Construction Of Field Channels Including Structures In The Ayacut Area Of W . U . A -5 , 6 And 7 Of Tmip . Construction Of Field Channel Work And Related Structures
Tender Value
6.95 Crore
Estimated cost
Bid Submission
24 Sep 2019
0 days left
EMD
6.95 Lakhs
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
BARINIPUT → Odisha
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Construction Of Field Channels Including Structures In The Ayacut Area Of W . U . A -5 , 6 And 7 Of Tmip . Construction Of Field Channel Work And Related Structures
BOQ
| Name of Work: Construction of Field Channels including structures of Panipanchayat No-5,6, 7 of TMIP | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Earthwork in excavation in foundation in all kind of soil including rough dressing & levelling the bed of foundation, breaking the clods to maximum 5cm to 7cm and laying the excavated materials in the earmarked place in layers not exceeding 0.30 M in depth with all lead, lift & de-lift excluding GST & including labour charges, tools and plants, taxes, cess, rehandling of the excavated materials, if required etc; all complete as per specification and direction of the Engineer-in-Charge. | 16085.1 | Cum | |
| 2 | 2 | R.R.S.M stone masonry in sand grouted in foundation and plinth with stone other than granite stone of approved size and quality form approved quarry including splays cutting, circular moulding, chamfering and cur belling, watering etc. complete excluding GST and including cost, conveyance, royalty, taxes of all the materials required for the work with all labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge. | 840 | Cum | |
| 3 | 3 | Filling in foundation and plinth with selected sand by mechanical or manual means laying in layers duly compacted including watering and ramming including collection and supplying the same from approved site excluding GST and including cost of all materials, all leads, lifts and delfts, labour charges, cess, royalty, all taxes, etc. complete. and as per specification and direction of the Engineer-in-Charge.. | 3337.01 | Cum | |
| 4 | 4 | Providing and laying plain cement concrete M-10 using 20mm and down size crusher broken hard granite chips free from skin, weathered surface and foreign materials, sharp sand, cement of approved grading and quality confirming to the specification mixed in concrete mixer with all leads and delifts and transportation by manual means and including cost of all leads , lifts, delifts , carriage, royalty, cess, and taxes excluding GST & including cost of all materials, dewatering with all costs, vibrating concrete by mechanical means, supplying T&P, curing for a specified period, supervision charges including mobilization and demobilization with all hire and running charges of all machineries and making necessary diversion arrangements wherever necessary and providing illumination if required etc. as per approved drawings and specification complete with all costs incidental to the work and as per specification and direction of the Engineer-in-Charge. | 3185.5 | Cum | |
| 5 | 5 | Providing and laying reinforced cement concrete M-15 using 20mm and down size crusher broken hard granite chips free from skin, weathered surface and foreign materials, sharp sand, cement of approved grading and quality confirming to the specification mixed in concrete mixer with all leads and delifts and transportation by manual means and including cost of all leads , lifts, delifts , carriage, royalty, cess, and taxes excluding GST & including cost of all materials, dewatering with all costs, vibrating concrete by mechanical means, supplying T&P, curing for a specified period, supervision charges including mobilization and demobilization with all hire and running charges of all machineries and making necessary diversion arrangements wherever necessary and providing illumination if required etc. as per approved drawings and specification complete with all costs incidental to the work and as per specification and direction of the Engineer-in-Charge.. | 7974.23 | Cum | |
| 6 | 6 | Supplying, providing, straightening the coiled or bent up HYSD bars, cutting, bending, binding, fitting and placing the bars in position with ties and chairs, spacers and binding wire 18 to 20 gauge, lapping, splicing, welding the joints wherever necessary for R.C.C works as per approved design, drawing excluding GST but including cost of leads, lifts & delfts, cost of all materials including binding wire, carriage, labour charges, cess, and taxes and providing illumination if required, supplying of all machineries including mobilization and demobilization, equipments, T&P, all costs incidental to the work, sundries etc. complete as per the specification and direction of the Engineer-in-Charge. | 97370.6 | Kg | |
| 7 | 7 | Providing rigid & smooth centering & shuttering for cement concrete works of foundation, mass concrete, pre-cast slabs, column base, footing etc; at any height or depth and dismantling them after specified period of casting, disposal of mucks away from the work site & including cost, conveyance, taxes excluding GST & including cost of all materials, labour charges, tools & plants, cess and all lead, lift & de-lift etc; complete as per specification and direction of the Engineer-in-Charge. | 67812.9 | Sqm | |
| 8 | 8 | Earthwork in excavation from approved borrow area by manual means carriage the earth by the mechanical means , filling with dressing & levelling , breaking the clods to maximum 5cm to 7cm and laying the excavated materials in layers not exceeding 0.30 M in depth including cost of all lead, lift & de-lift, labour charges, tools and plants, royality, taxes, excluding GST & including cess, rehandling of the excavated materials, if required, dewatering, mobilization and demobilization,all costs incidental to the work etc; all complete as per specification and direction of the Engineer-in-Charge. | 22185.3 | Cum | |
| 9 | 9 | Filling in foundation and plinth with approved quality of previously excavated earth in layers not exceeding 225 mm in depth including watering, ramming, re-handling of earth, if required with all leads. lifts, delifts , excluding GST and including ost of labour charges, cess, tools & plants, taxes , cost & carriage of water with all lead, lift & de-lift etc; complete as per specification and as per direction of the Engineer-in-Charge. | 2008.05 | Cum | |
| 10 | 10 | Fine dressing and turfing the slopes including filling of rain cuts and slips with selected earth at contractor's own cost duly compacted with approved quality of dub grass of rectangular shape of minimum 6.25cm thick including collection and supplying the same from approved site including loading, un-loading, conveyance charges and all other taxes , cess with all leads, lifts and delfts etc. as per approved drawing & specification including supplying of all machineries, equipments, T & P and other materials, mobilization and demobilization, equipments excluding GST and & including labour charges for the work and supervision charges, and making necessary diversion arrangements wherever necessary, including cost of watering and making arrangements for survival of grass to its full growth etc. complete as per specification and as per direction of the Engineer-in-charge. (Measurement and payment will be made after survival of turf to its full growth.) | 71710 | Sqm | |
| 11 | 11 | Supplying, laying and fixing in position of R.C.C hume Pipes (NP3) of size 600mm dia with collar jointed with cement mortar (1:3) complete including watering and curing and including cost of Hume pipes and all materials excluding GST and including conveyance, labour charges,leads , lifts, delfts,with all hire and running charges of all machineries and making necessary diversion arrangements wherever necessary, cost of incidental to the work and all taxes , cess, T&P etc. complete and as per specification ans as per direction of the Engineer-In-Charge. | 420 | RMT |
AI Tender Summary
Tender Timeline
Sep 07, 2019
11:30 IST
Tender Published
Tender notice published.
CompletedSep 24, 2019
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedSep 25, 2019
Bid Opening Date
Technical bids will be opened and evaluated.