Road Transport and Highways Government Departments Closing in 0 days TDR #21820676

Tender For Tiruvannamalai Improvement Works , Construction Of Culvert And Retaining Wall Works Including Upkeeping In Chengam ( H ) C And M And Sub Division Jurisdiction

Issued by Government Departments · Chengam, Tamil Nadu
Tender Value
7.06 Crore
Estimated cost
Bid Submission
16 Oct 2019
0 days left
EMD
3.64 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Chengam → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Improvement Works, Construction Of Culvert And Retaining Wall Works Including Upkeeping In Chengam ( H ) C&M Sub Division Jurisdictiona ) Improvements Of Chengam - Kuppanatham Road At Km 1 / 2 - 3 / 0 Including Upkeeping For A Period Of 60 Months ( 01-Cridp-19- 20-P-3586 ) B ) Improvements Of Chengam - Kuppanatham Road At Km 3 / 0 - 5 / 0 Including Upkeeping For A Period Of 60 Months ( 01-Cridp-19- 20-P-3587 ) C ) Improvements To Riding Quality At Km 0 / 0 - 2 / 6 Of Pondy - Krishnagiri Road To Paliyapattu Road Including Upkeeping For A Period Of 60 Months ( 01-Cridp-19-20-I-3969 ) D ) Improvements To Riding Quality At Km 0 / 0 - 4 / 8 Of Kayampattu Theethandapattu H / C Road ( Via ) Valayampattu Including Upkeeping For A Period Of 60 Months ( 01-Cridp-19-20-I-3994 ) E ) Improvements To Riding Quality At Km 0 / 0 - 1 / 6 & 0 / 0 - 1 / 4 Of Polur Chengam Road To Pudur Chengam Road, Joint Ammapalayam - Pudupalayam Road ( Road A ) Including Upkeeping For A Period Of 60 Months ( 01-Cridp-19-20-I-3995 ) F ) Construction Of Retaining Wall At Km 0 / 0 - 0 / 4 Of Polur - Chengam Road To Kolanthangal Road ( 01-Cridp-19-20-O-2093 ) G ) Construction Of Retaining Wall At Km 3 / 2 & 4 / 2 - 5 / 0 Of Polur - Chengam Road To Pondy Krishnagiri Road ( Via ) Chennasamudiram ( 01-Cridp-19-20-O-2094 ) H ) Reconstruction Of Rcc Slab Culvert At Km 140 / 8 Of Pondy Krishnagiri Road ( Nh 66 Abandoned Stretch ) ( Sh ) ( 01-Cridp-19-20-S-0169 ) I ) Reconstruction Of Pipe Culvert At Km 5 / 10 Of Chengam - Kuppanatham Road ( 01-Cridp-19-20-O-2063 ) J ) Reconstruction Of Rcc Slab Culvert At Km 0 / 2, 1 / 2, 1 / 4, 0 / 2 ( I ) ( Ii ) , 0 / 8, 0 / 10 Of Polur - Chengam Road To Pudur - Chengam Road Joint Ammapalayam Pudupalayam Road ( Road A ) ( 01-Cridp-19-20-O-2079 ) K ) Reconstruction Of Rcc Slab Culvert At Km 0 / 4, 0 / 10, 2 / 6 ( I ) , ( Ii ) Of Kayampattu Theethandapattu H / C Road ( Via ) Valayampattu ( 01-Cridp-19-20-O-2085 )

BOQ

Name of work : Package 98 Improvement Works, Construction of Culvert and Retaining Wall Works including upkeeping in Chengam (H) C&M Sub Division JurisdictionA) Improvements of Chengam - Kuppanatham road at Km 1/2 - 3/0 including Upkeeping for a period of 60 months (01-CRIDP-19- 20-P-3586) B) Improvements of Chengam - Kuppanatham road at Km 3/0 - 5/0 including Upkeeping for a period of 60 months (01-CRIDP-19- 20-P-3587)C) Improvements to Riding quality at Km 0/0 - 2/6 of Pondy - Krishnagiri road to Paliyapattu road including Upkeeping for a period of 60 months (01-CRIDP-19-20-I-3969 ) D) Improvements to Riding quality at Km 0/0 - 4/8 of Kayampattu Theethandapattu H/C road (via) Valayampattu including Upkeeping for a period of 60 months (01-CRIDP-19-20-I-3994) E) Improvements to Riding quality at Km 0/0 - 1/6 & 0/0 - 1/4 of Polur Chengam road to Pudur Chengam road, joint Ammapalayam - Pudupalayam road (Road A) including Upkeeping for a period of 60 months (01-CRIDP-19-20-I-3995) F) Construction of Retaining wall at Km 0/0 - 0/4 of Polur - Chengam road to Kolanthangal road ( 01-CRIDP-19-20-O-2093) G) Construction of Retaining wall at Km 3/2 & 4/2 - 5/0 of Polur - Chengam road to Pondy Krishnagiri road (via) Chennasamudiram (01-CRIDP-19-20-O-2094) H) Reconstruction of RCC Slab Culvert at Km 140/8 of Pondy Krishnagiri Road (NH 66 Abandoned Stretch) (SH) (01-CRIDP-19-20-S-0169) I) Reconstruction of Pipe Culvert at Km 5/10 of Chengam - Kuppanatham road (01-CRIDP-19-20-O-2063) J) Reconstruction of RCC Slab Culvert at Km 0/2, 1/2, 1/4, 0/2(i) (ii), 0/8, 0/10 of Polur - Chengam road to Pudur - Chengam road joint Ammapalayam Pudupalayam road (Road A) (01-CRIDP-19-20-O-2079) K) Reconstruction of RCC Slab Culvert at Km 0/4, 0/10, 2/6(i), (ii) of Kayampattu Theethandapattu H/C road (via) Valayampattu (01-CRIDP-19-20-O-2085)
Sl.No.Item DescriptionItem Code / MakeQuantityUnits
11Earthwork Excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for box cutting for wideneing portion as per standard specification MORTH Rev.V No. 111,112,301,304BI01010001010000000000000515BI0100001112
21.1Road CBI01010001010000000000000515BI0100001113900Cubic Metre
31.2Road D3000Cubic Metre
41.3Road E800Cubic Metre
52Wet Mix Macadam (Table 400-13) (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at Optimum Moisture Content in accordance with IS 2720 (part 8) in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, Complete as per clause 406)
62.1Road A1733.85Cubic Metre
72.2Road B1270.5Cubic Metre
82.3Road C122.25Cubic Metre
92.4Road D123.19Cubic Metre
102.5Road E121.5Cubic Metre
112.6Road H50Cubic Metre
123Prime coat Providing and applying primer coat with bitumen emulsion (SS-I type) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per clause 502) - over WMM/ WBM
133.1Road A11559Square Metre
143.2Road B8470Square Metre
153.3Road C1222.5Square Metre
163.4Road D821.25Square Metre
173.5Road E1215Square Metre
183.6Road H200Square Metre
194Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the granular surface treated with primer as per clause 503 - over granular surfaces treated with primer
204.1Road A11559Square Metre
214.2Road B8470Square Metre
224.3Road C1222.5Square Metre
234.4Road D821.25Square Metre
244.5Road E1215Square Metre
254.6Road H200Square Metre
265Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the bituminous surface cleaned with mechanical broom and high pressure air jet,or other means as directed by the Engineer.As per clause 503 - over bituminous surfaces
275.1Road B2530Square Metre
285.2Road C8880Square Metre
295.3Road D17200Square Metre
305.4Road E10093.8Square Metre
316Bituminous Macadam (Table - 500-10) - (Providing and laying Bituminous Macadam with Hot Mix Plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade 30) at percentage specified by JMF by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic Paver Finisher to the required grade, level and alignment, rolling with smooth wheeled vibratory and tandem rollers to achieve the desired compaction as per Clause 505 MORT&H Rev-V) - Grading II.
326.1Road A577.95Cubic Metre
336.2Road B550Cubic Metre
346.3Road C100.88Cubic Metre
356.4Road D175.82Cubic Metre
366.5Road E110.95Cubic Metre
376.6Road H10Cubic Metre
387Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade - 30) at percentage specified by JMF of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects) - Grading II
397.1Road A346.77Cubic Metre
407.2Road B330Cubic Metre
417.3Road C303.08Cubic Metre
427.4Road D540.64Cubic Metre
437.5Road E339.26Cubic Metre
447.6Road H6Cubic Metre
458Forming and raising the Berms with carted earth with a lead of 5 km from the approved source to work site including cost of earth, conveyance charges and filling levelling to the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for making up the berms
468.1Road A360Cubic Metre
478.2Road B280Cubic Metre
488.3Road C180Cubic Metre
498.4Road D960Cubic Metre
508.5Road E240Cubic Metre
519Vibrated Cement concrete M15, 1:2:4 mix using 20mm ISS HBG graded metal including cost and conveyance of all materials to site, complying to the required standard and specifications including labour charges for formwork, laying, watering, compacting, vibration charges, curing and all other incidental charges etc., complete as per relevant standard specification for repairing the parapet and culvert portion.
529.1Road C4.73Cubic Metre
539.2Road D1.36Cubic Metre
5410Providing RCC M15 grade precast KM Stone of standard design as per IRC: 8 - 1980 and fixing in position including all incidental charges, etc., complete as per MORT&H specification No. 804 and as directed by the Engineer.
5510.1Road A2Number
5610.2Road B2Number
5710.3Road C3Number
5810.4Road D5Number
5910.5Road E2Number
6011Providing RCC M15 grade precast HM Stone of standard design as per IRC: 26 - 1976 and fixing in position including all incidental charges, etc., complete as per MORT&H specification No. 804 and as directed by the Engineer.
6111.1Road A7Number
6211.2Road B8Number
6311.3Road C10Number
6411.4Road D20Number
6511.5Road E13Number
6612Supply and fixing of RCC Guide post of size 0.20 x 0.20 x 1.20m using vibrated RCC 1:2:4 mix using 20mm ISS HBG metal and fixing 0.50m below GL and side packing CC 1:3:6 using 40mm HBG metal including cost and conveyance of all materials to site, including moulding and fixing charges and all other incidental charges, etc., complete as directed by the Engineer.
6712.1Road A20Number
6812.2Road C35Number
6912.3Road D95Number
7012.4Road E85Number
7113Clearing the Light Jungles including weeding out shrubs, bushes, vegetables, growth etc., as per standard specifications and directions of Engineer incharge
7213.1Road A3240Square Metre
7313.2Road B1710Square Metre
7413.3Road C2340Square Metre
7513.4Road D8640Square Metre
7613.5Road E5400Square Metre
7714Provision for hire charges including pay and allowances of Crews for JCB for clearing the ventway of culverts and clearing on either sides, etc., complete as directed by departmental officers.
7814.1Road A6Hours
7914.2Road B6Hours
8014.3Road C14Hours
8114.4Road D28Hours
8214.5Road E14Hours
8315Painting with synthetic Enamel paint over the existing KM, HM Stones, boundary stones, Guide stones, etc., including cost of paint and labour charges, etc., and other incidental charges and directed by the Engineer.
8415.1Road A37.64Square Metre
8515.2Road B18.92Square Metre
8615.3Road C51.3Square Metre
8715.4Road D90.96Square Metre
8815.5Road E73.57Square Metre
8916Painting with synthetic Enamel paint over the existing iron surfaces, etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers.
9016.1Road A18.09Square Metre
9116.2Road B26.91Square Metre
9216.3Road C26.91Square Metre
9316.4Road D26.91Square Metre
9416.5Road E26.91Square Metre
9517Whitewashing with white cem over the Culvert parapets, etc., including cost of white cem and labour charges, etc., including all other incidental charges as directed by departmental officers.
9617.1Road A50.81Square Metre
9717.2Road B28.8Square Metre
9817.3Road C115.05Square Metre
9917.4Road D84Square Metre
10017.5Road E115.05Square Metre
10118White banding with White cem with Japan Black over the Centre medians, Tree banding, etc., including cost of Japan Black and labour charges, etc., including and other incidental charges and as directed by the Engineer.
10218.1Road A125.35Square Metre
10318.2Road B261.75Square Metre
10418.3Road C99.95Square Metre
10518.4Road D15.62Square Metre
10618.5Road E101.95Square Metre
10719Black banding with Japan Black over the Centre medians, Tree banding, etc., including cost of Japan Black and labour charges, etc., including and other incidental charges and as directed by the Engineer.
10819.1Road A62.68Square Metre
10919.2Road B130.88Square Metre
11019.3Road C49.98Square Metre
11119.4Road D6.16Square Metre
11219.5Road E49.98Square Metre
11320Letterings in KM & HM Stones, Culvert parapets / Bridges and tree numbers including cost of Paint and labour charges and all other incidental charges, etc., complete as directed by departmental Engineer - Lettering 5 to 10 cm.
11420.1Road A475Numbers
11520.2Road B729Numbers
11620.3Road C782Numbers
11720.4Road D1450Numbers
11820.5Road E782Numbers
11921Letterings in KM & HM Stones, Culvert parapets / Bridges and tree numbers including cost of Paint and labour charges and all other incidental charges, etc., complete as directed by departmental Engineer - Lettering 10 to 15 cm.
12021.1Road A10Numbers
12121.2Road B10Numbers
12221.3Road C10Numbers
12321.4Road D20Numbers
12421.5Road E10Numbers
12522Boxing of Earthwork excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drain in accordance with specification and lines grades and cross section shown in drawing or as indicated by the engineer for all other incidental charges etc., complete for foundation of drain.
12622.1Road F770Cubic Metre
12722.2Road G1078Cubic Metre
12823Filling the Stone dust to the required thickness from approved sources to worksite including cost, conveyance and stacking at sites to departmental gauge for premeasurement and labour for laying levelling watering etc., complete for foundation.
12923.1Road F77Cubic Metre
13023.2Road G107.8Cubic Metre
13124Vibarated Cement Concrete of grade M10 Nominal Mix 1:3:6 using 40mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for FOOTINGS- of retaining wall.
13224.1Road F231Cubic Metre
13324.2Road G323.4Cubic Metre
13425Earth work excavation in all classes of soils such as hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavaion back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification for foundation of abutment and wings.
13525.1Road H292.61Cubic Metre
13625.2Road I73.85Cubic Metre
13725.3Road J651.84Cubic Metre
13825.4Road K372.48Cubic Metre
13926Vibrated Plain Cement Concrete M.15. Grade using 40 mm ISS HBG metal including cost and conveyance of all materials to site including formwork and centering, labour charges, transporting and placing in position, compacting, finishing and curing, working at depths, Tools and Plants and incidental charges such as sheeting, shoring and bracing and their subsequent removel etc., complete as per standard specification for footings of abutment and wings - below sill level
14026.1Road F357.7Cubic Metre
14126.2Road G500.78Cubic Metre
14226.3Road H210.23Cubic Metre
14326.4Road I20.12Cubic Metre
14426.5Road J493.64Cubic Metre
14526.6Road K282.08Cubic Metre
14627Vibrated Plain Cement Concrete M.15. Grade using 40 mm ISS HBG metal including cost and conveyance of all materials to site including formwork and centering, labour charges, transporting and placing in position, compacting, finishing and curing, working at depths, Tools and Plants and incidental charges such as sheeting, shoring and bracing and their subsequent removel etc., complete as per standard specification for substructure of abutment and wings - above sill level
14727.1Road F396.1Cubic Metre
14827.2Road G554.53Cubic Metre
14927.3Road H32.82Cubic Metre
15027.4Road I17.63Cubic Metre
15127.5Road J207.9Cubic Metre
15227.6Road K118.8Cubic Metre
15328Vibrated Reinforced Cement Concrete M25 (Design Mix) using 20mm and below ISS hard broken granite metal including cost and conveyance of all materials from approved quarry to worksite including cost of cement which has to be procured by the contractor but excluding cost and fabrication of steel, cost of form work and including labour charges for mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft portable water, working in all depths including hire, running and fuel charges for all tools and plants as per standard specification MORTH Rev. V No.1000,1500,1700, 2200 for bed block and dirt wall
15428.1Road H9.72Cubic Metre
15528.2Road J35.7Cubic Metre
15628.3Road K20.4Cubic Metre
15729Vibrated Reinforced Cement Concrete M25 (Design Mix) using 20mm and below ISS hard broken granite metal including cost and conveyance of all materials from approved quarry to worksite including cost of cement which has to be procured by the contractor but excluding cost and fabrication of steel, cost of form work and including labour charges for mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft portable water, working in all depths including hire, running and fuel charges for all tools and plants as per standard specification MORTH Rev. V No.1000,1500,1700, 2200 for deck slab.
15829.1Road H50.46Cubic Metre
15929.2Road J50.33Cubic Metre
16029.3Road K28.76Cubic Metre
16130Vibrated cement Concrete M30 design mix using ISS size HBG graded metal including cost and conveyance of all materials to worksite and cement at site including all labour charges for ixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges,formwork,cost of premoulded expansion joints and fixing the same in position etc., complete for wearing cost of 75mm uniform thickness over deck slab as per standard specification MORTH Rev. V No. 1000,1500,1700, 2200
16230.1Road H90.24Square Metre
16330.2Road J184.73Square Metre
16430.3Road K105.56Square Metre
16531Supplying and fixing KRAFT PAPER for full width of seating of deck slab and including cost and conveyance to worksite, labour for fixing the same in correct position and all other incidental charges etc., complete.
16631.1Road H12.6Square Metre
16731.2Road J58.8Square Metre
16831.3Road K33.6Square Metre
16932Supply and fabrication of Tor steel grade Fe - 500 steel required for all RCC items of works involved in the schedule including cost of steel, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision for spacing bars, cover blocks and all other incidental charges etc,complete as per MORTH Rev. V Specification No.1009,1600
17032.1Road H3.677Metric Ton
17132.2Road J6.44Metric Ton
17232.3Road K3.68Metric Ton
17333Supplying and fixing 300mm wide PVC EXPANSION JOINT in the 20mm expansion gap provided in between decks over piers and in between deck and dirt wall over abutment as shown in the drawing including cost and conveyance of expansion joints including shalimar pad and joint sealant etc., complete.
17433.1Road H30Running Metre
17533.2Road J140Running Metre
17633.3Road K80Running Metre
17734Providing and fixing PVC Seepage Pipes of 110mm dia at 1.0m c/c staggered of required lengths for abutments and return walls including cost and conveyance of all materials to work site and labour charges for fixing etc, complete to drain of the backfill as per MORTH Rev. V Specification Nos.2706
17834.1Road F140Number
17934.2Road G196Number
18034.3Road H40Number
18134.4Road J196Number
18234.5Road K112Number
18335Providing gravel soling in layers including cost of conveyance of gritty gravel from approved sources to work site and steaking to deptl gauge for pre measurements of labour for laying in layers, watering & consolidation by power roller rolling and all other incidental charges etc., complete for diversion road.
18435.1Road J770Cubic Metre
18535.2Road K330Cubic Metre
18636Supply and fixing of RCC pipes 1000 mm dia NP4 class IV including cost and conveyance to work site to proper gradient including all labour charges and all other incidental charges etc., complete as per MORTH Rev.V Specification No.2900
18736.1Road I20Running Meter
18837Laying Reinforced cement concrete pipe 1000mm dia NP3 / Prestressed concrete pipe for culverts of first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets.
18937.1Road I20Running Meter
19038Filling with US Gravel including cost and conveyance of gravel to worksite laying handling charges and filling in layers tamering to optimum mositure content to get the maximum density including watering with a lead and all other incidental charges etc. complete.
19138.1Road I15.24Cubic Metre
19239Refilling with excavated soil including removal and satisfactory disposal of all materials necessary for the construction of road way and side drain in accordance with specification and the lines grades and cross section shown in drawing or as indicated by the engineer for all other incidental charges etc., complete for Berms as per MORTH Rev.V Specification No.111,112,301,305
19339.1Road F1074.15Cubic Metre
19439.2Road G1503.81Cubic Metre
19540Upkeeping of Roads for 1st Year Forming and raising the Berms with carted earth with a lead of 5 km from the approved source to work site including cost of earth, conveyance charges and filling levelling to the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for making up the berms
19640.1Road A108Cubic Metre
19740.2Road B54Cubic Metre
19840.3Road C153Cubic Metre
19940.4Road D114Cubic Metre
20040.5Road E114Cubic Metre
20141Earthwork Excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross section shown in the drawings or as directed by the Engineer for the Earthern Drain
20241.1Road C300Cubic Metre
20341.2Road D270Cubic Metre
20441.3Road E480Cubic Metre
20542Clearing the light jungle with uprooting including labour charges and all other incidental charges, etc., complete as per standard specification.
20642.1Road A3240Square Metre
20742.2Road B1800Square Metre
20842.3Road C4680Square Metre
20942.4Road D17280Square Metre
21042.5Road E10800Square Metre
21143Provision for hire charges including pay and allowances of Crews for JCB for clearing the ventway of culverts and clearing on either sides, etc., complete as directed by departmental officers.
21243.1Road A6Hours
21343.2Road B6Hours
21443.3Road C14Hours
21543.4Road D28Hours
21643.5Road E14Hours
21744Painting with synthetic Enamel paint over the existing KM, HM Stones, boundary stones, Guide stones, etc., including cost of paint and labour charges, etc., and other incidental charges and directed by the Engineer.
21844.1Road A37.64Square Metre
21944.2Road B18.92Square Metre
22044.3Road C51.3Square Metre
22144.4Road D66.1Square Metre
22244.5Road E56.02Square Metre
22345Painting with synthetic Enamel paint over the existing iron surfaces, etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers.
22445.1Road A18.09Square Metre
22545.2Road B26.91Square Metre
22645.3Road C26.91Square Metre
22745.4Road D26.91Square Metre
22845.5Road E26.91Square Metre
22946Whitewashing with white cem over the Culvert parapets, etc., including cost of white cem and labour charges, etc., including all other incidental charges as directed by departmental officers.
23046.1Road A50.81Square Metre
23146.2Road B28.8Square Metre
23246.3Road C115.05Square Metre
23346.4Road D84Square Metre
23446.5Road E115.05Square Metre
23547White banding with White cem with Japan Black over the Centre medians, Tree banding, etc., including cost of Japan Black and labour charges, etc., including and other incidental charges and as directed by the Engineer.
23647.1Road A125.35Square Metre
23747.2Road B261.75Square Metre
23847.3Road C99.95Square Metre
23947.4Road D15.62Square Metre
24047.5Road E103.95Square Metre
24148Black banding with Japan Black over the Centre medians, Tree banding, etc., including cost of Japan Black and labour charges, etc., including and other incidental charges and as directed by the Engineer.
24248.1Road A62.68Square Metre
24348.2Road B130.88Square Metre
24448.3Road C49.98Square Metre
24548.4Road D7.81Square Metre
24648.5Road E51.98Square Metre
24749Letterings in KM & HM Stones, Culvert parapets / Bridges and tree numbers including cost of Paint and labour charges and all other incidental charges, etc., complete as directed by departmental Engineer - Lettering 5 to 10 cm.
24849.1Road A475Square Metre
24949.2Road B729Square Metre
25049.3Road C782Square Metre
25149.4Road D1420Square Metre
25249.5Road E794Square Metre
25350Letterings in KM & HM Stones, Culvert parapets / Bridges and tree numbers including cost of Paint and labour charges and all other incidental charges, etc., complete as directed by departmental Engineer - Lettering 10 to 15 cm.
25450.1Road A10Square Metre
25550.2Road B10Square Metre
25650.3Road C10Square Metre
25750.4Road D20Square Metre
25850.5Road E10Square Metre
25951Upkeeping of Roads for 2nd Year Forming and raising the Berms with carted earth with a lead of 5 km from the approved source to work site including cost of earth, conveyance charges and filling levelling to the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for making up the berms
26051.1Road A108Cubic Metre
26151.2Road B54Cubic Metre
26251.3Road C153Cubic Metre
26351.4Road D114Cubic Metre
26451.5Road E114Cubic Metre
26552Earthwork Excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross section shown in the drawings or as directed by the Engineer for the Earthern Drain
26652.1Road C300Cubic Metre
26752.2Road D270Cubic Metre
26852.3Road E480Cubic Metre
26953Clearing the light jungle with uprooting including labour charges and all other incidental charges, etc., complete as per standard specification.
27053.1Road A3240Square Metre
27153.2Road B1800Square Metre
27253.3Road C4680Square Metre
27353.4Road D17280Square Metre
27453.5Road E10800Square Metre
27554Provision for hire charges including pay and allowances of Crews for JCB for clearing the ventway of culverts and clearing on either sides, etc., complete as directed by departmental officers.
27654.1Road A6Hours
27754.2Road B6Hours
27854.3Road C14Hours
27954.4Road D28Hours
28054.5Road E14Hours
28155Painting with synthetic Enamel paint over the existing KM, HM Stones, boundary stones, Guide stones, etc., including cost of paint and labour charges, etc., and other incidental charges and directed by the Engineer.
28255.1Road A37.64Square Metre
28355.2Road B18.92Square Metre
28455.3Road C51.3Square Metre
28555.4Road D66.1Square Metre
28655.5Road E56.02Square Metre
28756Painting with synthetic Enamel paint over the existing iron surfaces, etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers.
28856.1Road A18.09Square Metre
28956.2Road B26.91Square Metre
29056.3Road C26.91Square Metre
29156.4Road D26.91Square Metre
29256.5Road E26.91Square Metre
29357Whitewashing with white cem over the Culvert parapets, etc., including cost of white cem and labour charges, etc., including all other incidental charges as directed by departmental officers.
29457.1Road A50.81Square Metre
29557.2Road B28.8Square Metre
29657.3Road C115.05Square Metre
29757.4Road D84Square Metre
29857.5Road E115.05Square Metre
29958White banding with White cem with Japan Black over the Centre medians, Tree banding, etc., including cost of Japan Black and labour charges, etc., including and other incidental charges and as directed by the Engineer.
30058.1Road A125.35Square Metre
30158.2Road B261.75Square Metre
30258.3Road C99.95Square Metre
30358.4Road D15.62Square Metre
30458.5Road E103.95Square Metre
30559Black banding with Japan Black over the Centre medians, Tree banding, etc., including cost of Japan Black and labour charges, etc., including and other incidental charges and as directed by the Engineer.
30659.1Road A62.68Square Metre
30759.2Road B130.88Square Metre
30859.3Road C49.98Square Metre
30959.4Road D7.81Square Metre
31059.5Road E51.98Square Metre
31160Letterings in KM & HM Stones, Culvert parapets / Bridges and tree numbers including cost of Paint and labour charges and all other incidental charges, etc., complete as directed by departmental Engineer - Lettering 5 to 10 cm.
31260.1Road A475Square Metre
31360.2Road B729Square Metre
31460.3Road C782Square Metre
31560.4Road D1420Square Metre
31660.5Road E794Square Metre
31761Letterings in KM & HM Stones, Culvert parapets / Bridges and tree numbers including cost of Paint and labour charges and all other incidental charges, etc., complete as directed by departmental Engineer - Lettering 10 to 15 cm.
31861.1Road A10Square Metre
31961.2Road B10Square Metre
32061.3Road C10Square Metre
32161.4Road D20Square Metre
32261.5Road E10Square Metre
32362Upkeeping of Roads for 3rd Year Forming and raising the Berms with carted earth with a lead of 5 km from the approved source to work site including cost of earth, conveyance charges and filling levelling to the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for making up the berms
32462.1Road A108Cubic Metre
32562.2Road B54Cubic Metre
32662.3Road C153Cubic Metre
32762.4Road D114Cubic Metre
32862.5Road E114Cubic Metre
32963Earthwork Excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross section shown in the drawings or as directed by the Engineer for the Earthern Drain
33063.1Road C300Cubic Metre
33163.2Road D270Cubic Metre
33263.3Road E480Cubic Metre
33364Clearing the light jungle with uprooting including labour charges and all other incidental charges, etc., complete as per standard specification.
33464.1Road A3240Square Metre
33564.2Road B1800Square Metre
33664.3Road C4680Square Metre
33764.4Road D17280Square Metre
33864.5Road E10800Square Metre
33965Provision for hire charges including pay and allowances of Crews for JCB for clearing the ventway of culverts and clearing on either sides, etc., complete as directed by departmental officers.
34065.1Road A6Hours
34165.2Road B6Hours
34265.3Road C14Hours
34365.4Road D28Hours
34465.5Road E14Hours
34566Painting with synthetic Enamel paint over the existing KM, HM Stones, boundary stones, Guide stones, etc., including cost of paint and labour charges, etc., and other incidental charges and directed by the Engineer.
34666.1Road A37.64Square Metre
34766.2Road B18.92Square Metre
34866.3Road C51.3Square Metre
34966.4Road D66.1Square Metre
35066.5Road E56.02Square Metre
35167Painting with synthetic Enamel paint over the existing iron surfaces, etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers.
35267.1Road A18.09Square Metre
35367.2Road B26.91Square Metre
35467.3Road C26.91Square Metre
35567.4Road D26.91Square Metre
35667.5Road E26.91Square Metre
35768Whitewashing with white cem over the Culvert parapets, etc., including cost of white cem and labour charges, etc., including all other incidental charges as directed by departmental officers.
35868.1Road A50.81Square Metre
35968.2Road B28.8Square Metre
36068.3Road C115.05Square Metre
36168.4Road D84Square Metre
36268.5Road E115.05Square Metre
36369White banding with White cem with Japan Black over the Centre medians, Tree banding, etc., including cost of Japan Black and labour charges, etc., including and other incidental charges and as directed by the Engineer.
36469.1Road A125.35Square Metre
36569.2Road B261.75Square Metre
36669.3Road C99.95Square Metre
36769.4Road D15.62Square Metre
36869.5Road E103.95Square Metre
36970Black banding with Japan Black over the Centre medians, Tree banding, etc., including cost of Japan Black and labour charges, etc., including and other incidental charges and as directed by the Engineer.
37070.1Road A62.68Square Metre
37170.2Road B130.88Square Metre
37270.3Road C49.98Square Metre
37370.4Road D7.81Square Metre
37470.5Road E51.98Square Metre
37571Letterings in KM & HM Stones, Culvert parapets / Bridges and tree numbers including cost of Paint and labour charges and all other incidental charges, etc., complete as directed by departmental Engineer - Lettering 5 to 10 cm.
37671.1Road A475Square Metre
37771.2Road B729Square Metre
37871.3Road C782Square Metre
37971.4Road D1420Square Metre
38071.5Road E794Square Metre
38172Letterings in KM & HM Stones, Culvert parapets / Bridges and tree numbers including cost of Paint and labour charges and all other incidental charges, etc., complete as directed by departmental Engineer - Lettering 10 to 15 cm.
38272.1Road A10Square Metre
38372.2Road B10Square Metre
38472.3Road C10Square Metre
38572.4Road D20Square Metre
38672.5Road E10Square Metre
38773Upkeeping of Roads for 4th Year Forming and raising the Berms with carted earth with a lead of 5 km from the approved source to work site including cost of earth, conveyance charges and filling levelling to the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for making up the berms
38873.1Road A108Cubic Metre
38973.2Road B54Cubic Metre
39073.3Road C153Cubic Metre
39173.4Road D114Cubic Metre
39273.5Road E114Cubic Metre
39374Earthwork Excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross section shown in the drawings or as directed by the Engineer for the Earthern Drain
39474.1Road C300Cubic Metre
39574.2Road D270Cubic Metre
39674.3Road E480Cubic Metre
39775Clearing the light jungle with uprooting including labour charges and all other incidental charges, etc., complete as per standard specification.
39875.1Road A3240Square Metre
39975.2Road B1800Square Metre
40075.3Road C4680Square Metre
40175.4Road D17280Square Metre
40275.5Road E10800Square Metre
40376Provision for hire charges including pay and allowances of Crews for JCB for clearing the ventway of culverts and clearing on either sides, etc., complete as directed by departmental officers.
40476.1Road A6Hours
40576.2Road B6Hours
40676.3Road C14Hours
40776.4Road D28Hours
40876.5Road E14Hours
40977Painting with synthetic Enamel paint over the existing KM, HM Stones, boundary stones, Guide stones, etc., including cost of paint and labour charges, etc., and other incidental charges and directed by the Engineer.
41077.1Road A37.64Square Metre
41177.2Road B18.92Square Metre
41277.3Road C51.3Square Metre
41377.4Road D66.1Square Metre
41477.5Road E56.02Square Metre
41578Painting with synthetic Enamel paint over the existing iron surfaces, etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers.
41678.1Road A18.09Square Metre
41778.2Road B26.91Square Metre
41878.3Road C26.91Square Metre
41978.4Road D26.91Square Metre
42078.5Road E26.91Square Metre
42179Whitewashing with white cem over the Culvert parapets, etc., including cost of white cem and labour charges, etc., including all other incidental charges as directed by departmental officers.
42279.1Road A50.81Square Metre
42379.2Road B28.8Square Metre
42479.3Road C115.05Square Metre
42579.4Road D153.6Square Metre
42679.5Road E115.05Square Metre
42780White banding with White cem with Japan Black over the Centre medians, Tree banding, etc., including cost of Japan Black and labour charges, etc., including and other incidental charges and as directed by the Engineer.
42880.1Road A125.35Square Metre
42980.2Road B261.75Square Metre
43080.3Road C99.95Square Metre
43180.4Road D12.32Square Metre
43280.5Road E103.95Square Metre
43381Black banding with Japan Black over the Centre medians, Tree banding, etc., including cost of Japan Black and labour charges, etc., including and other incidental charges and as directed by the Engineer.
43481.1Road A62.68Square Metre
43581.2Road B130.88Square Metre
43681.3Road C49.98Square Metre
43781.4Road D6.16Square Metre
43881.5Road E51.98Square Metre
43982Letterings in KM & HM Stones, Culvert parapets / Bridges and tree numbers including cost of Paint and labour charges and all other incidental charges, etc., complete as directed by departmental Engineer - Lettering 5 to 10 cm.
44082.1Road A475Square Metre
44182.2Road B729Square Metre
44282.3Road C782Square Metre
44382.4Road D1420Square Metre
44482.5Road E794Square Metre
44583Letterings in KM & HM Stones, Culvert parapets / Bridges and tree numbers including cost of Paint and labour charges and all other incidental charges, etc., complete as directed by departmental Engineer - Lettering 10 to 15 cm.
44683.1Road A10Square Metre
44783.2Road B10Square Metre
44883.3Road C10Square Metre
44983.4Road D20Square Metre
45083.5Road E10Square Metre
45184Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the bituminous surface cleaned with mechanical broom and high pressure air jet,or other means as directed by the Engineer.As per clause 503 - over bituminous surfaces
45284.1Road A346.77Square Metre
45384.2Road B330Square Metre
45484.3Road C292.5Square Metre
45584.4Road D540Square Metre
45684.5Road E337.5Square Metre
45785Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade - 30) at percentage specified by JMF of mix and filler, transporting the hot mix to work site, to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects) - Grading II
45885.1Road A10.4Cubic Metre
45985.2Road B9.9Cubic Metre
46085.3Road C8.78Cubic Metre
46185.4Road D16.2Cubic Metre
46285.5Road E10.13Cubic Metre
46386Upkeeping of Roads for 5th Year Forming and raising the Berms with carted earth with a lead of 5 km from the approved source to work site including cost of earth, conveyance charges and filling levelling to the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for making up the berms
46486.1Road A108Cubic Metre
46586.2Road B54Cubic Metre
46686.3Road C153Cubic Metre
46786.4Road D114Cubic Metre
46886.5Road E114Cubic Metre
46987Earthwork Excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross section shown in the drawings or as directed by the Engineer for the Earthern Drain
47087.1Road C300Cubic Metre
47187.2Road D270Cubic Metre
47287.3Road E480Cubic Metre
47388Clearing the light jungle with uprooting including labour charges and all other incidental charges, etc., complete as per standard specification.
47488.1Road A3240Square Metre
47588.2Road B1800Square Metre
47688.3Road C4680Square Metre
47788.4Road D17280Square Metre
47888.5Road E10800Square Metre
47989Provision for hire charges including pay and allowances of Crews for JCB for clearing the ventway of culverts and clearing on either sides, etc., complete as directed by departmental officers.
48089.1Road A6Hours
48189.2Road B6Hours
48289.3Road C14Hours
48389.4Road D28Hours
48489.5Road E14Hours
48590Painting with synthetic Enamel paint over the existing KM, HM Stones, boundary stones, Guide stones, etc., including cost of paint and labour charges, etc., and other incidental charges and directed by the Engineer.
48690.1Road A37.64Square Metre
48790.2Road B18.92Square Metre
48890.3Road C51.3Square Metre
48990.4Road D66.1Square Metre
49090.5Road E56.02Square Metre
49191Painting with synthetic Enamel paint over the existing iron surfaces, etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers.
49291.1Road A18.09Square Metre
49391.2Road B26.91Square Metre
49491.3Road C26.91Square Metre
49591.4Road D26.91Square Metre
49691.5Road E26.91Square Metre
49792Whitewashing with white cem over the Culvert parapets, etc., including cost of white cem and labour charges, etc., including all other incidental charges as directed by departmental officers.
49892.1Road A50.81Square Metre
49992.2Road B28.8Square Metre
50092.3Road C115.05Square Metre
50192.4Road D84Square Metre
50292.5Road E115.05Square Metre
50393White banding with White cem with Japan Black over the Centre medians, Tree banding, etc., including cost of Japan Black and labour charges, etc., including and other incidental charges and as directed by the Engineer.
50493.1Road A125.35Square Metre
50593.2Road B261.75Square Metre
50693.3Road C99.95Square Metre
50793.4Road D15.62Square Metre
50893.5Road E103.95Square Metre
50994Black banding with Japan Black over the Centre medians, Tree banding, etc., including cost of Japan Black and labour charges, etc., including and other incidental charges and as directed by the Engineer.
51094.1Road A62.68Square Metre
51194.2Road B130.88Square Metre
51294.3Road C49.98Square Metre
51394.4Road D7.81Square Metre
51494.5Road E51.98Square Metre
51595Letterings in KM & HM Stones, Culvert parapets / Bridges and tree numbers including cost of Paint and labour charges and all other incidental charges, etc., complete as directed by departmental Engineer - Lettering 5 to 10 cm.
51695.1Road A475Square Metre
51795.2Road B729Square Metre
51895.3Road C782Square Metre
51995.4Road D1420Square Metre
52095.5Road E794Square Metre
52196Letterings in KM & HM Stones, Culvert parapets / Bridges and tree numbers including cost of Paint and labour charges and all other incidental charges, etc., complete as directed by departmental Engineer - Lettering 10 to 15 cm.
52296.1Road A10Square Metre
52396.2Road B10Square Metre
52496.3Road C10Square Metre
52596.4Road D20Square Metre
52696.5Road E10Square Metre
52797Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the bituminous surface cleaned with mechanical broom and high pressure air jet,or other means as directed by the Engineer.As per clause 503 - over bituminous surfaces
52897.1Road A577.95Square Metre
52997.2Road B550Square Metre
53097.3Road C487.5Square Metre
53197.4Road D900Square Metre
53297.5Road E562.5Square Metre
53398Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade - 30) at percentage specified by JMF of mix and filler, transporting the hot mix to work site, to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects) - Grading II
53498.1Road A17.34Cubic Metre
53598.2Road B16.5Cubic Metre
53698.3Road C14.63Cubic Metre
53798.4Road D27Cubic Metre
53898.5Road E16.88Cubic Metre
53999Calculation of SubTotal, GST and Total Amount carried out by system automatically
54099.1Basic cost of value put to tender as per estimate1(A)
54199.2Add GST at 12%1(B)
54299.3Total Value put to Tender1(A+B)
54399.4Quoted value1(D)
54499.5Final Quoted Value1(E)
54599.6Add GST at 12% of Final Quoted Value1(F)
54699.7Total Value of Contract Including 12% of GST1(E+F)

AI Tender Summary

OUR REF NO 21820676
AUTHORITY Government Departments
TENDER VALUE 7.06 Crore
LAST DATE 16-10-2019
Authority
Authority Name Highways Department
Work Description Improvement Works, Construction Of Culvert And Retaining Wall Works Including Upkeeping In Chengam ( H ) C&M Sub Division Jurisdictiona ) Improvements Of Chengam - Kuppanatham Road At Km 1 / 2 - 3 / 0 Including Upkeeping For A Period Of 60 Months ( 01-Cridp-19- 20-P-3586 ) B ) Improvements Of Chengam - Kuppanatham Road At Km 3 / 0 - 5 / 0 Including Upkeeping For A Period Of 60 Months ( 01-Cridp-19- 20-P-3587 ) C ) Improvements To Riding Quality At Km 0 / 0 - 2 / 6 Of Pondy - Krishnagiri Road To Paliyapattu Road Including Upkeeping For A Period Of 60 Months ( 01-Cridp-19-20-I-3969 ) D ) Improvements To Riding Quality At Km 0 / 0 - 4 / 8 Of Kayampattu Theethandapattu H / C Road ( Via ) Valayampattu Including Upkeeping For A Period Of 60 Months ( 01-Cridp-19-20-I-3994 ) E ) Improvements To Riding Quality At Km 0 / 0 - 1 / 6 & 0 / 0 - 1 / 4 Of Polur Chengam Road To Pudur Chengam Road, Joint Ammapalayam - Pudupalayam Road ( Road A ) Including Upkeeping For A Period Of 60 Months ( 01-Cridp-19-20-I-3995 ) F ) Construction Of Retaining Wall At Km 0 / 0 - 0 / 4 Of Polur - Chengam Road To Kolanthangal Road ( 01-Cridp-19-20-O-2093 ) G ) Construction Of Retaining Wall At Km 3 / 2 & 4 / 2 - 5 / 0 Of Polur - Chengam Road To Pondy Krishnagiri Road ( Via ) Chennasamudiram ( 01-Cridp-19-20-O-2094 ) H ) Reconstruction Of Rcc Slab Culvert At Km 140 / 8 Of Pondy Krishnagiri Road ( Nh 66 Abandoned Stretch ) ( Sh ) ( 01-Cridp-19-20-S-0169 ) I ) Reconstruction Of Pipe Culvert At Km 5 / 10 Of Chengam - Kuppanatham Road ( 01-Cridp-19-20-O-2063 ) J ) Reconstruction Of Rcc Slab Culvert At Km 0 / 2, 1 / 2, 1 / 4, 0 / 2 ( I ) ( Ii ) , 0 / 8, 0 / 10 Of Polur - Chengam Road To Pudur - Chengam Road Joint Ammapalayam Pudupalayam Road ( Road A ) ( 01-Cridp-19-20-O-2079 ) K ) Reconstruction Of Rcc Slab Culvert At Km 0 / 4, 0 / 10, 2 / 6 ( I ) , ( Ii ) Of Kayampattu Theethandapattu H / C Road ( Via ) Valayampattu ( 01-Cridp-19-20-O-2085 )
Basic Detail
Tender No package 98 / 2019-20
Bidding Type Tender
Location
City Chengam
State Tamil Nadu
Key Dates
Publish Date 16 Sep 2019
Submission Date 16 Oct 2019
Open Date 18 Oct 2019
Finance
Tender Value 7.06 Crore
Tender Fee Ref. Documents
EMD 3.64 Lakhs
Exemption Not Available
Document List
PQP98.pdf
BOQ_166373.xls
Tendernotice_1.pdf
PricebidP98.pdf
2DBB9F99-7E95-4F93-9475-56AE2767DA82.html

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 16, 2019
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 16, 2019
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Oct 18, 2019

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
pdf

PQP98.pdf

xls

BOQ_166373.xls

pdf

Tendernotice_1.pdf

pdf

PricebidP98.pdf

html

2DBB9F99-7E95-4F93-9475-56AE2767DA82.html

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders