Shri Saibaba Sansthan Trust has published Supply ,Installation And Commissioning Of New Central A.C. Plant With Laminar Flow On Turnkey Basis .. Submission Date for this Tender is 30-09-2019. Electrical Maintenance Tenders in Shirdi Maharashtra. Bidders can get complete Tender details and download the document.
Name of Work: Supply ,Installation and Commissioning of New Central A.C. Plant with Laminar Flow on Turnkey Basis . | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | General OT - - 1 | a1 | ||
2 | 1.01 | Bio air conditioning HVAC system for OT (with AHU Air Distribustion system , Piping , condensing Unit, Dampers, Risers etc. ) | a2 | 1 | Nos |
3 | 1.02 | Laminar air flow system | a3 | 1 | Nos |
4 | 1.03 | Electrical work | a4 | 1 | Nos |
5 | 1.04 | Metal false ceilling | a5 | 1 | As per room size |
6 | 1.05 | Peripheral lighting | a6 | 1 | As per room size |
7 | 1.06 | Miscellaneous work and dismantling old plant, false ceiling. | a7 | 1 | Nos |
8 | 2 | General OT - - 2 | a8 | ||
9 | 2.01 | Bio air conditioning HVAC system for OT (with AHU Air Distribustion system , Piping , condensing Unit, Dampers, Risers etc. ) | a9 | 1 | Nos |
10 | 2.02 | Laminar air flow system | a10 | 1 | Nos |
11 | 2.03 | Electrical work | a11 | 1 | Nos |
12 | 2.04 | Metal false ceilling | a12 | 1 | As per room size |
13 | 2.05 | Peripheral lighting | a13 | 1 | As per room size |
14 | 2.06 | Miscellaneous work and dismantling old plant, false ceiling. | a14 | 1 | Nos |
15 | 3 | Ortho OT | a15 | ||
16 | 3.01 | Bio air conditioning HVAC system for OT (with AHU Air Distribustion system , Piping , condensing Unit, Dampers, Risers etc. ) | a16 | 1 | Nos |
17 | 3.02 | Laminar air flow system | a17 | 1 | Nos |
18 | 3.03 | Electrical work | a18 | 1 | Nos |
19 | 3.04 | Metal false ceilling | a19 | 1 | As per room size |
20 | 3.05 | Peripheral lighting | a20 | 1 | As per room size |
21 | 3.06 | Miscellaneous work and dismantling old plant, false ceiling. | a21 | 1 | Nos |
22 | 4 | Neuro OT - I | a22 | ||
23 | 4.01 | Bio air conditioning HVAC system for OT (with AHU Air Distribustion system , Piping , condensing Unit, Dampers, Risers etc. ) | a23 | 1 | Nos |
24 | 4.02 | Laminar air flow system | a24 | 1 | Nos |
25 | 4.03 | Electrical work | a25 | 1 | Nos |
26 | 4.04 | Metal false ceilling | a26 | 1 | As per room size |
27 | 4.05 | Peripheral lighting | a27 | 1 | As per room size |
28 | 4.06 | Miscellaneous work and dismantling old plant, false ceiling. | a28 | 1 | Nos |
29 | 5 | Neuro OT - II | a29 | ||
30 | 5.01 | Bio air conditioning HVAC system for OT (with AHU Air Distribustion system , Piping , condensing Unit, Dampers, Risers etc. ) | a30 | 1 | Nos |
31 | 5.02 | Laminar air flow system | a31 | 1 | Nos |
32 | 5.03 | Electrical work | a32 | 1 | Nos |
33 | 5.04 | Metal false ceilling | a33 | 1 | As per room size |
34 | 5.05 | Peripheral lighting | a34 | 1 | As per room size |
35 | 5.06 | Miscellaneous work and dismantling old plant, false ceiling. | a35 | 1 | Nos |
36 | 6 | Neuro Recovery Ward | a36 | ||
37 | 6.01 | Bio air conditioning HVAC system for OT (with AHU Air Distribustion system , Piping , condensing Unit, Dampers, Risers etc. ) | a37 | 1 | Nos |
38 | 6.02 | Laminar air flow system | a38 | 1 | Nos |
39 | 6.03 | Electrical work | a39 | 1 | Nos |
40 | 6.04 | Metal false ceilling | a40 | 1 | As per room size |
41 | 6.05 | Peripheral lighting | a41 | 1 | As per room size |
42 | 6.06 | Miscellaneous work and dismantling old plant, false ceiling. | a42 | 1 | Nos |
43 | 7 | Neuro Passage | a43 | ||
44 | 7.01 | Bio air conditioning HVAC system for OT (with AHU Air Distribustion system , Piping , condensing Unit, Dampers, Risers etc. ) | a44 | 1 | Nos |
45 | 7.02 | Laminar air flow system | a45 | 1 | Nos |
46 | 7.03 | Electrical work | a46 | 1 | Nos |
47 | 7.04 | Metal false ceilling | a47 | 1 | As per room size |
48 | 7.05 | Peripheral lighting | a48 | 1 | As per room size |
49 | 7.06 | Miscellaneous work and dismantling old plant, false ceiling. | a49 | 1 | Nos |
50 | 8 | ICCU Ward | a50 | ||
51 | 8.01 | Bio air conditioning HVAC system (with AHU Air Distribustion system , Piping , condensing Unit, Dampers, Risers etc. ) | a51 | 1 | Nos |
52 | 8.02 | Laminar air flow system | a52 | 1 | Nos |
53 | 8.03 | Electrical work | a53 | 1 | Nos |
54 | 8.04 | Metal false ceilling | a54 | 1 | As per room size |
55 | 8.05 | Peripheral lighting | a55 | 1 | As per room size |
56 | 8.06 | Miscellaneous work and dismantling old plant, false ceiling. | a56 | 1 | Nos |
57 | 9 | GICU Ward | a57 | ||
58 | 9.01 | Bio air conditioning HVAC system (with AHU Air Distribustion system , Piping , condensing Unit, Dampers, Risers etc. ) | a58 | 1 | Nos |
59 | 9.02 | Laminar air flow system | a59 | 1 | Nos |
60 | 9.03 | Electrical work | a60 | 1 | Nos |
61 | 9.04 | Metal false ceilling | a61 | 1 | As per room size |
62 | 9.05 | Peripheral lighting | a62 | 1 | As per room size |
63 | 9.06 | Miscellaneous work and dismantling old plant, false ceiling. | a63 | 1 | Nos |
64 | 10 | CRU- III cardiac ward | a64 | ||
65 | 10.01 | Bio air conditioning HVAC system (with AHU Air Distribustion system , Piping , condensing Unit, Dampers, Risers etc. ) | a65 | 1 | Nos |
66 | 10.02 | Laminar air flow system | a66 | 1 | Nos |
67 | 10.03 | Electrical work | a67 | 1 | Nos |
68 | 10.04 | Metal false ceilling | a68 | 1 | As per room size |
69 | 10.05 | Peripheral lighting | a69 | 1 | As per room size |
70 | 10.06 | Miscellaneous work and dismantling old plant false ceiling. | a70 | 1 | Nos |
71 | 11 | CVTS OT -1 | a71 | ||
72 | 11.01 | Bio air conditioning HVAC system (with AHU Air Distribustion system , Piping , condensing Unit, Dampers, Risers etc. ) | a72 | 1 | Nos |
73 | 11.02 | Laminar air flow system | a73 | 1 | Nos |
74 | 11.03 | Electrical work | a74 | 1 | Nos |
75 | 11.04 | Metal false ceilling | a75 | 1 | As per room size |
76 | 11.05 | Peripheral lighting | a76 | 1 | As per room size |
77 | 11.06 | Miscellaneous work and dismantling old plant, false ceiling. | a77 | 1 | Nos |
78 | 12 | CVTS OT -2 | a78 | ||
79 | 12.01 | Bio air conditioning HVAC system (with AHU Air Distribustion system , Piping , condensing Unit, Dampers, Risers etc. ) | a79 | 1 | Nos |
80 | 12.02 | Laminar air flow system | a80 | 1 | Nos |
81 | 12.03 | Electrical work | a81 | 1 | Nos |
82 | 12.04 | Metal false ceilling | a82 | 1 | As per room size |
83 | 12.05 | Peripheral lighting | a83 | 1 | As per room size |
84 | 12.06 | Miscellaneous work and dismantling old plant, false ceiling. | a84 | 1 | Nos |
85 | 13 | CVTS OT Passage | a85 | ||
86 | 13.01 | Bio air conditioning HVAC system (with AHU Air Distribustion system , Piping , condensing Unit, Dampers, Risers etc. ) | a86 | 1 | Nos |
87 | 13.02 | Laminar air flow system | a87 | 1 | Nos |
88 | 13.03 | Electrical work | a88 | 1 | Nos |
89 | 13.04 | Metal false ceilling | a89 | 1 | As per room size |
90 | 13.05 | Peripheral lighting | a90 | 1 | As per room size |
91 | 13.06 | Miscellaneous work and dismantling old plant, false ceiling. | a91 | 1 | Nos |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail