Construction Of 11Kv Line For Giving 2Kwconnection To Senior Divisional Electrical Engineer At Nrlc Gate No. 147-A Between Rupa Mau, Railway Station To Raebareli Railway Station (2) Construction Of 11Kv Line For Giving 250Kva Industrial Connection To Mitt
Tender Overview
Project Description
CONSTRUCTION OF 11KV LINE FOR GIVING 2KWCONNECTION TO SENIOR DIVISIONAL ELECTRICAL ENGINEER AT NRLC GATE NO. 147-A BETWEEN RUPA MAU, RAILWAY STATION TO RAEBARELI RAILWAY STATION (2) CONSTRUCTION OF 11KV LINE FOR GIVING 250KVA INDUSTRIAL CONNECTION TO MITTAL AGRO PVT. LTD. C/O SUKHOO LAL CHANDWANI PLOT NO D-22 TO D- 24 AND D-26 TO D-31 AT INDUSTRIAL AREA AMAWAN ROAD RAEBARELI (3) CONSTRUCTION OF 11KV LINE FOR GIVING 05KW CONNECTION TO SENIOR DIVISIONAL ELECTRICAL ENGINEER NR LUCKNOW AT NEAR CHAMPA DEVI ,RAEBARELI (4) CONSTRUCTION OF 11KV LINE FOR GIVING 100KVA INDUSTRIAL CONNECTION TO OM CLARK IN C/O SRI HARIHAR SINGH NEAR- SARAS CHAURAHA, CIVIL LINES, RAEBARELI UNDER JURISDICTION OF ELECTRICITY DISRRIBUTION DIVISION- I, RAEBARELI .
BOQ
| Name of Work: SCHEDULE OF QUANTUM OF WORKS INVOLVED IN (1) CONSTRUCTION OF 11KV LINE FOR GIVING 2KWCONNECTION TO SENIOR DIVISIONAL ELECTRICAL ENGINEER AT NRLC GATE NO. 147-A BETWEEN RUPA MAU, RAILWAY STATION TO RAEBARELI RAILWAY STATION (2) CONSTRUCTION OF 11KV LINE FOR GIVING 250KVA INDUSTRIAL CONNECTION TO MITTAL AGRO PVT. LTD. C/O SUKHOO LAL CHANDWANI PLOT NO D-22 TO D- 24 AND D-26 TO D-31 AT INDUSTRIAL AREA AMAWAN ROAD RAEBARELI (3) CONSTRUCTION OF 11KV LINE FOR GIVING 05KW CONNECTION TO SENIOR DIVISIONAL ELECTRICAL ENGINEER NR LUCKNOW AT NEAR CHAMPA DEVI ,RAEBARELI (4) CONSTRUCTION OF 11KV LINE FOR GIVING 100KVA INDUSTRIAL CONNECTION TO OM CLARK IN C/O SRI HARIHAR SINGH NEAR- SARAS CHAURAHA, CIVIL LINES, RAEBARELI UNDER JURISDICTION OF ELECTRICITY DISRRIBUTION DIVISION- I, RAEBARELI . | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | CARTAGE OF STORE ITEMS FORM ESC, RAEBARELI TO DUMP SITE AND DUMP SITE TO WORK SITE ALONG WITH LOADING, UN-LOADING AND PROPER STACKING | BI01010001010000000000000515BI0100001124 | ||
| 2 | 1.01 | 8.5 Mtr long PCC Poles | BI01010001010000000000000515BI0100001114 | 7 | No |
| 3 | 1.02 | 9 Mtr long ST Poles | BI01010001010000000000000515BI0100001114 | 2 | No |
| 4 | 1.03 | 11 Mtr long ST Poles | BI01010001010000000000000515BI0100001114 | 4 | No |
| 5 | 1.04 | loose line material including ACSR weasel conductor Mtr. 50.00, ACSR Dog conductor Mtr. 120.00, ABC of size1x16+1x25mm2 26.00Mtr., ABC of size 3X50mm2 80.00Mtr.,11KV XLPE Cable of size 3x70mm2 Mtr. 30.00 . and other remaning items. | BI01010001010000000000000515BI0100001114 | 4 | Job |
| 6 | 1.05 | Cortage of 25KVA T/F | BI01010001010000000000000515BI0100001114 | 1 | No |
| 7 | 2 | Errection | BI01010001010000000000000515BI0100001124 | ||
| 8 | 2.01 | Errection of 8.5 Mtr. Long PCC Pole including digging of Pits & fitting of accessories. | 7 | No. | |
| 9 | 2.02 | Errection of Double poll by 9Mtr. Long ST Pole including digging of Pits & fitting of accessories. | 1 | No. | |
| 10 | 2.03 | Errection of Double poll by 11Mtr. Long ST Pole including digging of Pits & fitting of accessories. | 2 | No. | |
| 11 | 2.04 | Grouting of Poles as per RESSPO norms with grouting materials. | 10 | No. | |
| 12 | 2.05 | Earthing of poles as per RESSPO norms. | 10 | No. | |
| 13 | 2.06 | Digging of pits, fixing nozzling & grouting of stay rods as per RESSPO norms including grouting materials. | 7 | No. | |
| 14 | 2.07 | Laying, stringing & sagging of 3Ø 3 wire 11 kv HT line by ACSR WEASEL conductor including all associated works & making clearance of road with joints/jumpers & binding on insulators as required. | 15 | Mtr. /Length of line | |
| 15 | 2.08 | Laying, stringing & sagging of 3Ø 3 wire 11 kv HT line by ACSR dog conductor including all associated works & making clearance of road with joints/jumpers & binding on insulators as required. | 35 | Mtr. /Length of line | |
| 16 | 2.09 | Laying of 11KV XLPE cable of size 3x70mm2.complete in all respect as per RESSPO norms | 30 | Mtr. /Length of CABLE | |
| 17 | 2.1 | Laying of LT ABC .complete in all respect as per RESSPO norms | BI01010001010000000000000515BI0100001124 | ||
| 18 | 2.11 | ABC of size 1x16+1x25mm2 | 26 | Mtr. /Length of ABC | |
| 19 | 2.12 | ABC of size 3X50mm2 | 80 | Mtr. /Length of ABC | |
| 20 | 2.13 | Mounting of 25 KVA T/F transformer on D/P including all associated works as required. | 1 | No | |
| 21 | 2.14 | Mounting/Installation of New 11 Pilfer Proof Metering Quibical Ratio with cable Termination kit. Complete in all respect as per RESSPO norms. | 1 | Job | |
| 22 | 2.15 | Mounting/Errection of 11KV Jointing Kit suitable for 3x70mm2 XLPE cable. Complete in all respect as per RESSPO norms. | 2 | No | |
| 23 | 2.16 | Mounting/Errection of 11KV Jointing Kit suitable for 3x120mm2 XLPE cable. Complete in all respect as per RESSPO norms. | 2 | No | |
| 24 | 2.17 | Laying of PVC cable of size 3.5X50mm2 .Complete in all respect as per RESSPO norms | 50 | Mtr. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.