Public Administrative Department Government Departments Closing in 0 days TDR #21781233

Tender For Augmentation Of Rubber Plantation & Production For Economic Development Of Educated Unemployed Indigenous Tribal Communities (Himalayan Rubber Plantation & Production Management Committee) At Tulshijhora Village Under Bijni Indp. Acc. S.C. Beat

Issued by Government Departments · Bijni, Assam
Tender Value
96.70 Lakhs
Estimated cost
Bid Submission
26 Sep 2019
0 days left
EMD
1.93 Lakhs
Bank guarantee accepted
Document Fee
3000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Bijni → Assam
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender For Augmentation Of Rubber Plantation & Production For Economic Development Of Educated Unemployed Indigenous Tribal Communities ( Himalayan Rubber Plantation & Production Management Committee ) At Tulshijhora Village Under Bijni Indp. Acc. S.C. Beat, Bijni Under Chirang Soil Conservation Division, Kajalgaon

BOQ

Name of Work: Augmentation of Rubber Plantation & Production for economic development of educated unemployed indigenous tribal communities (Himalayan Rubber Plantation & Production Management Committee) at Tulshijhora village under Bijni Indp. ACC. S.C. Beat, Bijni under Chirang Soil Conservation Division, Kajalgaon
Sl.No.Item DescriptionItem Code / MakeQuantityUnits
11Clearing of jungle including removal of debris outside the area and burning etc. all complete as directed.item11200Mdays
22Terracing, lining and digging of pits of size 60 cm x 60 cm x 60 cmitem22200Mdays
33Labour for construction of drain, approach roaditem3200Mdays
44Labour for construction of footpath ect inside and around the plantation area.item4400Mdays
55Collection of live wood fencing post of species, Jia, Modar, Auhat, Bor, Jori, Simul etc. from private patta land owners of size 2.0m long, 20-25 cm girth including local carriage and stacking etc. all complete. (i) For narrow strip –item52600Nos
66Raising of live fencing by planting Jathropha, vitex etc. cutting of 100 to 120 cm long & placed @15 cm apart centre to centre in between live posts of size 180 cm long, 10 to 15 cm dia driven at least 60 cm below ground & 120 cm above ground at 250 cm apart tied with Jati bamboo kamies in three rows binding with G.I. wire. (i) For narrow stripitem68000Rm
77Cost of barbed wire made of best quality G.I. wire 12 G x 2 ply x 4 points -7.5 cm apart in coils without bobbin in rolls of 201 Rm including VAT 13.50% and ASIDC Commission 5% For narrow strip –Requirement of barbed wireitem728Qtl
88‘U’ Staple made of 10 G good quality galvanized wire of standard size (3, 4 & 5 cm) including VAT 13.50% and ASIDC Commission 5%item8140Kg
99Fitting & fixing of barbed wire including erection of fencing posts up to a depth of 45 cm below ground level as directed (i) For narrow stripitem9160Mdays
1010Survey, lining and stacking – Total person daysitem10100Mdays
1111Cost of planting materials (Plants raised in poly bags)item1110000Nos
1212Labour for planting of rubber plants raised in poly bags including filling of pits after being completed necessary treatment and carriage of plants up to the planting site.item121700Mdays
1313Application of fertilizer - RP 20% (at the time of planting)item131800Kg
1414Labour 5 mandays @ Rs. 240.00/manday Rs. 1,200.00item14100Mdays
1515Cost of pesticides etcitem1520LS
1616Establishment of cover crops: a) Material Cost L.Sitem1620LS
1717b) Labouritem17240Mdays
1818Construction of temporary camp hut for storing of materials at work site as directed by the department.item1860.5Sqm
1919Construction of embankment with approved material obtained borrow pits with all lifts and leads, transporting to site, spreading, Grading to required slope and compacting as directed.item197430.06Cum
2020Turfing with sods Furnishing & laying of the live sods of perennial turf forming Grass on embankment slope, verges and other location as direct.item206400Sqm
2121Irrection of a tube wellitem211LS
2222Signboard etc.item221Nos
2323Labour for weeding, mulching & pruning (i) 1st weeding & mulching -item23500Mdays
2424(ii) 2nd weeding, pruning & mulching including refillingitem24600Mdays
2525(iii) 3rd weeding, pruning & mulchingitem25500Mdays
2626(iv) 4th weeding & mulchingitem26500Mdays
2727Cost of planting materials for refilling assuming - 1%replacementitem27100Nos
2828Providing supplying of chemical fertilizer as detailed below including Carriage up to site & VAT 4% (i) Rock phosphate 20% (a) To be applied in cover crops in two split doses = 150 Kg (b) As ingredient in 12:12:12 NPK mixture in two = 142 Kgitem285840Kg
2929(ii) Urea (46%) As ingredient in 12:12:12 NPK mixture to be applied in Two spit dosesitem291220Kg
3030(iii) MOP (60%) As ingredient in 12:12:12 NPK mixture in two spit dosesitem30940Kg
3131Labour for manuring & split dosesitem31200Mdays
3232Fire protection works –item32140Mdays
3333Plant protection measures : (a) Materialsitem3320LS
3434(b) Labouritem34100Mdays
3535Maintenance of cover crops.item35100Mdays
3636Maintenance of drain, footpath, roads & other misc. worksitem36400Mdays
3737Repairing of live fencing where necessary including pruning etc. materials componentitem3720LS
3838Labour componentitem38240Mdays
3939Weeding (a) 1st weeding, mulching, refilling and pruningitem39440Mdays
4040(b) 2nd weeding & mulchingitem40400Mdays
4141(c) 3rd weeding & mulchingitem41400Mdays
4242(d) 4th weeding & mulchingitem42360Mdays
4343Cost of planting materials for refilling assuming 1%casualty Rubber Plant-item43100Nos
4444(a) Material Component : Providing supplying of chemical Fertilizer (12:12:12 NPK@250Kg/H) in two split doses) (i) Urea (46%)item441220Kg
4545(ii) Rock phosphate (20%)item452840Kg
4646(iii) MOPitem46940Kg
4747(b) Labour componentitem47200Mdays
4848Labour for pruning/branch inductionitem48100Mdays
4949Plant protection works: (a) Material component L.S.item4920LS
5050(b) Labour componentitem50100Mdays
5151Maintenance of drains & roadsitem5160Mdays
5252Labour for fire line opening and engagement of watcheritem52140Mdays
5353Labour for maintenance of foot path & live fencingitem53360Mdays
5454Tools & Implementsitem5420LS
5555Weeding (a) 1st weeding & mulchingitem55400Mdays
5656(b) 2nd weeding & mulchingitem56400Mdays
5757(c) 3rd weeding & mulchingitem57320Mdays
5858Labour for pruning, etcitem5860Mdays
5959(a) Material Component : Providing supplying of chemical Fertilizer (12:12:12 NPK@250Kg/H) in two split doses) (i) Urea (46%)item591220Kg
6060(ii) Rock phosphate (20%)item602840Kg
6161(iii) MOPitem61940Kg
6262(b) Labour componentitem62200Mdays
6363Plant protection works: (a) Material component L.S.item6320LS
6464(b) Labour componentitem64100Mdays
6565Maintenance of drains, foot path & life fencingitem65380Mdays
6666Watchman as fire watcheritem66140Mdays
6767Tools & Implementsitem6720LS
6868Weeding (a) 1st weeding, mulching & pruningitem68240Mdays
6969(b) 2nd weeding, mulching & pruningitem69280Mdays
7070(c) 3rd weeding & mulchingitem70240Mdays
7171(a) Material Component : Providing supplying of chemical Fertilizer (12:12:12 NPK@250Kg/H) in two split doses) (i) Urea (46%)item711220Kg
7272(ii) Rock phosphate (20%)item722840Kg
7373(iii) MOPitem73940Kg
7474(b) Labour componentitem74200Mdays
7575Plant protection works: (a) Material component L.S.item7520LS
7676(b) Labour componentitem7660Mdays
7777Labour for Maintenance of drains, misc worksitem7740Mdays
7878Labour for opening of fire line, boundary protection maintenance of foot path, etc.item78440Mdays
7979Tools & Implementsitem7920LS
8080Weeding & Mulching (a) 1st weeding & mulchingitem80300Mdays
8181(b) 2nd weeding & mulchingitem81300Mdays
8282(c) 3rd weeding & mulchingitem82300Mdays
8383(a) Material Component : Providing supplying of chemical Fertilizer (12:12:12 NPK@250Kg/H) in two split doses) (i) Urea (46%)item831220Kg
8484(ii) Rock phosphate (20%)item842840Kg
8585(iii) MOPitem85940Kg
8686(b) Labour componentitem86200Mdays
8787Plant protection works: (a) Material component L.S.item8720LS
8888(b) Labour componentitem8820Mdays
8989Labour for Maintenance of drains, foot path & boundary protection including maitanance of fire lineitem89280Mdays
9090Tools & Implementsitem9020LS
9191Weeding & Mulching (a) 1st weeding & mulchingitem91300Mdays
9292(b) 2nd weeding & mulchingitem92300Mdays
9393(c) 3rd weeding & mulchingitem93300Mdays
9494(a) Material Component : Providing supplying of chemical Fertilizer (12:12:12 NPK@250Kg/H) in two split doses) (i) Urea (46%)item941220Kg
9595(ii) Rock phosphate (20%)item952840Kg
9696(iii) MOPitem96940Kg
9797(b) Labour componentitem97200Mdays
9898Plant protection works: (a) Material component L.S.item9820LS
9999(b) Labour componentitem9920Mdays
100100Labour for Maintenance of fire lineitem100140Mdays
101101Earthwork in excavation for foundation trenches of walls, retaining walls, footings of column, steps, septic tank etc. including refilling (return filling) the quantity as necessary after completion of work, breaking clods in return filling, dressing, watering and ramming etc. and removal of surplus earth with all lead and lifts as directed and specified in the following classification of soils including bailing out water where necessary as directed and specified. (A) Up to a depth of 2.00m below the existing ground level.(a) In ordinary soilitem10132.37Cum
102102Providing soling in foundation and under floor with stone/ best quality picked jhama brick, sand packed and laid to level and in panel after preparing the subgrade as directed including all labour and materials and if necessary dewatering, complete. (c).Stone soling of thickness 150mm.item10244.96Sqm
103103Plain cement concrete works with coarse aggregate of sizes 13mm to 32mm in foundation bed for footing steps, walls, brick works etc. as directed and specified including dewatering if necessary, and curing complete (shuttering where necessary shall be measured and paid separately). (a) In prop 1cement: 3 sand :6 coarse aggregate by volumeitem1034.5cum
104104Providing and laying plain/reinforced cement croncrete works cement, coarse sand & 20mm down graded stone aggregate including dewatering if necessary, and curing complete but excluding cost of form work and reinforcement for reinforced cement concrete work (form work and reinforcement will be measured and paid separately) (I) Using Mixer Machine(A) In substructure up to plinth level b) M20 grade concrete or Prop. 1:1.5:3item1045.18cum
105105Brick work in cement morter with 1st class brick including racking out joints and curing complete as directed.(I) In Sub-structure upto plinth level including dewatering if necessary (a) In proportion 1:3.item10518.15Cum
106106Providing and laying 25mm thick damp proof course with cement concrete in prop 1:1.5:3 with graded stone agg. of 10mm down nominal size including providing approved damp proof admixture in proportion as recommended by the manufacturer including curing etc. complete as directed.item10614.11sqm
107107Providing and laying 25mm thick damp proof course with cement concrete in prop 1:1.5:3 with graded stone agg. of 10mm down nominal size including providing approved damp proof admixture in proportion as recommended by the manufacturer including curing etc. complete as directed.(II) In superstructure above plinth level up to 1st floor level. In columns, pillers, abd noshingitem1074.23Cum
108108Supplying, fitting and fixing in position reinforcement bars conforming to relevant I.S. Code for R.C.C. work/ R.B. walling including straightening, cleaning, cutting and bending to proper shapes and length as per details, supplying and binding with 20G annealed black wire and placing in position with proper blocks, supports, chairs, spacers etc. complete.\n(No extra measurement for lap, hook, chair, anchor etc. will be entertained in the measurement as they are included in the rate) (Upto 1st floor level) b) Other ISI approved TMT reinforcement bar (SAI/BISCON/THERMAX)\n (For Assam Type Bldg., drain works,,retaining wall&boundary wall etc.item10810.28Qtl
1091091st class brick nogged wall in cement mortar including racking out joints and curing complete as directed in super structure above plinth up to 1st floor level (protruding M.S rod/Tor steel of column to be embeded in cement mortar and will be measured and paid separately) (A) 112mm thick brick wall (a) In cement mortar in proportion 1:4. \n(1 cement:4 sand)item109112.01Sqm
110110Providing dressed wood work in Chanukahs and windows including supplying fitting and raising complete as diredted. (b) With Hollock timberitem1100.95Cum
11111115 mm thick Cement plaster in single coat on single or half brick wall for interior plastering up to 1st floor level including arises, internal rounded angles, not exceeding 80mm girth and finished even and smooth including curing complete as directed. A) On rough side a) In cement mortar 1:3item111244.55Sqm
11211210 mm thick Cement plaster in single coat on fair side of brick/concrete walls for interior plastering up to 1st floor level including arises or rounded angles not exceeding 80mm girth and finished even and smooth including curing complete as directed. b) In cement mortar 1:4item112121.54Sqm
113113Providing form work of ordinary timber planking so as to give a rough finish including centering, shuttering, strutting and propping etc., height of propping and centering below supporting floor to ceiling not exceeding 4.0M and removal of the same for in-situ reinforced concrete and plain concrete work in: Foundation, footings, bases of columns, pile cap, raft and mass concrete works etc.(b) Using 25mm thick plankitem11377.75Sqm
114114Sides of tie beams, grade beams etc. at or below ground level. (b) Using 25mm thick plankitem11422.99Sqm
115115Flat Surfaces such as soffits of suspended floors, roofs, landings, cantelever slabs, chajjas, balconies and the like. (b)Using 25mm thick plankitem1157.66Sqm
116116Plinth filling with river sand track carriage including loading unloading and spreading etc. completeitem11659.9Cum
117117Providing brick flat soiling in foundation and under --- dewatering complete © Stone soiling of thickness 150mmitem11779.86Sqm
118118Providing undressed wood work in roof trust, rafter, perlin, tie …. To MS stras b) With Hillock Sundi/Samitem1181.36Cum
119119Providing 45 mm thick GI sheet including supplying and fixing with necessary galvd. Screws and lapping etc.item119125.61Sqm
120120Providing GI ridging inclusing supplying and fixing with necessary galvd screws and 15 cm lapping --- as directed ) 45mm thick b)210mm lappingitem12015.8Rm
12112165 mm thick Cement Concrete floor consisting if 52 mm under layer cement concrete of propo of … including curing etc. comple as directeditem12179.86Sqm
122122Providing fitting and fixing full paneled doors / windows …. With necessary screws. A) with teak wood/ sissu wood, ii) 15mm thickitem12231.56Sqm
123123applying priming coat over new wood and woodbased surfaces over 100 mm in firth/width after and including preparing surface by thoroughly ….. Sand papring and knotting b) sith ready mixed paint, wood primeritem12344.2Sqm
124124Distempering : applying one coat of distembering … even samd paper smoothitem124366.095Sqm
125125Wall paiting two coat with acrylic …. Even and sand paper smoothitem125366.095Sqm
126126Raising low side arround the buildingitem12690Cum

AI Tender Summary

OUR REF NO 21781233
AUTHORITY Government Departments
TENDER VALUE 96.70 Lakhs
LAST DATE 26-09-2019
Authority
Authority Name Bodoland Territorial Council
Work Description Tender For Augmentation Of Rubber Plantation & Production For Economic Development Of Educated Unemployed Indigenous Tribal Communities ( Himalayan Rubber Plantation & Production Management Committee ) At Tulshijhora Village Under Bijni Indp. Acc. S.C. Beat, Bijni Under Chirang Soil Conservation Division, Kajalgaon
Basic Detail
Tender No TN 35 of 2019-20
Bidding Type Tender
Location
City Bijni
State Assam
Key Dates
Publish Date 13 Sep 2019
Submission Date 26 Sep 2019
Open Date 26 Sep 2019
Finance
Tender Value 96.70 Lakhs
Tender Fee 3000
EMD 1.93 Lakhs
Exemption Not Available
Document List
428203F8-7618-4B7B-AF16-CB7B3A4E0D82.html
Tendernotice_1.pdf
BOQ_21791.xls
SBD_35_2019_Soil.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 13, 2019
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 26, 2019
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Sep 26, 2019

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

428203F8-7618-4B7B-AF16-CB7B3A4E0D82.html

pdf

Tendernotice_1.pdf

xls

BOQ_21791.xls

pdf

SBD_35_2019_Soil.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders