Tender For Augmentation Of Rubber Plantation & Production For Economic Development Of Educated Unemployed Indigenous Tribal Communities ( Himalayan Rubber Plantation & Production Management Committee ) At Tulshijhora Village Under Bijni Indp. Acc. S.C. Beat, Bijni Under Chirang Soil Conservation Division, Kajalgaon
BOQ
| Name of Work: Augmentation of Rubber Plantation & Production for economic development of educated unemployed indigenous tribal communities (Himalayan Rubber Plantation & Production Management Committee) at Tulshijhora village under Bijni Indp. ACC. S.C. Beat, Bijni under Chirang Soil Conservation Division, Kajalgaon | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Clearing of jungle including removal of debris outside the area and burning etc. all complete as directed. | item1 | 1200 | Mdays |
| 2 | 2 | Terracing, lining and digging of pits of size 60 cm x 60 cm x 60 cm | item2 | 2200 | Mdays |
| 3 | 3 | Labour for construction of drain, approach road | item3 | 200 | Mdays |
| 4 | 4 | Labour for construction of footpath ect inside and around the plantation area. | item4 | 400 | Mdays |
| 5 | 5 | Collection of live wood fencing post of species, Jia, Modar, Auhat, Bor, Jori, Simul etc. from private patta land owners of size 2.0m long, 20-25 cm girth including local carriage and stacking etc. all complete. (i) For narrow strip – | item5 | 2600 | Nos |
| 6 | 6 | Raising of live fencing by planting Jathropha, vitex etc. cutting of 100 to 120 cm long & placed @15 cm apart centre to centre in between live posts of size 180 cm long, 10 to 15 cm dia driven at least 60 cm below ground & 120 cm above ground at 250 cm apart tied with Jati bamboo kamies in three rows binding with G.I. wire. (i) For narrow strip | item6 | 8000 | Rm |
| 7 | 7 | Cost of barbed wire made of best quality G.I. wire 12 G x 2 ply x 4 points -7.5 cm apart in coils without bobbin in rolls of 201 Rm including VAT 13.50% and ASIDC Commission 5% For narrow strip –Requirement of barbed wire | item7 | 28 | Qtl |
| 8 | 8 | ‘U’ Staple made of 10 G good quality galvanized wire of standard size (3, 4 & 5 cm) including VAT 13.50% and ASIDC Commission 5% | item8 | 140 | Kg |
| 9 | 9 | Fitting & fixing of barbed wire including erection of fencing posts up to a depth of 45 cm below ground level as directed (i) For narrow strip | item9 | 160 | Mdays |
| 10 | 10 | Survey, lining and stacking – Total person days | item10 | 100 | Mdays |
| 11 | 11 | Cost of planting materials (Plants raised in poly bags) | item11 | 10000 | Nos |
| 12 | 12 | Labour for planting of rubber plants raised in poly bags including filling of pits after being completed necessary treatment and carriage of plants up to the planting site. | item12 | 1700 | Mdays |
| 13 | 13 | Application of fertilizer - RP 20% (at the time of planting) | item13 | 1800 | Kg |
| 14 | 14 | Labour 5 mandays @ Rs. 240.00/manday Rs. 1,200.00 | item14 | 100 | Mdays |
| 15 | 15 | Cost of pesticides etc | item15 | 20 | LS |
| 16 | 16 | Establishment of cover crops: a) Material Cost L.S | item16 | 20 | LS |
| 17 | 17 | b) Labour | item17 | 240 | Mdays |
| 18 | 18 | Construction of temporary camp hut for storing of materials at work site as directed by the department. | item18 | 60.5 | Sqm |
| 19 | 19 | Construction of embankment with approved material obtained borrow pits with all lifts and leads, transporting to site, spreading, Grading to required slope and compacting as directed. | item19 | 7430.06 | Cum |
| 20 | 20 | Turfing with sods Furnishing & laying of the live sods of perennial turf forming Grass on embankment slope, verges and other location as direct. | item20 | 6400 | Sqm |
| 21 | 21 | Irrection of a tube well | item21 | 1 | LS |
| 22 | 22 | Signboard etc. | item22 | 1 | Nos |
| 23 | 23 | Labour for weeding, mulching & pruning (i) 1st weeding & mulching - | item23 | 500 | Mdays |
| 24 | 24 | (ii) 2nd weeding, pruning & mulching including refilling | item24 | 600 | Mdays |
| 25 | 25 | (iii) 3rd weeding, pruning & mulching | item25 | 500 | Mdays |
| 26 | 26 | (iv) 4th weeding & mulching | item26 | 500 | Mdays |
| 27 | 27 | Cost of planting materials for refilling assuming - 1%replacement | item27 | 100 | Nos |
| 28 | 28 | Providing supplying of chemical fertilizer as detailed below including Carriage up to site & VAT 4% (i) Rock phosphate 20% (a) To be applied in cover crops in two split doses = 150 Kg (b) As ingredient in 12:12:12 NPK mixture in two = 142 Kg | item28 | 5840 | Kg |
| 29 | 29 | (ii) Urea (46%) As ingredient in 12:12:12 NPK mixture to be applied in Two spit doses | item29 | 1220 | Kg |
| 30 | 30 | (iii) MOP (60%) As ingredient in 12:12:12 NPK mixture in two spit doses | item30 | 940 | Kg |
| 31 | 31 | Labour for manuring & split doses | item31 | 200 | Mdays |
| 32 | 32 | Fire protection works – | item32 | 140 | Mdays |
| 33 | 33 | Plant protection measures : (a) Materials | item33 | 20 | LS |
| 34 | 34 | (b) Labour | item34 | 100 | Mdays |
| 35 | 35 | Maintenance of cover crops. | item35 | 100 | Mdays |
| 36 | 36 | Maintenance of drain, footpath, roads & other misc. works | item36 | 400 | Mdays |
| 37 | 37 | Repairing of live fencing where necessary including pruning etc. materials component | item37 | 20 | LS |
| 38 | 38 | Labour component | item38 | 240 | Mdays |
| 39 | 39 | Weeding (a) 1st weeding, mulching, refilling and pruning | item39 | 440 | Mdays |
| 40 | 40 | (b) 2nd weeding & mulching | item40 | 400 | Mdays |
| 41 | 41 | (c) 3rd weeding & mulching | item41 | 400 | Mdays |
| 42 | 42 | (d) 4th weeding & mulching | item42 | 360 | Mdays |
| 43 | 43 | Cost of planting materials for refilling assuming 1%casualty Rubber Plant- | item43 | 100 | Nos |
| 44 | 44 | (a) Material Component : Providing supplying of chemical Fertilizer (12:12:12 NPK@250Kg/H) in two split doses) (i) Urea (46%) | item44 | 1220 | Kg |
| 45 | 45 | (ii) Rock phosphate (20%) | item45 | 2840 | Kg |
| 46 | 46 | (iii) MOP | item46 | 940 | Kg |
| 47 | 47 | (b) Labour component | item47 | 200 | Mdays |
| 48 | 48 | Labour for pruning/branch induction | item48 | 100 | Mdays |
| 49 | 49 | Plant protection works: (a) Material component L.S. | item49 | 20 | LS |
| 50 | 50 | (b) Labour component | item50 | 100 | Mdays |
| 51 | 51 | Maintenance of drains & roads | item51 | 60 | Mdays |
| 52 | 52 | Labour for fire line opening and engagement of watcher | item52 | 140 | Mdays |
| 53 | 53 | Labour for maintenance of foot path & live fencing | item53 | 360 | Mdays |
| 54 | 54 | Tools & Implements | item54 | 20 | LS |
| 55 | 55 | Weeding (a) 1st weeding & mulching | item55 | 400 | Mdays |
| 56 | 56 | (b) 2nd weeding & mulching | item56 | 400 | Mdays |
| 57 | 57 | (c) 3rd weeding & mulching | item57 | 320 | Mdays |
| 58 | 58 | Labour for pruning, etc | item58 | 60 | Mdays |
| 59 | 59 | (a) Material Component : Providing supplying of chemical Fertilizer (12:12:12 NPK@250Kg/H) in two split doses) (i) Urea (46%) | item59 | 1220 | Kg |
| 60 | 60 | (ii) Rock phosphate (20%) | item60 | 2840 | Kg |
| 61 | 61 | (iii) MOP | item61 | 940 | Kg |
| 62 | 62 | (b) Labour component | item62 | 200 | Mdays |
| 63 | 63 | Plant protection works: (a) Material component L.S. | item63 | 20 | LS |
| 64 | 64 | (b) Labour component | item64 | 100 | Mdays |
| 65 | 65 | Maintenance of drains, foot path & life fencing | item65 | 380 | Mdays |
| 66 | 66 | Watchman as fire watcher | item66 | 140 | Mdays |
| 67 | 67 | Tools & Implements | item67 | 20 | LS |
| 68 | 68 | Weeding (a) 1st weeding, mulching & pruning | item68 | 240 | Mdays |
| 69 | 69 | (b) 2nd weeding, mulching & pruning | item69 | 280 | Mdays |
| 70 | 70 | (c) 3rd weeding & mulching | item70 | 240 | Mdays |
| 71 | 71 | (a) Material Component : Providing supplying of chemical Fertilizer (12:12:12 NPK@250Kg/H) in two split doses) (i) Urea (46%) | item71 | 1220 | Kg |
| 72 | 72 | (ii) Rock phosphate (20%) | item72 | 2840 | Kg |
| 73 | 73 | (iii) MOP | item73 | 940 | Kg |
| 74 | 74 | (b) Labour component | item74 | 200 | Mdays |
| 75 | 75 | Plant protection works: (a) Material component L.S. | item75 | 20 | LS |
| 76 | 76 | (b) Labour component | item76 | 60 | Mdays |
| 77 | 77 | Labour for Maintenance of drains, misc works | item77 | 40 | Mdays |
| 78 | 78 | Labour for opening of fire line, boundary protection maintenance of foot path, etc. | item78 | 440 | Mdays |
| 79 | 79 | Tools & Implements | item79 | 20 | LS |
| 80 | 80 | Weeding & Mulching (a) 1st weeding & mulching | item80 | 300 | Mdays |
| 81 | 81 | (b) 2nd weeding & mulching | item81 | 300 | Mdays |
| 82 | 82 | (c) 3rd weeding & mulching | item82 | 300 | Mdays |
| 83 | 83 | (a) Material Component : Providing supplying of chemical Fertilizer (12:12:12 NPK@250Kg/H) in two split doses) (i) Urea (46%) | item83 | 1220 | Kg |
| 84 | 84 | (ii) Rock phosphate (20%) | item84 | 2840 | Kg |
| 85 | 85 | (iii) MOP | item85 | 940 | Kg |
| 86 | 86 | (b) Labour component | item86 | 200 | Mdays |
| 87 | 87 | Plant protection works: (a) Material component L.S. | item87 | 20 | LS |
| 88 | 88 | (b) Labour component | item88 | 20 | Mdays |
| 89 | 89 | Labour for Maintenance of drains, foot path & boundary protection including maitanance of fire line | item89 | 280 | Mdays |
| 90 | 90 | Tools & Implements | item90 | 20 | LS |
| 91 | 91 | Weeding & Mulching (a) 1st weeding & mulching | item91 | 300 | Mdays |
| 92 | 92 | (b) 2nd weeding & mulching | item92 | 300 | Mdays |
| 93 | 93 | (c) 3rd weeding & mulching | item93 | 300 | Mdays |
| 94 | 94 | (a) Material Component : Providing supplying of chemical Fertilizer (12:12:12 NPK@250Kg/H) in two split doses) (i) Urea (46%) | item94 | 1220 | Kg |
| 95 | 95 | (ii) Rock phosphate (20%) | item95 | 2840 | Kg |
| 96 | 96 | (iii) MOP | item96 | 940 | Kg |
| 97 | 97 | (b) Labour component | item97 | 200 | Mdays |
| 98 | 98 | Plant protection works: (a) Material component L.S. | item98 | 20 | LS |
| 99 | 99 | (b) Labour component | item99 | 20 | Mdays |
| 100 | 100 | Labour for Maintenance of fire line | item100 | 140 | Mdays |
| 101 | 101 | Earthwork in excavation for foundation trenches of walls, retaining walls, footings of column, steps, septic tank etc. including refilling (return filling) the quantity as necessary after completion of work, breaking clods in return filling, dressing, watering and ramming etc. and removal of surplus earth with all lead and lifts as directed and specified in the following classification of soils including bailing out water where necessary as directed and specified. (A) Up to a depth of 2.00m below the existing ground level.(a) In ordinary soil | item101 | 32.37 | Cum |
| 102 | 102 | Providing soling in foundation and under floor with stone/ best quality picked jhama brick, sand packed and laid to level and in panel after preparing the subgrade as directed including all labour and materials and if necessary dewatering, complete. (c).Stone soling of thickness 150mm. | item102 | 44.96 | Sqm |
| 103 | 103 | Plain cement concrete works with coarse aggregate of sizes 13mm to 32mm in foundation bed for footing steps, walls, brick works etc. as directed and specified including dewatering if necessary, and curing complete (shuttering where necessary shall be measured and paid separately). (a) In prop 1cement: 3 sand :6 coarse aggregate by volume | item103 | 4.5 | cum |
| 104 | 104 | Providing and laying plain/reinforced cement croncrete works cement, coarse sand & 20mm down graded stone aggregate including dewatering if necessary, and curing complete but excluding cost of form work and reinforcement for reinforced cement concrete work (form work and reinforcement will be measured and paid separately) (I) Using Mixer Machine(A) In substructure up to plinth level b) M20 grade concrete or Prop. 1:1.5:3 | item104 | 5.18 | cum |
| 105 | 105 | Brick work in cement morter with 1st class brick including racking out joints and curing complete as directed.(I) In Sub-structure upto plinth level including dewatering if necessary (a) In proportion 1:3. | item105 | 18.15 | Cum |
| 106 | 106 | Providing and laying 25mm thick damp proof course with cement concrete in prop 1:1.5:3 with graded stone agg. of 10mm down nominal size including providing approved damp proof admixture in proportion as recommended by the manufacturer including curing etc. complete as directed. | item106 | 14.11 | sqm |
| 107 | 107 | Providing and laying 25mm thick damp proof course with cement concrete in prop 1:1.5:3 with graded stone agg. of 10mm down nominal size including providing approved damp proof admixture in proportion as recommended by the manufacturer including curing etc. complete as directed.(II) In superstructure above plinth level up to 1st floor level. In columns, pillers, abd noshing | item107 | 4.23 | Cum |
| 108 | 108 | Supplying, fitting and fixing in position reinforcement bars conforming to relevant I.S. Code for R.C.C. work/ R.B. walling including straightening, cleaning, cutting and bending to proper shapes and length as per details, supplying and binding with 20G annealed black wire and placing in position with proper blocks, supports, chairs, spacers etc. complete.\n(No extra measurement for lap, hook, chair, anchor etc. will be entertained in the measurement as they are included in the rate) (Upto 1st floor level) b) Other ISI approved TMT reinforcement bar (SAI/BISCON/THERMAX)\n (For Assam Type Bldg., drain works,,retaining wall&boundary wall etc. | item108 | 10.28 | Qtl |
| 109 | 109 | 1st class brick nogged wall in cement mortar including racking out joints and curing complete as directed in super structure above plinth up to 1st floor level (protruding M.S rod/Tor steel of column to be embeded in cement mortar and will be measured and paid separately) (A) 112mm thick brick wall (a) In cement mortar in proportion 1:4. \n(1 cement:4 sand) | item109 | 112.01 | Sqm |
| 110 | 110 | Providing dressed wood work in Chanukahs and windows including supplying fitting and raising complete as diredted. (b) With Hollock timber | item110 | 0.95 | Cum |
| 111 | 111 | 15 mm thick Cement plaster in single coat on single or half brick wall for interior plastering up to 1st floor level including arises, internal rounded angles, not exceeding 80mm girth and finished even and smooth including curing complete as directed. A) On rough side a) In cement mortar 1:3 | item111 | 244.55 | Sqm |
| 112 | 112 | 10 mm thick Cement plaster in single coat on fair side of brick/concrete walls for interior plastering up to 1st floor level including arises or rounded angles not exceeding 80mm girth and finished even and smooth including curing complete as directed. b) In cement mortar 1:4 | item112 | 121.54 | Sqm |
| 113 | 113 | Providing form work of ordinary timber planking so as to give a rough finish including centering, shuttering, strutting and propping etc., height of propping and centering below supporting floor to ceiling not exceeding 4.0M and removal of the same for in-situ reinforced concrete and plain concrete work in: Foundation, footings, bases of columns, pile cap, raft and mass concrete works etc.(b) Using 25mm thick plank | item113 | 77.75 | Sqm |
| 114 | 114 | Sides of tie beams, grade beams etc. at or below ground level. (b) Using 25mm thick plank | item114 | 22.99 | Sqm |
| 115 | 115 | Flat Surfaces such as soffits of suspended floors, roofs, landings, cantelever slabs, chajjas, balconies and the like. (b)Using 25mm thick plank | item115 | 7.66 | Sqm |
| 116 | 116 | Plinth filling with river sand track carriage including loading unloading and spreading etc. complete | item116 | 59.9 | Cum |
| 117 | 117 | Providing brick flat soiling in foundation and under --- dewatering complete © Stone soiling of thickness 150mm | item117 | 79.86 | Sqm |
| 118 | 118 | Providing undressed wood work in roof trust, rafter, perlin, tie …. To MS stras b) With Hillock Sundi/Sam | item118 | 1.36 | Cum |
| 119 | 119 | Providing 45 mm thick GI sheet including supplying and fixing with necessary galvd. Screws and lapping etc. | item119 | 125.61 | Sqm |
| 120 | 120 | Providing GI ridging inclusing supplying and fixing with necessary galvd screws and 15 cm lapping --- as directed ) 45mm thick b)210mm lapping | item120 | 15.8 | Rm |
| 121 | 121 | 65 mm thick Cement Concrete floor consisting if 52 mm under layer cement concrete of propo of … including curing etc. comple as directed | item121 | 79.86 | Sqm |
| 122 | 122 | Providing fitting and fixing full paneled doors / windows …. With necessary screws. A) with teak wood/ sissu wood, ii) 15mm thick | item122 | 31.56 | Sqm |
| 123 | 123 | applying priming coat over new wood and woodbased surfaces over 100 mm in firth/width after and including preparing surface by thoroughly ….. Sand papring and knotting b) sith ready mixed paint, wood primer | item123 | 44.2 | Sqm |
| 124 | 124 | Distempering : applying one coat of distembering … even samd paper smooth | item124 | 366.095 | Sqm |
| 125 | 125 | Wall paiting two coat with acrylic …. Even and sand paper smooth | item125 | 366.095 | Sqm |
| 126 | 126 | Raising low side arround the building | item126 | 90 | Cum |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender