| 1 | 1 | Slip clearance (by manual means) of loose earth and other small loose materials including disposal complete as directed by the Engineer incharge | BI01010001010000000000000515BI0100001113 | 460.875 | Cum |
|---|
| 2 | 2 | Slip clearance (by manual means) of earth and boulders including disposal complete as directed by the Engineer-in-charge. | BI01010001010000000000000515BI0100001114 | 460.88 | Cum |
|---|
| 3 | 3 | Excavation in all type of soil (Loose,medium or hard) for hill road cutting by mechanical means Without useinng Dozer including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per Technical Specification Clause 1603.1 | BI01010001010000000000000515BI0100001115 | 138.26 | Cum |
|---|
| 4 | 4 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness) | BI01010001010000000000000515BI0100001116 | 1.92 | Hectare |
|---|
| 5 | 5 | Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction | BI01010001010000000000000515BI0100001117 | 467.7 | Cum |
|---|
| 6 | 6 | Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction | BI01010001010000000000000515BI0100001118 | 132.15 | Cum |
|---|
| 7 | 7 | Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including PVC Pipe as a weep hole and supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction | BI01010001010000000000000515BI0100001119 | 1342.8 | Cum |
|---|
| 8 | 8 | Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) | BI01010001010000000000000515BI0100001120 | 442.49 | Cum |
|---|
| 9 | 9 | Construction of coolie walling including supply of all material, labour, T&P etc. required for proper completion of the work as per direction of Engineerin- charge. (As per PWD Uttarakhand specifications) | BI01010001010000000000000515BI0100001121 | 44.99 | Cum |
|---|
| 10 | 10 | Providing and laying of wire crates 3.00x1.50x1.50 in size with GI wire 8 gauge BWG conforming to IS: 280 & IS:4826 in 150mm x 150mm mesh laid with stone boulders. as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) | BI01010001010000000000000515BI0100001122 | 405 | Cum |
|---|
| 11 | 11 | Hydraulic Excavator 0.9/1.0 cum (JCB Machine) | BI01010001010000000000000515BI0100001123 | 150 | hours |
|---|
| 12 | 12 | Cleaning of fully choked scupper and catchpit complete as directed by the Engineer-in-charge | BI01010001010000000000000515BI0100001124 | 1 | No |
|---|
| 13 | 13 | Cleaning of partially choked scupper and catchpit complete as directed by the Engineer-in-charge | BI01010001010000000000000515BI0100001125 | 1 | No |
|---|
| 14 | 14 | Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. (As per PWD Uttarakhand specifications) | BI01010001010000000000000515BI0100001126 | 733.5 | Cum |
|---|
| 15 | 15 | Concrete with cement, coarse sand and 40 mm gauge stone ballast in proportion 1:4:8 in foundations and floors including supply of all material, labour and T&P etc. required for proper completion of the work. (As per PWD Uttarakhand specifications) | BI01010001010000000000000515BI0100001127 | 56.61 | Cum |
|---|
| 16 | 16 | Hill Side Drain Clearance (Removal of earth from the choked hill side drain and disposing it on the valley side manually) | BI01010001010000000000000515BI0100001128 | 10500 | Rmt |
|---|
| 17 | 17 | Plain cement concrete in Grade M15 complete (As per PWD Uttarakhand specifications) | BI01010001010000000000000515BI0100001129 | 108 | Cum |
|---|
| 18 | 18 | Tubular Steel Railing on Medium Weight steel channel ( ISMC series) 100 mm x 50 mm\n(Providing, fixing and erecting 50 mm dia steel pipe railing in 3 rows duly painted on\nmedium weight steel channels (ISMC series) 100 mm x 50 mm, 1.2 metres high above\nground, 2 m centre to centre, complete as per approved drawings) | BI01010001010000000000000515BI0100001130 | 2100 | Rmt |
|---|
| 19 | 19 | Providing and erecting a \"W\" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810 ( if Concrete Required for Vertical post Fixing will be paid extra)\n | BI01010001010000000000000515BI0100001131 | 600 | Rmt |
|---|
| 20 | 20 | Supplying and Placing of reinforcement steel in sub-structure complete as \nper drawing and technical specifications | BI01010001010000000000000515BI0100001132 | 4.88 | Tonne |
|---|
| 21 | 21 | Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 R.C.C grade M 20 For nominal mix 1:1.5:3 | BI01010001010000000000000515BI0100001133 | 72.8 | Cum |
|---|
| 22 | 22 | Engaging one suitable Mate for monitoring the daily work full day as directed by Engineer in Charge | BI01010001010000000000000515BI0100001134 | 140 | Day |
|---|