| 1 | 1 | shifting of empty barrels anywhere inside the terminal premises through out the month | itemcode 6 | 12 | SU |
|---|
| 2 | 2 | Loading of barrels through out the month by hand pump (arranged by contractor), as per instruction of Officer | itemcode 7 | 12 | SU |
|---|
| 3 | 3 | unloading of barrels at Tank Wagon sump , including collection of oil , handing / shifting of barrels, as per instruction of officer through out the month | itemcode 8 | 12 | SU |
|---|
| 4 | 4 | shifting and unloading of loaded barrels in the main pump house sump from any where inside the terminal premises. | itemcode 9 | 12 | SU |
|---|
| 5 | 5 | shifting of loaded barrels from any where inside the terminal to TLF sump/TW Sump / Main pump house sump. | itemcode 10 | 12 | SU |
|---|
| 6 | 6 | unloading of loaded barrels at main/booster pump house / TLF sump. | itemcode 11 | 12 | SU |
|---|
| 7 | 7 | Opening and closing of dyke valves including maintaining records for dyke valve indicators system | itemcode 12 | 12 | SU |
|---|
| 8 | 8 | cleaning/ maintenance of ROSOV & DBBV at any place inside the Terminal throughout the month | itemcode 13 | 12 | Nos |
|---|
| 9 | 9 | connection of loading/unloading hose at TW / any other place inside the terminal. Including assistance in T/W decantation work, through out the month. Assistance to be given until TW operations gets completed. | itemcode 14 | 12 | SU |
|---|
| 10 | 10 | shifting of rejected hose from anywhere inside the terminal to scrap yard . | itemcode 15 | 100 | Nos |
|---|
| 11 | 11 | Testing , checking of Sprikler line of product tanks,cleaning of stariners including line strainers, Cleaning / changing of nozzle of sprikler, tesing of foam pourer system of tanks after making arrangemet and then reinstate the foam pourer system & cleaning of strainer of foam line for full functionality as advised by Officer.( unit will be counted as no of tanks tested & serviced for complete sprikler & foam line) through out the month. | itemcode 16 | 240 | Nos |
|---|
| 12 | 12 | Restacking of hose pipe as and when required through out the month as per instruction of concerened officer. | itemcode 17 | 12 | SU |
|---|
| 13 | 13 | shifting of loading/unloading hoses from store to maintenance site as per instruction of Officer through out the month | itemcode 18 | 12 | Nos |
|---|
| 14 | 14 | connection/disconnection of 3 inch Ball/ Gate valves at TLF/TW/any place inside the terminal. | itemcode 19 | 50 | Nos |
|---|
| 15 | 15 | connection/disconnection of gate valves/ROSOV/DBBV/MOV at any place inside the terminal. | itemcode 20 | 120 | Nos |
|---|
| 16 | 16 | Connection/disconnection of bends over 8\" dia. | itemcode 21 | 100 | Nos |
|---|
| 17 | 17 | Connection/disconnection of bends upto 8\" dia. | itemcode 22 | 100 | Nos |
|---|
| 18 | 18 | connection/disconnection of spool piece irrespective of sizes | itemcode 23 | 180 | Nos |
|---|
| 19 | 19 | connection/disconnection of gate valves at any place inside the terminal. | itemcode 24 | 120 | Nos |
|---|
| 20 | 20 | Dewatering and cleaning of roof of floating roof tanks all complete . | itemcode 25 | 72 | Nos |
|---|
| 21 | 21 | Fixing of roof support legs of floating tanks at different height. | itemcode 26 | 240 | Nos |
|---|
| 22 | 22 | Fixing of check nut in gate valve | itemcode 27 | 150 | Nos |
|---|
| 23 | 23 | Servicing of AUDCO/Gate/Ball valves of any size. | itemcode 28 | 600 | Nos |
|---|
| 24 | 24 | servicing of SWIVEL joint in TLF/TW loading arm | itemcode 29 | 150 | Nos |
|---|
| 25 | 25 | Greasing of gate valves of any size | itemcode 30 | 2700 | Nos |
|---|
| 26 | 26 | Cleaning and fixing of wire mesh for vent pipe of cone roof tanks | itemcode 31 | 624 | Nos |
|---|
| 27 | 27 | changing of gland packing of gate valves. | itemcode 32 | 1800 | Nos |
|---|
| 28 | 28 | cleaning of all oil sump/ OWS through out the month ( cleaniness to be maintained continious basis) by maintaining complete cleanliness of all oil water separator pits including dewatering ,salvaging of oil all complete irrespective the how many times cleaned in a month | itemcode 33 | 12 | Nos |
|---|
| 29 | 29 | Cleaning of all Tanks roof irrespective of size and capacity throughout the month | itemcode 34 | 12 | Nos |
|---|
| 30 | 30 | Strainer cleaning at TLF on quartely basis and or as per instruction of Officer | itemcode 35 | 276 | Nos |
|---|
| 31 | 31 | Sand filling at sand bin as an when required , through out the month | itemcode 36 | 12 | SU |
|---|
| 32 | 32 | Replacement of fire hydrant gate valves as per instruction of Officer | itemcode 37 | 24 | Nos |
|---|
| 33 | 33 | Fabrication of sand/dust bin from supplied barrels | itemcode 38 | 30 | Nos |
|---|
| 34 | 34 | Ensuring that all bonding of flanges/ equipments inside the terminal are properly connected, through out the month | itemcode 39 | 12 | SU |
|---|
| 35 | 35 | Complete cleaning of static water tank ( 2 chambers of the static water tank) | itemcode 40 | 2 | Nos |
|---|
| 36 | 36 | Replacement of female coupling of fire hydrant line; (consumables in scope of IOCL) | itemcode 41 | 60 | Nos |
|---|
| 37 | 37 | Servicing and cleaning of all hand operated siren, on weekly basis through out the month | itemcode 42 | 12 | SU |
|---|
| 38 | 38 | Complete cleaning of pipeline manifold sump including dewatering, through out the month | itemcode 43 | 12 | SU |
|---|
| 39 | 39 | Dewatering of pipeline manifold, through out the month | itemcode 44 | 12 | SU |
|---|
| 40 | 40 | maintaining complete cleanliness of all oil water separator pits including dewatering ,salvaging of oil all complete irrespective the how many times cleaned in a month | itemcode 45 | 12 | SU |
|---|
| 41 | 41 | Making the tank apron completely free from vegetation., through out the month | itemcode 46 | 12 | SU |
|---|
| 42 | 42 | Removal of all shrubs/plants/trees/unwanted growth of grasses from concrete areas, walls roof etc.as per direction once a month | itemcode 47 | 12 | SU |
|---|
| 43 | 43 | Maintenance of TW siding, removal of gusket, nuts bolts or any other unwanted materials and to be shifted anywhere inside the Terminal as decided by Officer-in-charge , drainage of hose content in case of loading and collection /disposal of oil spillage completely free from oil in the siding as per direction as and when required. | itemcode 48 | 12 | SU |
|---|
| 44 | 44 | Dusting/sweeping/mopping of windows panel , windows seal furniture fixture like AC ,sofa , almirah, freeze, name plates,doors in office building , new and old laboratories, lube room, TW section , S&D room, training room as per direction, through out the month | itemcode 49 | 12 | SU |
|---|
| 45 | 45 | Mopping up overflow / spillage of oil in TLF and maintaining the platform completely dry and free from any hazardous materials like cotton waste, mopping with sand daily. | itemcode 50 | 300 | Nos |
|---|
| 46 | 46 | Collection of all filled sample bottles from Laboratory sample room and emptying them in barrels of different grades and unloading them to nearest sump. | itemcode 51 | 12 | SU |
|---|
| 47 | 47 | Maintaining the TLF gantry dry cleaning of net, ladder, bays as per direction. | itemcode 52 | 12 | SU |
|---|
| 48 | 48 | Maintaining the TW gantry dry cleaning of net, ladder, bays as per direction. | itemcode 53 | 12 | SU |
|---|
| 49 | 49 | Unloading of materials from trucks coming from CIP Mourigram/ Other locations in store . Arranging the material in store as per direction of concerened officer. | itemcode 54 | 12 | SU |
|---|
| 50 | 50 | Taking blue Dye and marker containers from store and pouring it in SKO Hopper/ tank as per the required quantity and collection of empty container and keeping them in proper place . | itemcode 55 | 60 | Nos |
|---|
| 51 | 51 | Upkeeping of previous records for any future reference and sorting the records in proper order in record room (including the cleaning job) | itemcode 56 | 12 | SU |
|---|
| 52 | 52 | Effluent sample collection from OWSs and handing over them to Laboratory | itemcode 57 | 30 | Nos |
|---|
| 53 | 53 | Inside cleaning of air eliminators and their related parts of TLF Automation system | itemcode 58 | 280 | Nos |
|---|
| 54 | 54 | External cleaning of batch controller unit PD meter , DC valve and ancilliary units through out the month | itemcode 59 | 12 | SU |
|---|
| 55 | 55 | Arranging , connecting unloading hoses and lining up for decantation of loaded Product TT/ Provers/ Ethanol TT/ Bio Diesel TT/ into storage tank as per direction. | itemcode 60 | 1200 | Nos |
|---|
| 56 | 56 | Dewatering , cleaning by scrapping , sweeping and mopping entire main pump house manifold including Bio Diesel pump manifold/ Ethanol P/H or any manifold area as per direction of officer through Out the month | itemcode 61 | 12 | SU |
|---|
| 57 | 57 | Cleaning and re-arranging of files in main office as per direction. | itemcode 62 | 12 | SU |
|---|
| 58 | 58 | Providing assistance for checking TT calibration by filling calibration tower with water & pouring the same into individual chambers as per capacity & checking the dips as per direction of the officer in-charge. | itemcode 63 | 1440 | Nos |
|---|
| 59 | 59 | Complete checking and maintaing records of Air compressor, Air line at tank body valve, changing of Guskets, Leaky line if any for the entire Terminal through out the month. | itemcode 64 | 12 | SU |
|---|
| 60 | 60 | Cleaning of Solar Panels on roof top of buildings on weekly basis and or as per instruction of officer through out the month | itemcode 65 | 12 | SU |
|---|
| 61 | 61 | Monthly maintenance of Foam trolleys movable/fixed ( consumables are to be supplied by IOCL) | itemcode 66 | 12 | SU |
|---|
| 62 | 62 | Ensuring tyre pressure of 13 no foam trolleys ( additional trolleys may come in future) through out the year, tyre inflator machine needs to be arranged by Contractor and kept at site. Maintenace of the same is also to be carried out by Vendor. Incase tyre needs repair the same also needs to be carried out by vendor at no additional cost. | itemcode 67 | 12 | SU |
|---|
| 63 | 63 | Arranging Hydra/JCB or heavy lifting devices from market as per instruction of officer for shifting of heavy equipments/ pipelines/ structures etc ( For service of 8 hrs per day ) | itemcode 68 | 20 | Days |
|---|
| 64 | 64 | Arranging Jeep/ Tractor for shifting of Movable foam trolleys inside the terminal as per instruction of officer ( 8Hrs service per day) | itemcode 69 | 48 | Days |
|---|
| 65 | 65 | Cleaning/Dusting of HVLRs and its panel on weekly basis and or as per instruction of officer through out the month. (This includes cutting of grass if any at HVLR& Panel site) | itemcode 70 | 12 | SU |
|---|
| 66 | 66 | Painting/ repainting of dates, equipment details, sl.nos, equipment nos. etc on equipments viz.strainer, earthpits, valves, pumps, Hose boxes, hose pipes, fire hoses, DCP fire ex, Co2 fire ex etc. Also Details of product colour codes on pipelines. Details of Tank cleaning and maintenance dates etc using stencils, as per instruction of Officer. | itemcode 71 | 5000 | EA |
|---|
| 67 | 67 | Manpower assistance to AMC vendors like HCD, RSFPS, TAS, Compressor, Fire engine,HVLR, Product pumps,MFM, DG etc, as per instruction of officer through out the month | itemcode 72 | 12 | SU |
|---|
| 68 | 68 | Pressure testing of equipments/ pipelines/ valves/fire hoses/Fire extinguishers/Product Hose/TSV/PV valve/ PR valves, pressure Gauges etc. (1 no.Hydro testing Device ( electrical), 1 no. Pressure gauge testing device, 3 nos. of Non Sparking Tool Sets ( Open and Ring Wrenchs of size ranging from 8mm to 40mm, Pipe wrench, files, gasket cutting scissors, hand saws etc., 4 nos. of SS tools Sets ( Open and Ring Wrenchs of size ranging from 8mm to 40mm, Pipe wrench, files, gasket cutting scissors, hand saws etc), lubricating cans, 2 no.Trolley for shifting heavy equipments, chain block upto 3 ton capacity and 2 sets of weighing scales to be maintained at site, along with testing/ calibration/maintenance of the same is in scope of Vendor. After completion of contract period the same to be handed over to IOCL representatives) | itemcode 73 | | |
|---|
| 69 | 69 | Pressure testing of fire hoses of any quantity as per direction | itemcode 74 | 12 | SU |
|---|
| 70 | 70 | Pressure testing of 3/4 inch dia flexible product hoses of any quantity as per direction | itemcode 75 | 12 | SU |
|---|
| 71 | 71 | PV valve testing/ Servicing as per direction | itemcode 76 | 12 | SU |
|---|
| 72 | 72 | TSV Testing/ Setting/ Servicing as per direction | itemcode 77 | 12 | SU |
|---|
| 73 | 73 | PR valve testing/Servicing/Setting as per direction | itemcode 78 | 12 | SU |
|---|
| 74 | 74 | Pressure testing of Product Pipelines of any size and any length inside the terminal | itemcode 79 | 12 | SU |
|---|
| 75 | 75 | Hydrant pipeline testing of any size and any length inside the terminal | itemcode 80 | 12 | SU |
|---|
| 76 | 76 | DCP Fire extinguishers of any capacity and any no. as per direction of officer in charge | itemcode 81 | 12 | SU |
|---|
| 77 | 77 | Valve hydrotest/ leakage testing of any size and any quantity inside the terminal as per instruction of officer | itemcode 82 | 12 | SU |
|---|
| 78 | 78 | connection/disconnection of blanks/spades at different places. | itemcode 83 | | |
|---|
| 79 | 79 | 3\" size | itemcode 84 | 600 | Nos |
|---|
| 80 | 80 | 6\" size | itemcode 85 | 100 | Nos |
|---|
| 81 | 81 | 8\" size | itemcode 86 | 150 | Nos |
|---|
| 82 | 82 | 12\" & above | itemcode 87 | 150 | Nos |
|---|
| 83 | 83 | replacement of gasket in the running pipe line inclusive of all allied jobs like suction/collection and disposal of spilled oil etc. | itemcode 88 | | |
|---|
| 84 | 84 | 3\" size at TLF | itemcode 89 | 150 | Nos |
|---|
| 85 | 85 | 6\" size at TLF | itemcode 90 | 120 | Nos |
|---|
| 86 | 86 | gasket cutting to different sizes. | itemcode 91 | | |
|---|
| 87 | 87 | 3\" & 4\" | itemcode 92 | 1500 | Nos |
|---|
| 88 | 88 | 6\" & 8\" | itemcode 93 | 300 | Nos |
|---|
| 89 | 89 | 10\", 12\" & 14\" | itemcode 94 | 240 | Nos |
|---|
| 90 | 90 | 18\" & 20\" | itemcode 95 | 50 | Nos |
|---|
| 91 | 91 | 26\"&31\" and above | itemcode 96 | 30 | Nos |
|---|
| 92 | 92 | Checking leak proofness and rectification to serviceable order by providing seals/greasing etc through out the month | itemcode 97 | | |
|---|
| 93 | 93 | Fire hydrant valves | itemcode 98 | 12 | SU |
|---|
| 94 | 94 | Water monitor | itemcode 99 | 12 | SU |
|---|
| 95 | 95 | Foam Pourer | itemcode 100 | 12 | SU |
|---|
| 96 | 96 | Servicing of portable fire extinguishers , refill charge , other accessories charge date changing (every month) (Weighing scale is to be supplied by Vendor) | itemcode 101 | | |
|---|
| 97 | 97 | 70 KG | itemcode 102 | 120 | Nos |
|---|
| 98 | 98 | 25 KG | itemcode 103 | 240 | Nos |
|---|
| 99 | 99 | 10 KG | itemcode 104 | 1440 | Nos |
|---|
| 100 | 100 | Disconnection/connection of any valves at any place inside the terminalincluding collection of oil if necessary | itemcode 105 | | |
|---|
| 101 | 101 | (a) 6 inch dia | itemcode 106 | 25 | Nos |
|---|
| 102 | 102 | (b) 8 inch dia | itemcode 107 | 20 | Nos |
|---|
| 103 | 103 | (c) 10 inch dia | itemcode 108 | 15 | Nos |
|---|
| 104 | 104 | (d) 12 inch dia | itemcode 109 | 30 | Nos |
|---|
| 105 | 105 | (e) 14 inch dia | itemcode 110 | 20 | Nos |
|---|
| 106 | 106 | Assistance in periodic testing of fire engine/ jockey/ fire engine room cleaning along with record keeping of the same | itemcode 111 | 12 | SU |
|---|