| 1 | 1 | Earthwork in exacavation of foundation trenches in ordinary soil (vide classification of soil item -A)and disposal of excavated earth so obtained to a distance up to 50M and average life of 1.5M includimg leveling .Ramming ,the foundation trenches removing the roof of shrubs etc .all complete job as per specification and direction of E/I {7.1.27} | BI01010001010000000000000515BI0100001114 | 123.98 | PER CUM |
|---|
| 2 | 2 | extra for earthwork in hard soil (vide classication of soil item-B) all complete as per specification and direction of E/I.{7.1.10} | BI01010001010000000000000515BI0100001115 | 123.98 | PER CUM |
|---|
| 3 | 3 | Providing coarse clean local sand in filling in foundation trenches including ramming,watering,royality,complete job as per specification and direction of E/I. {7.1.37} | BI01010001010000000000000515BI0100001116 | 15.498 | PER CUM |
|---|
| 4 | 4 | providing 75A one Brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I. {7.7.14} | BI01010001010000000000000515BI0100001117 | 206.64 | PER SQM |
|---|
| 5 | 5 | Providing and laying R.C.C. M-200 with nominal mix of [1:1.5:3] in foundation of various components of canal or embankment structures with approved quality of 40mm graded coarse aggregate of required grade (as per design ) and approved quality of sand of requisite F.M.(2.5 to 3.0) washed and screened including necessary tools and plants, vibrating, curing, royalty and all taxes etc. excluding cost of centering and shuttering as well as reinforcement its cutting, bending,binding and placing complete job as per specification and direction of E/I.{7.3.5} | BI01010001010000000000000515BI0100001118 | 151.23 | PER CUM |
|---|
| 6 | 6 | Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade complete job as per specification and direction of E/I.{8.3}PWD | BI01010001010000000000000515BI0100001119 | 40180 | PER CM HEIGHT PER LETTER |
|---|
| 7 | 7 | Painting Of Post with 2 coats on new concrete Structure complete job as per specification and direction of E/I .{8.8}PWD | BI01010001010000000000000515BI0100001120 | 630.83 | PER SQM |
|---|
| 8 | 8 | Providing shuttering including strutting and propping etc and removal after use in Foundation as per specification and direction of E/I {7.3.18} | BI01010001010000000000000515BI0100001121 | 811.06 | PER SQM |
|---|
| 9 | 9 | Providing 12mm thick cement plaster (1:4) with approved quality sand of requisite F.M. (2.5 to 3.0) washed and screened and its removal, royalty and all taxes etc. complete job as per specification and direction of E/I.{7.5.2} | BI01010001010000000000000515BI0100001122 | 630.83 | PER SQM |
|---|
| 10 | 10 | Providing TMT bar reinforcement (tor steel) as per approved design. drawing, removal of rust, cutting, bending,binding, including supplying annealed wire, placing TMT bar in position all complete job as per specification and direction of E/I .{7.3.22(a)}(i) 8 mm dia TMT Fe 500 | BI01010001010000000000000515BI0100001123 | 3.923 | PER MT |
|---|
| 11 | 11 | Providing TMT bar reinforcement (tor steel) as per approved design. drawing, removal of rust, cutting, bending,binding, including supplying annealed wire, placing TMT bar in position all complete job as per specification and direction of E/I .{7.3.22(a)}(ii) 10 mm dia TMT Fe 500 | BI01010001010000000000000515BI0100001124 | 2.231 | PER MT |
|---|
| 12 | 12.01 | Carriage of materials with loading,unloading and stacking at site.\ncement - 15 km (pucca) from Meharama | BI01010001010000000000000515BI0100001125 | 66.92 | PER MT |
|---|
| 13 | 12.02 | Steel - 15 km (pucca) from Meharama | BI01010001010000000000000515BI0100001126 | 6.154 | PER MT |
|---|
| 14 | 12.03 | Sand - 38 Km (Pucca) from Hanwara | BI01010001010000000000000515BI0100001127 | 92.84 | PER CUM |
|---|
| 15 | 12.04 | Stones Chips - 35 Km (Pucca) from Mirza Chouki | BI01010001010000000000000515BI0100001128 | 130.06 | PER CUM |
|---|
| 16 | 12.05 | Brick - 20 km from mirja chauki | BI01010001010000000000000515BI0100001129 | 6.72 | PER 1000 NOS |
|---|
| 17 | 13 | Provision of Amin | BI01010001010000000000000515BI0100001130 | 30 | NOS |
|---|
| 18 | 14 | 12% GST | BI01010001010000000000000515BI0100001131 | 1 | Nos |
|---|
| 19 | 15 | 1% Labour Cess | BI01010001010000000000000515BI0100001132 | 1 | Nos |
|---|