| 1 | 1 | WORK | BI01010001010000000000000515BI0100001112 | | |
|---|
| 2 | 1.01 | Routine checking ,attending of DE & DS system (cyclone units) of CHP(2X500MW) including T/H & S/R system round the clock as per the scope of work. | BI01010001010000000000000515BI0100001113 | 1095 | job |
|---|
| 3 | 1.02 | Checking & preventive maintenance of the ventilation system of entire CHP(2X500 MW) including T/H, Emergency Hopper, MSS, SS-1, SS-2, PCH, SCH, Pent House, Battery room, Lift rooms, Bunker bay as per scope of work. | BI01010001010000000000000515BI0100001114 | 365 | job |
|---|
| 4 | 1.03 | Routine checking, attending & minor maintenance of Sump Pumps of CHP(2X500MW) area which includes 18 pumps located at 9 pumping stations e.g. T/H(-level), Emergency Hopper(-level) and other places of different capacities as per scope of work. | BI01010001010000000000000515BI0100001115 | 550 | job |
|---|
| 5 | 1.04 | Operation of spray water pipe line and routine checking of CF Fans at Track hopper of CHP-2x500 MW, BTPS | BI01010001010000000000000515BI0100001116 | 365 | Job |
|---|
| 6 | 2.01 | Laying of MS/GI pipe line 15 mm to 65 mm | BI01010001010000000000000515BI0100001117 | 100 | per mtr |
|---|
| 7 | 2.02 | Laying of MS/GI pipe line 80 mm to 300 mm | BI01010001010000000000000515BI0100001118 | 100 | per mtr |
|---|
| 8 | 3.01 | Fabrication & erection of MS/GI Bends 15 mm to 65 mm (average 40mm) | BI01010001010000000000000515BI0100001120 | 15 | per mm/No |
|---|
| 9 | 3.02 | Fabrication & erection of MS/GI Bends 80 mm to 300 mm (average 190mm) | BI01010001010000000000000515BI0100001121 | 15 | per mm/No |
|---|
| 10 | 4.01 | Fabrication & erection of MS/GI Bends Tees 15 mm to 65 mm (average 40mm) | BI01010001010000000000000515BI0100001122 | 15 | per mm/No |
|---|
| 11 | 4.02 | 80 mm to 300 mm (average 190mm) | BI01010001010000000000000515BI0100001123 | 15 | per mm/No |
|---|
| 12 | 5.01 | Dismantling of pipe lines 15 mm to 65 mm | BI01010001010000000000000515BI0100001124 | 100 | per mtr |
|---|
| 13 | 5.02 | 80 mm to 300 mm | BI01010001010000000000000515BI0100001125 | 100 | per mtr |
|---|
| 14 | 6.01 | Erection of valves on flanges 15 mm to 65 mm (average 40mm) | BI01010001010000000000000515BI0100001126 | 15 | per mm/No |
|---|
| 15 | 6.02 | 80 mm to 300 mm (average 190mm) | BI01010001010000000000000515BI0100001127 | 10 | per mm/No |
|---|
| 16 | 7.01 | Erection of valves with welded joint 15 mm to 65 mm (average 40mm | BI01010001010000000000000515BI0100001128 | 15 | per mm/No |
|---|
| 17 | 7.02 | 80 mm to 300 mm (average190mm) | BI01010001010000000000000515BI0100001129 | 10 | per mm/No |
|---|
| 18 | 8.01 | Dismantling of valves 15 mm to 65 mm (average 40mm) | BI01010001010000000000000515BI0100001131 | 15 | per mm/No |
|---|
| 19 | 8.02 | 80 mm to 300 mm (average 190mm) | BI01010001010000000000000515BI0100001132 | 10 | per mm/No |
|---|
| 20 | 9.01 | Fabrication & erection of Flanges\n25 mm to 300 mm (average150mm)\n | BI01010001010000000000000515BI0100001133 | 10 | per mm/No |
|---|
| 21 | 10 | Excavation & back filling of earth | BI01010001010000000000000515BI0100001134 | 10 | per mtr |
|---|
| 22 | 11.01 | Attending leakage in lines by welding/patching 15 mm to 65 mm | BI01010001010000000000000515BI0100001135 | 60 | Job |
|---|
| 23 | 11.02 | 80 mm to 300 mm | BI01010001010000000000000515BI0100001136 | 60 | job |
|---|
| 24 | 12.01 | Servicing of valves (Gate valve, Glove valve, Butterfly valve, Non return valve) 15 mm to 65 mm (average 40mm) | BI01010001010000000000000515BI0100001137 | 20 | per mm/No |
|---|
| 25 | 13.01 | Removal of chocking of discharge pipe of Sump pump | BI01010001010000000000000515BI0100001138 | 10 | job |
|---|
| 26 | 13.02 | Removal of chocking of Drain line\nof DE Cyclone\n | BI01010001010000000000000515BI0100001140 | 12 | job |
|---|
| 27 | 14.01 | Cleaning of Sump pump Pits Emergency Hopper | BI01010001010000000000000515BI0100001141 | 30 | job |
|---|
| 28 | 14.02 | Sump pump Pit up to 21 feet deep | BI01010001010000000000000515BI0100001142 | 20 | job |
|---|
| 29 | 15 | Removal of chocking of Cyclones | BI01010001010000000000000515BI0100001143 | 40 | job |
|---|
| 30 | 16 | Cleaning of Cyclones, its entire ducts, Extraction hoods & nozzle headers. | BI01010001010000000000000515BI0100001144 | 16 | job |
|---|
| 31 | 17 | Cleaning of DE/DS Reservoir Tank. | BI01010001010000000000000515BI0100001145 | 4 | job |
|---|
| 32 | 18.01 | Cleaning of Settlement Tank Stage - I | BI01010001010000000000000515BI0100001146 | 1 | job |
|---|
| 33 | 18.02 | Stage - II | BI01010001010000000000000515BI0100001147 | 1 | job |
|---|
| 34 | 18.03 | Stage - III | BI01010001010000000000000515BI0100001148 | 1 | job |
|---|
| 35 | 19 | Repairing of Ducts/Extraction Hood\nby patching etc. (upto 100mm x100 mm)\n | BI01010001010000000000000515BI0100001150 | 10 | job |
|---|
| 36 | 20.01 | Multistage vertical pump (4 kw - 16 kw) Replacement of coupling | BI01010001010000000000000515BI0100001151 | 1 | job |
|---|
| 37 | 20.02 | Replacement of Bearing/Bush | BI01010001010000000000000515BI0100001152 | 1 | job |
|---|
| 38 | 20.03 | Replacement of Mech. Seal | BI01010001010000000000000515BI0100001153 | 1 | job |
|---|
| 39 | 20.04 | Overhauling/re-visioning of pumps | BI01010001010000000000000515BI0100001154 | 2 | job |
|---|
| 40 | 20.05 | Replacement of Gland packing | BI01010001010000000000000515BI0100001155 | 4 | job |
|---|
| 41 | 21.01 | Overhauling of Sump pump (submersible type) 1.5 kw Pump | BI01010001010000000000000515BI0100001156 | 6 | job |
|---|
| 42 | 21.02 | 3.7 kw Pump | BI01010001010000000000000515BI0100001157 | 4 | job |
|---|
| 43 | 22.01 | Cleaning of Aluminium Viscous\nair filter of sizes (600x500x25mm, 600x600x25mm, 600x300x25mm) approximately 500 Nos.\n | BI01010001010000000000000515BI0100001158 | 6 | job |
|---|
| 44 | 22.02 | Cleaning of Bird screens, wall cowl, silencers, duct work etc of fans of different capacities | BI01010001010000000000000515BI0100001159 | 6 | job |
|---|
| 45 | 23.01 | Replacement of damaged foundation T bolt | BI01010001010000000000000515BI0100001160 | 1 | job |
|---|
| 46 | 23.02 | Replacement of damaged V belt | BI01010001010000000000000515BI0100001161 | 11 | job |
|---|
| 47 | 23.03 | Replacement/re-visioning of Bearing/plumber block | BI01010001010000000000000515BI0100001162 | 1 | job |
|---|
| 48 | 23.04 | Repairing the Shaft of the Fan | BI01010001010000000000000515BI0100001163 | 1 | job |
|---|
| 49 | 23.05 | Replacement/repair of Canvas flexible. | BI01010001010000000000000515BI0100001164 | 2 | job |
|---|
| 50 | 23.06 | Repairing of Impeller by welding etc. and Balancing there after | BI01010001010000000000000515BI0100001165 | 1 | job |
|---|
| 51 | 23.07 | Overhauling of Centrifugal Fan | BI01010001010000000000000515BI0100001166 | 4 | job |
|---|
| 52 | 24 | Servicing of fire spray nozzle. | BI01010001010000000000000515BI0100001167 | 16 | job |
|---|
| 53 | 25 | Attending leakage in underground pipeline by welding/patching up to 300mm dia. and 5ft deep | BI01010001010000000000000515BI0100001168 | 10 | job |
|---|
| 54 | 26 | Overhauling of Sump pump (submersible type) 12KW- 20KW. | BI01010001010000000000000515BI0100001169 | 1 | job |
|---|
| 55 | 27 | Over Hauling/Mechanical Maintenance of Ventilation Fan | BI01010001010000000000000515BI0100001170 | 6 | job |
|---|
| 56 | 28 | Maintenance of water spray/over head water spray system by welding/patching at T/H, around/along with road/lawn etc. | BI01010001010000000000000515BI0100001171 | 30 | job |
|---|