Tender For Soil Investigation :-Job Work Is Required To Be Carried Out For Tender For Soil Investigation Of Provn Of Sewage Treatment Plant For Otm Accn Aundh Mil Camp , Kirkee . 1 . Drilling 100 Mm Dia Holes In Any Type Of Soil And 75 Mm Dia ( Nx Size ) In Rock Upto 10 M Depth Respectively , Collecting Disturbed Soil Samples / Rock Cores From Different Locations For Carrying Out Relevent Laboratory Test As Directed By Engineer -In- Charge Including Mobilization Of Drilling Rig & Manpower Incl Of Under Mentioned Tests :- ( A ) Conducting Density Test Of Soil ( Lab Tests ) . ( B ) Collecting Undisturbed Soil Samples . ( C ) Water Absortion Test ( Lab Test ) . ( D ) Soaked Crushing Strength Test On Rock . ( E ) Atterbergs Limit On Soil . ( F ) Conducting Standard Penetration Test ( Spt ) . ( G ) Specific Gravity ( H ) Chemical Analysis Of Soil / Water . ( J ) Porosity Of Rock . ( K ) Recommended Sbc Should Be Given For All Bor
Tender Overview
Project Description
Corrigendum - Tender For Soil Investigation :-Job Work Is Required To Be Carried Out For Tender For Soil Investigation Of Provn Of Sewage Treatment Plant For Otm Accn Aundh Mil Camp , Kirkee . 1 . Drilling 100 Mm Dia Holes In Any Type Of Soil And 75 Mm Dia ( Nx Size ) In Rock Upto 10 M Depth Respectively , Collecting Disturbed Soil Samples / Rock Cores From Different Locations For Carrying Out Relevent Laboratory Test As Directed By Engineer -In- Charge Including Mobilization Of Drilling Rig & Manpower Incl Of Under Mentioned Tests :- ( A ) Conducting Density Test Of Soil ( Lab Tests ) . ( B ) Collecting Undisturbed Soil Samples . ( C ) Water Absortion Test ( Lab Test ) . ( D ) Soaked Crushing Strength Test On Rock . ( E ) Atterbergs Limit On Soil . ( F ) Conducting Standard Penetration Test ( Spt ) . ( G ) Specific Gravity ( H ) Chemical Analysis Of Soil / Water . ( J ) Porosity Of Rock . ( K ) Recommended Sbc Should Be Given For All Bore Holes . ( L ) Photographic Record Of Geo-Exploration As Well As Testing Shall Also Form Part Of The Report . ( M ) Recommendation As Regards Possibility Of Liquifaction Of Soil In Case Of Saturated Or Partially Saturated Loose / Uncompacted Sandy Soils . ( N ) Depth Of Ground Water Table . ( O ) Compilation Of Filed And Lab Test Results And Submission Of Tender For Soil Investigation Report In 03 Copies . 2 . Testing Of Raw Sewage Water . 3 . Total Station On Hiring Basics With Surveyor & Helper Construction Site For Drainage Line Survey & Stp Ogl . $$ Serial No 1 ( A ) To ( O ) , Sl No . 02 Of Sample And Sl No . 03 Contain One Job Only . Note : ( I ) Ser No 1 ( A ) To 1 ( G ) One Job Only . ( Ii ) Six Month Guarantee Shall Be Given The Firm / Contractor . ,
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
Completed