}

Supply , Installation , Testing And Commissioning And Maintenance For 1Year Of Centralised Medical Gas Systems In Community Health Center ( 100 Beds ) At Thiruvottriyur In Dn-11 , Z-1, Ripon Building-Tamil Nadu

Corporation Of Chennai-COC has published Supply , Installation , Testing And Commissioning And Maintenance For 1Year Of Centralised Medical Gas Systems In Community Health Center ( 100 Beds ) At Thiruvottriyur In Dn-11 , Z-1. Submission Date for this Tender is 16-09-2019. Medical Gas System Tenders in Ripon Building Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

21696806
Supply , Installation , Testing And Commissioning And Maintenance For 1Year Of Centralised Medical Gas Systems In Community Health Center ( 100 Beds ) At Thiruvottriyur In Dn-11 , Z-1
Open Tender
Indian
Tamil Nadu
Ripon Building
16-09-2019

Tender Details

Supply , Installation , Testing And Commissioning And maintenance For 1Year Of Centralised Medical Gas Systems In Community Health Center ( 100 Beds ) At Thiruvottriyur In Dn-11 , Z-1

Key Value

Document Fees
Refer document
EMD
INR 34100.0 /-
Tender Value
INR 34.05 Lakhs /-

BOQ Items

Name of Work:– Supply,Installation, testing and commissioning and maintence for 1year of Centralised Medical Gas system in Community Health Center (100 beds) at Thiruvottriyur in Dn-11, Zone-1
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Medical Gas Arrangements : Medical Gas Copper Pipeline 10mm OD 0.90mm thick copper pipe arrangement to hang on the wall of socket type connection installation of seamless cleaned and greased non arsenical phosphrous gas copper pipe line with saddles complete with brazing work including all copper fitting (tee, elbow, reducer, coupling). The copper pipelines should be tested suitable for steam of working pressure of 17.34Kg. / cm2 (17 bar) and confirm to Bs 864 Standard with specially made for brazed socket type connection. The medical gas copper pipeline should be tested as per standardand commissioning after painting as per internation Code No. IS 2379/1963 Table-V. The pipelines installed at the various wings and floors etc., complete as directed by the Departmental Officers as per IS code 12827 / 1989 & ISO 7396 / 1987 Specification. 160 RM
2 2 Medical Gas Copper Pipeline 15mm OD 0.90mm thick copper pipearrangement to hang on the wall of socket type connection installation of seamless cleaned and greased non arsenical phosphrous gas copper pipe line with saddles complete with brazing work including all copper fitting (tee, elbow, reducer, coupling). The copper pipelines should be tested suitable for steam of working pressure of 17.34Kg. / cm2 (17 bar) and confirm to Bs 864 Standard with specially made for brazed socket type connection. The medical gas copper pipeline should be tested as per standardand commissioning after painting as per internation Code No. IS 2379/1963 Table-V. The pipelines installed at the various wings and floors etc., complete as directed by the Departmental Officers as per IS code 12827 / 1989 & ISO 7396 / 1987 Specification. 650 RM
3 3 Medical Gas Copper Pipeline 22mm OD 0.90mm thick copper pipearrangement to hang on the wall of socket type connection installation of seamless cleaned and greased non arsenical phosphrous gas copper pipe line with saddles complete with brazing work including all copper fitting (tee, elbow, reducer, coupling). The copper pipelines should be tested suitable for steam of working pressure of 17.34Kg. / cm2 (17 bar) and confirm to Bs 864 Standard with specially made for brazed socket type connection. The medical gas copper pipeline should be tested as per standardand commissioning after painting as per internation Code No. IS 2379/1963 Table-V. The pipelines installed at the various wings and floors etc., complete as directed by the Departmental Officers as per IS code 12827 / 1989 & ISO 7396 / 1987 Specification. 600 RM
4 4 Medical Gas Copper Pipeline 28mm OD 0.90mm thick copper pipearrangement to hang on the wall of socket type connection installation of seamless cleaned and greased non arsenical phosphrous gas copper pipe line with saddles complete with brazing work including all copper fitting (tee, elbow, reducer, coupling). The copper pipelines should be tested suitable for steam of working pressure of 17.34Kg. / cm2 (17 bar) and confirm to Bs 864 Standard with specially made for brazed socket type connection. The medical gas copper pipeline should be tested as per standardand commissioning after painting as per internation Code No. IS 2379/1963 Table-V. The pipelines installed at the various wings and floors etc., complete as directed by the Departmental Officers as per IS code 12827 / 1989 & ISO 7396 / 1987 Specification. 150 RM
5 5 Gas Outlet Points: (Self sealing type - Single / DIN outlet pipe) with 'S' type bracket made up of copper and the outlet of non-interchangeable for other gas. The outlet points are brazed with brass bracket with self sealing valve (Stainless Steel) with all accessories and complete set and are covered by plastic cover duly colour coated as per specific gas and button cover etc complete as directed by the Departmental Officers and as per IS Code 12827 / 1989 & ISO 7396 / 1987 Specification. 90 Each
6 6 Oxygen manifold arrangements of 2 banks x 12 cylinder each wing with semi automatic control panel which includes contact gauge 2 Nos., outlet pressure gauge, brass heavy duty IO x regulator 2 Nos. with suitable adopter, flexible SS Hose. Manifold shall be of a construction and of a designs and material suitable for the service pressure in accordance with IS 1282-1989. Emergency alarms with illuminating display for low / high pipeline pressure and malfunctioning of system. 1) Manifold top frame with provision for connecting 12 cylinders on right bank and 12 cylinders on left bank with high pressure interconnecting copper tubing, silver brazing, non return valve, fasteners and cylinder support middle angle frame for claping 2 x 12 cylinders and relater fasteners. The O2 manifold should with stand a pressure of 140 Kg. / CMS. The installation is commissioned after testing as per standards and painted as per International Code and as directed by the Departmental Officers as per IS Code 12827 / 1989 & ISO 7396 / 1987 Specification. 1 Each
7 7 Nitrous Oxide manifold Arrangements of 2 banks x 3 cylinder each wing, with automatic control panel which includes contact gauge 2 Nos., outlet pressure gauge, brass heavy duty IOX regulator 2 Nos. with suitable adopter, flexible SS hose. Manifold shall be of a construction and of a designs and material suitable for the service pressure in accordance with IS 1282-1989. Emergency alarams with illuminating display for low / high pipeline pressure and malfunctioning of system.\n1) 2 x 3 cylinder Nitrus Oxide Manifold should be suitable with stand a pressure of 140 Kg. / Cm2 and above along with high pressure copper annealed tall pipes with end brass adapter suitable for Nitrous Oxide Cylinders and manifold.\n2) Top frame comprising of high pressure copper pipes of size 12mm ID 1.5mm wall thick with high pressure brass fitting made of high tensile brass and connections through non-return valves, high pressure copper tall pipes made of high pressure copper pipe size of 7mmID x 1.5mm thick.\n3) The design of middle and bottom frames should be provided to fit both round and flat bottom cylinders safely with fitted heavy duty regulator. The Manifold should be tested at 3500 pig as per IS 12827 / 1989 & ISO 7396 / 1987 Specification.\n 1 Each
8 8 Brass Isolation Valve 15mm Isolation Valve suitable for the copper pipe and should be of non lubricated 90 degree turn lever ball valve of reputed make, connected in line with medical gas pipe line system by using suitable size brass valve adopter union, ferrule, nipple, rubber ‘O’ ring, tapion lap and etc. All pipe line regulators shall be capable of controlling pipe line pressure and must compatible with the requirements specified in IS 12827 / 1989. All valves should be pneumatically tested for twice the working pressure for the gas line as per IS 12827 / 1989 & ISO 7396 / 1987 Specification. 40 Each
9 9 Brass Isolation Valve 22mm Isolation Valve suitable for the copper pipe and should be of non lubricated 90 degree turn lever ball valve of reputed make, connected in line with medical gas pipe line system by using suitable size brass valve adopter union, ferrule, nipple, rubber ‘O’ ring, tapion lap and etc. All pipe line regulators shall be capable of controlling pipe line pressure and must compatible with the requirements specified in IS 12827 / 1989. All valves should be pneumatically tested for twice the working pressure for the gas line as per IS 12827 / 1989 & ISO 7396 / 1987 Specification. 20 Each
10 10 Brass Isolation Valve 28mm Isolation Valve suitable for the copper pipe and should be of non lubricated 90 degree turn lever ball valve of reputed make, connected in line with medical gas pipe line system by using suitable size brass valve adopter union, ferrule, nipple, rubber ‘O’ ring, tapion lap and etc. All pipe line regulators shall be capable of controlling pipe line pressure and must compatible with the requirements specified in IS 12827 / 1989. All valves should be pneumatically tested for twice the working pressure for the gas line as per IS 12827 / 1989 & ISO 7396 / 1987 Specification. 8 Each
11 11 Theatre Vacuum Unit: The unit should comprise of two reusable 2000 ml shatter resistant bottle. Each made up of ply carbonate material and fully autoclavable at 134 degree centigrade, should have a vacuum regulator with instant ON / OFF switch and tree way left, right or both. All the above items should be mounted on a trolley having free moving castor wheels (As per IS 12827 / 1989 & ISO 7396 / 1987) 2 Each
12 12 Flow Meter made up of Brass with Humidifier Bottle Flow Metter should be back pressure compressed and should be accurate gas flow measurement with control range 0-13 liters per minute. It should meet strict permission and dumbling standard. The meter body should be made of brass materials. The humidifier bottle should be made of unbreakable polycarbonate material and auto cleavable at 134 degree centigrade. The rate includes flow meter and its accessories (silicon tube with mask). The cost of materials including transport, etc., complete as per standard specification and as directed by the Departmental Officer and as per As per IS 12827 / 1989 & ISO 7396 / 1987 Specification. 40 Each
13 13 Ward Vacuum Unit with Gauge both mounted on a collection jar of capacity 600 ml and with a wall bracket for mounting it on the wall. The collection jar should be made of unbreakable polycarbonate materials which is fully auto cleavable at 134 degree centigrade as per standard specification and as directed by the Departmental Officer and as per IS 12827 / 1989 & ISO 7396 / 1987 Specification. 40 Each
14 14 Supply, installation, testing and commissioning of equivalent\nto Ingersoll Rand Reciprocating Air Cooled Type (10 HP + 5\nHP) rating Vaccum Pump as per following provisions,\nAs per IS 12827 / 1987 & ISO 7396 / 1987 Specification\na) Vaccum pump 10 HP 1 set\nb) Electric motor 5 HP-1 No.\nC) DOL Starter with OLR 1 No.\nd) Vacuum switch 1 No.\ne) Vaccum Gauge 1 No.\nf) Control Frame with Fittings-1 No.\ng) Suction Scrubber -1 No\nh) V-Belts 1 No.\ni) GI & MS Fittings 1 No.\nj) Brass Fittings 1 No.\nk) Exhaust Silencer 1 No.\nl)Base frame for motor and vaccum pump 1 set\nm) Pilot line with fittings 1 set, Vacuum Room\nAir Compressor Room Inside 1 Each
15 15 Supply, installation, testing and commissioning\nCompressed Air System of Reciprocating Oil Free Air\nCompressor belt driven type air compressor w\nfollowing provisions.\nAs per IS 12827 1987 & ISO 73961987\nSpecification\nCompressor package consists of following:\na) 10 HP Air Compressor 2 Nos.\nb) Electric Motor 10 HP-1 No.\nc) Dol Starter L&T-10 HP 1 No.\nd) Base Frame Kit (for Motor and Compressor) 1set\ne) Pressure Switch 1 No.\n1) Pressure Gauge 1 No.\ng) NRV and Pilot Fittings 1 No.\nh) Delivery Tube 1 No\ni) Foundation Bolts & Anchor Fasteners 1 Lot\nj) Belt Guard 1 No.\nK) Air Drier 50 to 60 cfm. capacity 1 No. Drain Ball\nValve 1 No., Air Outlet Ball valve - 1 No.\nVacuum Room & Air Compressor Room Inside\nAccessories:\nNon-Return valves, Air Pressure Switch, Pressure\nGauge, Isolation Valves, Air Filters etc.,\nInter connecting piping: Mild Steel Pipe of 2" with\nfittings 1 Each
16 16 Supply, Installation, testing and Commissioning of MS Fabricated Vertical Mounted Type 1000 liters capacity Vacuum Receiver with inlet, and outlet and drain holes provided suitable to operate with vacuum pump, etc., as directed by the Departmental Officers.\n\n 1 Each
17 17 Supply, Installation, testing and commissioning of MS Fabricated Vertical Mounted type 1000 liters capacity Compressed Air Receiver with inlet and outlet and drain holes provided suitable to operate with vacuum pump etc as directed by the Departmental Officers. 1 Each
18 18 Single Arm Pendent Mounted on Ceiling Height as directed by the Departmental Officers. All items are Ms powder coated. The cost includes cost of all materials, labour charges, dismantling and re-doing masonry to original condition, painting of masonry works taxes including transports, risk allowance, scaffolding etc., complete and as per IS Code 12827 / 1989 & ISO 7396 / 1987 Specification. 2 Each
19 19 Bed Head Panel of size 1m length, height 0-0.30 cm and depth of 4”. The aluminium powder coated with requirement colour for provision points of 02-2 Nos., Air 1 No., Vaccum 1 No. with double electrical socket with switch 2 Nos. with 2 set with 1V – bottle holder fixing to the wall hanging including monitor stand etc., complete 10 Each
20 20 Supplying and fixing of Cylinder 46 Litre “D” Type Empty Seamless Medical Nitrous Cylinder with Valve and as per IS Code 12827 / 1989 & ISO 7396 / 1987 Specification etc., complete and complying with standard specification. 8 Each
21 21 Supplying and fixing of Cylinder 46 Litre ”D” Type Empty Seamless Medical Oxygen Cylinder with Valve and as per IS Code 12827 / 1989 & ISO 7396 / 1987 Specification etc. complete and complying with standard specification. 24 Each
22 22 Supplying, fabricating and fixing Oxygen Boyles Kit for Operation Theatre with following specification: The Boyles Kit Hose is made of silicon and of white colour as per standard suitable adoptor fixed on higher end of hose of connect outlet unit and Boyles Machine. The adopter must be made of SS of superior quality. The rate includes cost of all materials and labour charges for fixing in proper position etc. complete and complying with standard specification. 1 Each
23 23 Supplying, fabricating and fixing Nitrous Oxide Boyles Kit for Operation Theatre with following specification: The Boyles Kit Hose is made of silicon and of white colour as per standard suitable adoptor fixed on higher end of hose to connect outlet unit and Boyles Machine. The adopter must be made of SS of superior quality. The rate includes cost of all materials and labour charges for fixing in proper position etc. complete and complying with standard specification. 1 Each
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail