | Basic cost of value put to tender as per estimate | 1 | (A) | |
| 701 | 97.2 | Add GST at 12% | 1 | (B) | |
| 702 | 97.3 | Total Value put to Tender | 1 | (A+B) | |
| 703 | 97.4 | Quoted value | 1 | (D) | |
| 704 | 97.5 | Final Quoted Value | 1 | (E) | |
| 705 | 97.6 | Add GST at 12% of Final Quoted Value | 1 | (F) | |
| 706 | 97.7 | Total Value of Contract Including 12% of GST | 1 | (E+F) |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.