| 1 | 1 | Provision for water analytical charges. | BI01010001010000000000000515BI0100001112 | 1 | No |
|---|
| 2 | 2 | Cost of drilling of trial borewell. | BI01010001010000000000000515BI0100001113 | 20 | Cum |
|---|
| 3 | 3 | Open well excavation in all soil complying with standard specification.\n1st Depth 0.00M - 1.00M below GL | BI01010001010000000000000515BI0100001114 | 113.04 | Cum |
|---|
| 4 | 4 | Open well excavation in SDR soil copmlying with standard specification.\n1stDepth 1.00M - 2.00M below GL | BI01010001010000000000000515BI0100001115 | 113.04 | Cum |
|---|
| 5 | 5 | Open well excavation in SDR soil copmlying with standard specification.\n2nd Depth 2.00M - 4.00M below GL | BI01010001010000000000000515BI0100001116 | 226.08 | Cum |
|---|
| 6 | 6 | Open well excavation in MDMR requiring blasting soil copmlying with standard specification.\n3rdDepth 4.00M - 6.00M below GL | BI01010001010000000000000515BI0100001117 | 226.08 | Cum |
|---|
| 7 | 7 | Open well excavation in hard rock requiring blasting complying with standard specification\n4th Depth 6.00M - 8.00M below GL | BI01010001010000000000000515BI0100001119 | 56.52 | Cum |
|---|
| 8 | 8 | Open well excavation in hard rock requiring blasting complying with standard specification\n5th Depth 8.00M - 10.00M below GL | BI01010001010000000000000515BI0100001120 | 56.52 | Cum |
|---|
| 9 | 9 | Open well excavation in hard rock requiring blasting complying with standard specification\n6th Depth 10.00M - 11.00M below GL | BI01010001010000000000000515BI0100001121 | 28.26 | Cum |
|---|
| 10 | 10 | Cement concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | BI01010001010000000000000515BI0100001122 | 2.92 | Cum |
|---|
| 11 | 11 | Centring for soffits of the plane surface including strutting shuttering etc complete complying with standard specification and as directed by TWAD board officers. | BI01010001010000000000000515BI0100001123 | 19.5 | Cum |
|---|
| 12 | 12 | supplying fabrication of steel including bending tying etc complete as directed by TWAD board officers. | BI01010001010000000000000515BI0100001124 | 0.9 | MT |
|---|
| 13 | 13 | RCC 1:1.5:3 using 20mm HBG metal including cost curing etc complete but excluding centering and steel complying with standard specification. | BI01010001010000000000000515BI0100001125 | 6.16 | Cum |
|---|
| 14 | 14 | Randam rubble masonry in CM1:5 for steining wall of open well complying with standard specification. | BI01010001010000000000000515BI0100001126 | 71.59 | Cum |
|---|
| 15 | 15 | Refilling excavated earth Including All Labour Charges Including Cost and Conveyance etc Complete. | BI01010001010000000000000515BI0100001127 | 1829.78 | Cum |
|---|
| 16 | 16 | Pointing to the outer side of Steining wall above GL in CM 1:3 Complying with standard Specification | BI01010001010000000000000515BI0100001128 | 32.5 | Cum |
|---|
| 17 | 17 | Earth work excavation in all types of soil lead And lift ss 20 B etc complete Including All Labour Charges Including Cost and Conveyance etc Complete. | BI01010001010000000000000515BI0100001129 | 1512 | Cum |
|---|
| 18 | 18 | Supply and Following of 90mm OD PVC Pipe Including Cost and Conveyance etc Complete. 4KSC | BI01010001010000000000000515BI0100001130 | 2000 | Sqm |
|---|
| 19 | 19 | Supply and Following of 63mm OD PVC Pipe including cost and conveyance etc., complete 4KSC | BI01010001010000000000000515BI0100001131 | 400 | Sqm |
|---|
| 20 | 20 | Supply and Following of 5HP 100Lpm x 100m Submersible Motor Pipe including cost and conveyance etc., complete | BI01010001010000000000000515BI0100001132 | 1 | No |
|---|
| 21 | 21 | Supply and Delievery of control panel board suitable for three phase submersible motor (3HP to 5HP) | BI01010001010000000000000515BI0100001133 | 1 | No |
|---|
| 22 | 22 | Supply and Following of 3Core 4.00Sqr mm Submersible cable including cost and conveyance etc., complete | BI01010001010000000000000515BI0100001134 | 50 | Sqm |
|---|
| 23 | 23 | Erection charges to new submersible pump etc fixing of panel board | BI01010001010000000000000515BI0100001135 | 1 | No |
|---|
| 24 | 24 | Fixing charges for PVC Pipe includng cost and conveyance for all labour charges etc., complete | BI01010001010000000000000515BI0100001136 | 2400 | Sqm |
|---|
| 25 | 25 | Sub Estimate | BI01010001010000000000000515BI0100001137 | | |
|---|
| 26 | 26 | Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation SS 20B | BI01010001010000000000000515BI0100001138 | 54.58 | Cum |
|---|
| 27 | 27 | Sand filling for foundation with clear river sand including cost of sand watering, ramming and consolidation etc complete | BI01010001010000000000000515BI0100001139 | 2.3 | Cum |
|---|
| 28 | 28 | Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete | BI01010001010000000000000515BI0100001140 | 3.46 | Cum |
|---|
| 29 | 29 | RCC 1:1.5:3 mix using 20mm metal using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete For rectangular portion | BI01010001010000000000000515BI0100001141 | 9.07 | Cum |
|---|
| 30 | 30 | RCC 1:1.5:3 mix using 20mm metal using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete Columns | BI01010001010000000000000515BI0100001142 | 21.04 | Cum |
|---|
| 31 | 31 | Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by 40mm GI pipes spaced at 75cm centre to centre complying with standard specifications etc., complete Plane Surfaces | BI01010001010000000000000515BI0100001143 | 49.48 | Sqm |
|---|
| 32 | 32 | Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by 40mm GI pipes spaced at 75cm centre to centre complying with standard specifications etc., complete For Brace Bottom Surfaces | BI01010001010000000000000515BI0100001144 | 189.54 | Sqm |
|---|
| 33 | 33 | Painting two coats with approved cement paint over one coat of priming coat over cement plastered exposed surface of the Reservoir including cleaning, preparing the surface and curing etc., complete | BI01010001010000000000000515BI0100001145 | 160.45 | Sqm |
|---|
| 34 | 34 | Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete | BI01010001010000000000000515BI0100001146 | 5.3 | MT |
|---|
| 35 | 35 | Supply delivery and fixing of staircase with M30 grade concrete for landings, MS ladder of 0.45m wide using 50x50x5mm MS angles for sides and steps at 0.30m c/c, with GI pipe handrails using 32mm GI pipes for railings and verical support at 0.45m C/c, MS flats (Size 40mm x 5mm ) for horizontal ties at 0.3m c/c and at bottom with Anchor fastener bolts of size 12mm x 75mm including cost of materials labour for fabrication of handrails fixing, painting etc., complete. | BI01010001010000000000000515BI0100001147 | 1 | No |
|---|
| 36 | 36 | Provision for pipe connection arrangements for inlet outlet, scour and overflow etc., including cost of pipes, specials, valve, labour charge for lifting, aligning, cutting, threading, fixing and painting of GI pipes with two coats of approved quality enamel paint etc., complete as detailed below. | BI01010001010000000000000515BI0100001148 | | |
|---|
| 37 | 37 | 65mm Ø GI pipes for inlet 1xl connection | BI01010001010000000000000515BI0100001149 | 19 | Mtr |
|---|
| 38 | 38 | 65mm Ø GI pipes for over flow pipe | BI01010001010000000000000515BI0100001150 | 18 | Mtr |
|---|
| 39 | 39 | 50mm Ø GI pipes for scour pipe 1xl | BI01010001010000000000000515BI0100001151 | 15 | Mtr |
|---|
| 40 | 40 | 65mm Ø GI pipe for delivery 1x1 pipe | BI01010001010000000000000515BI0100001152 | 13 | Mtr |
|---|
| 41 | 41 | 90mm Ø PVC Threaded coupler | BI01010001010000000000000515BI0100001153 | 2 | No |
|---|
| 42 | 42 | 75 mm Ø PVC threaded coupler | BI01010001010000000000000515BI0100001154 | 2 | No |
|---|
| 43 | 43 | 65mm Ø GI Tee | BI01010001010000000000000515BI0100001155 | 2 | No |
|---|
| 44 | 44 | 65mm Ø GI 900 Bend | BI01010001010000000000000515BI0100001156 | 5 | No |
|---|
| 45 | 45 | 65mm Ø GI coupler | BI01010001010000000000000515BI0100001157 | 9 | No |
|---|
| 46 | 46 | 65mm Ø GI union | BI01010001010000000000000515BI0100001158 | 1 | No |
|---|
| 47 | 47 | 65mm Ø GI Elbow | BI01010001010000000000000515BI0100001159 | 1 | No |
|---|
| 48 | 48 | 65x50mm Ø GI Reducer | BI01010001010000000000000515BI0100001160 | 1 | No |
|---|
| 49 | 49 | 75mmx 63mm PVC Reducer | BI01010001010000000000000515BI0100001161 | 1 | No |
|---|
| 50 | 50 | 75mm PVC Threaded coupler | BI01010001010000000000000515BI0100001162 | 2 | No |
|---|
| 51 | 51 | 75x90 PVC Reducer | BI01010001010000000000000515BI0100001163 | 1 | No |
|---|
| 52 | 52 | 75x63 PVC Reducer | BI01010001010000000000000515BI0100001164 | 1 | No |
|---|
| 53 | 53 | 65mm Ø GM Gate valve | BI01010001010000000000000515BI0100001165 | 2 | No |
|---|
| 54 | 54 | 50mm Ø GM gate valve | BI01010001010000000000000515BI0100001166 | 1 | No |
|---|
| 55 | 55 | GST Amount for providing Service to Government Contract Works for the above Construction Works.\n{GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package}\n | BI01010001010000000000000515BI0100001167 | 1 | GST Amount \n (in Rupees) |
|---|