Airports Authority Of India has published Annual Repair Maintenance Of Electrical And Mechanical Installations 2019-20 Sh Cmc And Operation Of Existing 4 X 300Tr And Upcoming 2 X 300Tr Hvac Plant Along With Ams System At Visakhapatnam Airport. Submission Date for this Tender is 23-09-2019. Air Conditioner Tenders in Visakhapatnam Airport Andhra Pradesh. Bidders can get complete Tender details and download the document.
Name of Work: ARMO of Electrical & Mechanical Installations at Visakhapatnam Airport SH: Comprehensive Maintenance Contract & Operation of existing 4 x 300TR and upcoming 2 x 300TR HVAC plant along with AMS system. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Comprehensive Maintenance Contract for existing 4 x 300 TR HVAC System, AHU's, and Air conditioning Management system as per the List of Installations enclosed as Annexure-I(a), by carrying out Preventive Maintenance Inspections, Repairs, replacement of spares by deploying technically qualified & trained manpower as per the enclosed Special conditions of contract, Particular specifications, and Preventive maintenance check list(Annexure-II) etc. complete as required.\nFor 1st year | 1 | 12 | Month |
2 | 2 | Comprehensive Maintenance Contract for existing 4 x 300 TR HVAC System, AHU's, and Air conditioning Management system as per the List of Installations enclosed as Annexure-I(a), by carrying out Preventive Maintenance Inspections, Repairs, replacement of spares by deploying technically qualified & trained manpower as per the enclosed Special conditions of contract, Particular specifications, and Preventive maintenance check list(Annexure-II) etc. complete as required. \nFor 2nd year | 2 | 12 | Month |
3 | 3 | Running, Operation of 4 x 300 TR Screw Plant + 2 x 300TR Centrifugal chiller HVAC plant and associated Equipments / installations viz. Screw Chillers, Chilled water and Condenser water pumps, Cooling towers, AHU's, Water Softener plant, Make-up water tank, expansion tank, MCC Panel, AMS system etc. as specified in special conditions and Particular specifications enclosed. The Job includes satisfactory day-to-day operation by deploying required manpower(in 3 shifts of Eight hours each) & preventive / routine maintenance checks of the systems as per maintenance schedules enclosed in the tender, attending to minor complaints, repairs / rectifications, maintenance of records/ registers as per the enclosed special and particular specifications etc complete as required.(Installation of 2x300 TR Centrifugal Chiller is in progress. It will be handed over for operation on completion of commissioning of the plant.\n(Minimum manpower to be deployed by the Contractor) \nSupervisor -01nos in General shift,\nHightly Skilled Operator - 02 nos in Each Shifts - 06nos. + Reliever 01 no. = 7 nos.\nUn-skilled Helper - 01nos in Each shift - 03nos. + Reliever 01 no. = 4 nos.\nFor 1st year | 3 | 12 | Month |
4 | 4 | Running, Operation of 4 x 300 TR Screw Plant + 2 x 300TR Centrifugal chiller HVAC plant and associated Equipments / installations viz. Screw Chillers, Chilled water and Condenser water pumps, Cooling towers, AHU's, Water Softener plant, Make-up water tank, expansion tank, MCC Panel, AMS system etc. as specified in special conditions and Particular specifications enclosed. The Job includes satisfactory day-to-day operation by deploying required manpower(in 3 shifts of Eight hours each) & preventive / routine maintenance checks of the systems as per maintenance schedules enclosed in the tender, attending to minor complaints, repairs / rectifications, maintenance of records/ registers as per the enclosed special and particular specifications etc complete as required.(Installation of 2x300 TR Centrifugal Chiller is in progress. It will be handed over for operation on completion of commissioning of the plant.\n(Minimum manpower to be deployed by the Contractor) \nSupervisor -01nos in General shift,\nHightly Skilled Operator - 02 nos in Each Shifts - 06nos. + Reliever 01 no. = 7 nos.\nUn-skilled Helper - 01nos in Each shift - 03nos. + Reliever 01 no. = 4 nos.\nFor 2nd year | 4 | 12 | Month |
5 | 5 | Comprehensive Maintenance Contract for existing 4 x 300 TR and 1x500TR capacity cooling towers, chilled water pumps 4X35KW, as per the List of Installations enclosed as Annexure-I(b) , by carrying out Preventive Maintenance Inspections, Repairs, replacement of spares by deploying technically qualified & trained manpower as per the enclosed Special conditions of contract, Particular specifications, and Preventive maintenance check list(Annexure-II) etc. complete as required. \nFor 1st year | 5 | 12 | Month |
6 | 6 | Comprehensive Maintenance Contract of water softening plant of capacity 12,000 lph as per Annexure-I(c) used for HVAC system which includes replacement of spares, daily inspection and attending to complaints and repair work by deploying technically qualified & trained manpower as per the enclosed Special conditions of contract, Particular specifications, and Preventive maintenance check list(Annexure-II) etc. complete as required. \n1st year (Period of CMS starts after Defect liability period) | 6 | 12 | Month |
7 | 7 | Annual Maintenance Contract for 2 x 300 TR HVAC System and Air conditioning Management system as per the List of Installations enclosed as Annexure-III , by carrying out Preventive Maintenance Inspections by deploying technically qualified & trained manpower during the defect liability period as per OEM recommendations, as per the enclosed Special conditions of contract, Particular specifications, and Preventive maintenance check list(Annexure-II) etc. complete as required. | 7 | 12 | Month |
8 | 8 | Comprehensive Maintenance Contract for 2 x 300 TR HVAC System and Air conditioning Management system as per the List of Installations enclosed as Annexure-III , by carrying out Preventive Maintenance Inspections, Repairs, replacement of spares by deploying technically qualified & trained manpower as per the enclosed Special conditions of contract, Particular specifications, and Preventive maintenance check list(Annexure-II) etc. complete as required. \n1st year after Defect liability period | 8 | 12 | Month |
9 | 9 | Providing Crystal salt for regeneration of softener plant. | 9 | 22500 | Kg |
10 | 10 | Replacement of Marble coarse sand for Softener Plant | 10 | 2000 | Kg |
11 | 11 | Replacement of Activated Carbon for Softener Plant | 11 | 1500 | Kg |
12 | 12 | Replacement of Resin for Softener Plant | 12 | 2400 | Kg |
13 | 13 | Replacement of Multiport valve of size 50 NB for Softener Plant | 13 | 2 | No. |
14 | 14 | Replacement of Multiport valve of size 40 NB for Softener Plant | 14 | 4 | No. |
15 | 15 | Supply of PVC fills of suitable size and thickness for 350/360TR cooling tower & dismantling of existing fills and taking them away for proper disposal. | 15 | 12 | Job |
16 | 16 | Supply of PVC fills of suitable size and thickness for 500TR cooling tower & dismantling of existing fills and taking them away for proper disposal. | 16 | 1 | Job |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail