Tn . No . 5/2019-20/Hdo/Dt3 . 09 . 19 Widening From Il To Dl Irqp , Imp , Dip Raising , Construction Of Cd Works , Retaining Wall , Regradation , Reconstruction Of Three Row Pipe Culvert And Up Keeping For A Period Of 60 Months To Govt Highways Road
Tender Overview
Project Description
Tn . No . 5/2019-20/Hdo/Dt3 . 09 . 19 Widening From Il To Dl Irqp , Imp , Dip Raising , Construction Of Cd Works , Retaining Wall , Regradation , Reconstruction Of Three Row Pipe Culvert And Up Keeping For A Period Of 60 Months To Govt Highways Roads In Nambiyur Sub Division P No 43
BOQ
| Name of work :- Widening from Intermediate lane to two lane and Improvements, Improvements, Improvements to riding quality, Dip raising, Construction of CD works, Construction of Retaining wall, Regradation, Reconstruction of three row pipe culvert and Up Keeping for a period of 60 months to Government Highways roads in Nambiyur (H) C&M Sub Division Jurisdiction – Package No. 43A) Widening from Intermediate lane to Two lane and Improvements of Perundurai-Maccanamcombai road at km 22/0 - 23/0 including dip raising at km 22/8, 22/10, CD works at Km 22/8, 22/10 and retaining wall at km 22/8, 22/10 (MD357) including upkeeping for a period of 60 months B)Widening from Intermediate lane to Two lane and Improvements of Perundurai-Maccanamcombai road at km 23/0 - 23/6 including re-gradation at Km 23/4 (MD357) including upkeeping for a period of 60 monthsC) Improvements to Riding Quality at km 2/4 - 4/0 of Kurumandur-Kadathur road including upkeeping for a period of 60 monthsD)Improvements to Riding Quality at km 0/0 - 3/0 and 4/4 - 5/300 of Thottipalayam-Kolandapalayam road including upkeeping for a period of 60 months E) Improvements to Riding Quality at km 0/0 - 2/6 of Road from Km 12/8 of Palangarai-Nambiyur road to Komarapalayam road including upkeeping for a period of 60 monthsF)Improvements of Road from Km 12/8 of Palangarai-Nambiyur road to Komarapalayam road at km 2/6 - 2/8 including upkeeping for a period of 60 months G)Improvements to Riding Quality at km 0/0 - 1/6 of Kasipalayam main road Singiripalayam Approach road including upkeeping for a period of 60 months H)Improvements to Riding Quality at km 1/6 - 2/2 of Kasipalayam-Karattupalayam road including upkeeping for a period of 60 months I)Construction of Retaining wall at km 1/10 & 2/2 of Kasipalayam-Karattupalayam roadJ) Reconstruction of 3 row Pipe Culvert at km 22/10 of Cheyur to Erode-Sathy road including construction of retaining wall (SH15A) including upkeeping for a period of 60 months | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Picking the existing BT surface upto 50mm depth as directed by the departmental officers and collecting the picked up salvaged metal and stacking the same for reuse and deposting the debris excluding cost of materials including all labour charges for pickig and all other tools and plants employed for the work and including all other incidental charges etc., complete, as per MORTH Specification. \n(Morth No. 111, 112, 202) | 1 | Square metre | |
| 2 | 2 | Road A | 275 | Square metre | |
| 3 | 3 | Road B | 183.33 | Square metre | |
| 4 | 4 | Road F | 325 | Square metre | |
| 5 | 5 | Road G | 187.5 | Square metre | |
| 6 | 6 | Road H | 125 | Square metre | |
| 7 | 7 | Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer, as per MORTH Specification for boxing (SS 20B)\n(Morth No. 111, 112, 301, 305,900) | 1 | Square metre | |
| 8 | 8 | Road A | 734.4 | Cubic metre | |
| 9 | 9 | Road B | 432 | Cubic metre | |
| 10 | 10 | Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 of MORTH Specification- for grading- III Material (Morth No. 111, 112, 401, 900) | 1 | Square metre | |
| 11 | 11 | Road A | 457.21 | Cubic metre | |
| 12 | 12 | Road B | 304.5 | Cubic metre | |
| 13 | 13 | Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 of MORTH Specification- for grading- V Material (Morth No. 111, 112, 401, 900) | 1 | Square metre | |
| 14 | 14 | Road F | 146.32 | Cubic metre | |
| 15 | 15 | Wet Mix Macadam (Table 400-13) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, Complete as per clause 406 of MORTH Specification.\n (Morth No. 111, 112, 406, 900) | 1 | Square metre | |
| 16 | 16 | Road A | 571.79 | Cubic metre | |
| 17 | 17 | Road B | 362.5 | Cubic metre | |
| 18 | 18 | Road F | 216.75 | Cubic metre | |
| 19 | 19 | Road G | 84.38 | Cubic metre | |
| 20 | 20 | Road H | 56.25 | Cubic metre | |
| 21 | 21 | Prime coat Providing and applying primer coat with bitumen emulsion (SS-I type) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per clause 502 of MORTH Specification over WMM (Morth No. 111, 112, 501, 502, 900) | 1 | Square metre | |
| 22 | 22 | Road A | 2287.2 | Square metre | |
| 23 | 23 | Road B | 1450 | Square metre | |
| 24 | 24 | Road F | 975 | Square metre | |
| 25 | 25 | Road G | 562.5 | Square metre | |
| 26 | 26 | Road H | 375 | Square metre | |
| 27 | 27 | Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification- over granular surfaces treated with primer | 1 | Square metre | |
| 28 | 28 | Road A | 2287.2 | Square metre | |
| 29 | 29 | Road B | 1450 | Square metre | |
| 30 | 30 | Road F | 975 | Square metre | |
| 31 | 31 | Road G | 562.5 | Square metre | |
| 32 | 32 | Road H | 375 | Square metre | |
| 33 | 33 | Bituminous Macadam Providing and laying bituminous macadam with Mini Hot mix plant using crushed aggregates of specified grading premixed with bituminous binder (Viscosity Grade 30), transported to site, laid over a previously prepared surface using manual labour to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction, complete as per clause 504 of MORTH Specification - Grading II (Table 500-7) for patch work. (Morth No. 111, 112, 501, 504, 900, 3004) | 1 | Square metre | |
| 34 | 34 | Road A | 20.9 | Cubic metre | |
| 35 | 35 | Road B | 12.94 | Cubic metre | |
| 36 | 36 | Road C | 37.81 | Cubic metre | |
| 37 | 37 | Road D | 50.08 | Cubic metre | |
| 38 | 38 | Road E | 36.3 | Cubic metre | |
| 39 | 39 | Road G | 21.1 | Cubic metre | |
| 40 | 40 | Road H | 6.8 | Cubic metre | |
| 41 | 41 | Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification - over bituminous surfaces | 1 | Square metre | |
| 42 | 42 | Road A | 4675 | Square metre | |
| 43 | 43 | Road B | 2750 | Square metre | |
| 44 | 44 | Road C | 11200 | Square metre | |
| 45 | 45 | Road D | 14770.2 | Square metre | |
| 46 | 46 | Road E | 9817.6 | Square metre | |
| 47 | 47 | Road G | 5460.1 | Square metre | |
| 48 | 48 | Road H | 2044.45 | Square metre | |
| 49 | 49 | Bituminous Macadam of 50 mm thickness which work shall consist construction in the single course of compacted crushed aggregates premixed with bituminous binder 60/70 at the rate of 3.5 percent by weight of the total mix as directed by the engineer using CMP and paver finisher (Morth No. 111, 112, 501, 504, 900, 3004) | 1 | Square metre | |
| 50 | 50 | Road A | 233.75 | Cubic metre | |
| 51 | 51 | Road B | 137.5 | Cubic metre | |
| 52 | 52 | Road C | 112 | Cubic metre | |
| 53 | 53 | Road D | 144.38 | Cubic metre | |
| 54 | 54 | Road E | 97.51 | Cubic metre | |
| 55 | 55 | Road G | 52.5 | Cubic metre | |
| 56 | 56 | Road H | 18.75 | Cubic metre | |
| 57 | 57 | Dense Graded Bituminous Macadam (Table - 500-10) Providing and laying dense bituminous macadam with Hot Mix Plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade- 30) at percentage specified by Job Mix Formula by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolled as per clause 501.6 and 501.7 to achieve the desired compaction, as per clause No.505 of MoRTH specification Grading II 50mm thick\n(Morth No. 111, 112, 501, 505, 900) | 1 | Square metre | |
| 58 | 58 | Road A | 160.11 | Cubic metre | |
| 59 | 59 | Road B | 101.5 | Cubic metre | |
| 60 | 60 | Road F | 58.51 | Cubic metre | |
| 61 | 61 | Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment,rolled as per clause 501.6 and 501.7 to achieve the desired compaction as per clause No. 507 of MORTH Specification complete in all respects - Grading II (Morth No. 111, 112, 501, 507,900) | 1 | Square metre | |
| 62 | 62 | Road A | 208.86 | Cubic metre | |
| 63 | 63 | Road B | 126 | Cubic metre | |
| 64 | 64 | Road C | 336 | Cubic metre | |
| 65 | 65 | Road D | 443.11 | Cubic metre | |
| 66 | 66 | Road E | 294.53 | Cubic metre | |
| 67 | 67 | Road F | 29.26 | Cubic metre | |
| 68 | 68 | Road G | 180.68 | Cubic metre | |
| 69 | 69 | Road H | 72.58 | Cubic metre | |
| 70 | 70 | Excavation includuing removal and satisfactory disposal of all materials necessary for construction of roadway and side Drains in accordance with the specfications and lines , grades and cross sections shown in the drawings or as indicated by the Engineer. For Forming embankment using carted earth including consolidation for 95% compaction (Morth No. 111, 112, 301, 305,900) | 1 | Square metre | |
| 71 | 71 | Road A | 265.2 | Cubic metre | |
| 72 | 72 | Excavation includuing removal and satisfactory disposal of all materials necessary for construction of roadway and side Drains in accordance with the specfications and lines , grades and cross sections shown in the drawings or as indicated by the Engineer. For making up berms using box cutting earth including consolidation for 100% compaction (Morth No. 111, 112, 301, 305,900) | 1 | Square metre | |
| 73 | 73 | Road A | 734.4 | Cubic metre | |
| 74 | 74 | Road B | 450 | Cubic metre | |
| 75 | 75 | Excavation includuing removal and satisfactory disposal of all materials necessary for construction of roadway and side Drains in accordance with the specfications and lines , grades and cross sections shown in the drawings or as indicated by the Engineer. For forming embankment using carted earth including consolidation (Morth No. 111, 112, 301, 305,900) | 1 | Square metre | |
| 76 | 76 | Road A | 378.6 | Cubic metre | |
| 77 | 77 | Road B | 900.38 | Cubic metre | |
| 78 | 78 | Road C | 720 | Cubic metre | |
| 79 | 79 | Road D | 1755 | Cubic metre | |
| 80 | 80 | Road E | 1170 | Cubic metre | |
| 81 | 81 | Road F | 90 | Cubic metre | |
| 82 | 82 | Road G | 686.25 | Cubic metre | |
| 83 | 83 | Road H | 236.25 | Cubic metre | |
| 84 | 84 | UPKEEPING ROAD A | 1 | Square metre | |
| 85 | 85 | Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer, as per MORTH Specification. Making up berms\n(Morth No. 111, 112, 301, 305,900) | 1 | Square metre | |
| 86 | 86 | I st Year | 147 | Cubic metre | |
| 87 | 87 | II nd Year | 147 | Cubic metre | |
| 88 | 88 | III rd Year | 147 | Cubic metre | |
| 89 | 89 | IV th Year | 147 | Cubic metre | |
| 90 | 90 | V th Year | 147 | Cubic metre | |
| 91 | 91 | Excavation includuing removal and satisfactory disposal of all materials necessary for construction of roadway and side Drains in accordance with the specfications and lines , grades and cross sections shown in the drawings or as indicated by the Engineer. For Forming Earthern Drain (Once a year) (Morth No. 111, 112, 301, 305,900) | 1 | Square metre | |
| 92 | 92 | I st Year | 86.56 | Cubic metre | |
| 93 | 93 | II nd Year | 86.56 | Cubic metre | |
| 94 | 94 | IIII rd Year | 86.56 | Cubic metre | |
| 95 | 95 | IV th Year | 86.56 | Cubic metre | |
| 96 | 96 | V th Year | 86.56 | Cubic metre | |
| 97 | 97 | Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for clearing the vent way of CD works. (Morth No. 111, 112, 301, 305,900) | 1 | Square metre | |
| 98 | 98 | I st Year | 4 | Hours | |
| 99 | 99 | II nd Year | 4 | Hours | |
| 100 | 100 | III rd Year | 4 | Hours | |
| 101 | 101 | IV th Year | 4 | Hours | |
| 102 | 102 | V th Year | 4 | Hours | |
| 103 | 103 | Painting the existing HM & KM stone as per IRC standard and painting culverts for numbering including the cost of Labour charges and material etc., complete | 1 | Square metre | |
| 104 | 104 | I st Year | 1.58 | Square metre | |
| 105 | 105 | II nd Year | 1.58 | Square metre | |
| 106 | 106 | III rd Year | 1.58 | Square metre | |
| 107 | 107 | IV th Year | 1.58 | Square metre | |
| 108 | 108 | V th Year | 1.58 | Square metre | |
| 109 | 109 | Lettering the existing KM stone 10 CM as per IRC standard including the cost of labour charges and material etc., complete | 1 | Square metre | |
| 110 | 110 | I st Year | 26 | Numbers | |
| 111 | 111 | II nd Year | 26 | Numbers | |
| 112 | 112 | III rd Year | 26 | Numbers | |
| 113 | 113 | IV th Year | 26 | Numbers | |
| 114 | 114 | V th Year | 26 | Numbers | |
| 115 | 115 | Lettering the existing KM stone 15 CM as per IRC standard including the cost of labour charges and material etc., complete | 1 | Square metre | |
| 116 | 116 | I st Year | 6 | Numbers | |
| 117 | 117 | II nd Year | 6 | Numbers | |
| 118 | 118 | III rd Year | 6 | Numbers | |
| 119 | 119 | IV th Year | 6 | Numbers | |
| 120 | 120 | V th Year | 6 | Numbers | |
| 121 | 121 | Lettering the existing HM stone 10 cm as per IRC standard including the cost of labour charges and material etc., complete | 1 | Square metre | |
| 122 | 122 | I st Year | 8 | Numbers | |
| 123 | 123 | II nd Year | 8 | Numbers | |
| 124 | 124 | III rd Year | 8 | Numbers | |
| 125 | 125 | IV th Year | 8 | Numbers | |
| 126 | 126 | V th Year | 8 | Numbers | |
| 127 | 127 | Lettering the existing HM stone 15 cm as per IRC standard including the cost of labour charges and material etc., complete | 1 | Square metre | |
| 128 | 128 | I st Year | 16 | Numbers | |
| 129 | 129 | II nd Year | 16 | Numbers | |
| 130 | 130 | III rd Year | 16 | Numbers | |
| 131 | 131 | IV th Year | 16 | Numbers | |
| 132 | 132 | V th Year | 16 | Numbers | |
| 133 | 133 | White washing over the existing Culverts, Parapet, avenue and Guide post including cost of materials and labour charges etc, complete | 1 | Square metre | |
| 134 | 134 | I st Year | 26.8 | Square metre | |
| 135 | 135 | II nd Year | 26.8 | Square metre | |
| 136 | 136 | III rd Year | 26.8 | Square metre | |
| 137 | 137 | IV th Year | 26.8 | Square metre | |
| 138 | 138 | V th Year | 26.8 | Square metre | |
| 139 | 139 | Tree banding - White washing with freshly burnt shell lime including cost of fresh lime with suitable colour agent has to be done around the entire circumference of the trees to a hight of 0.9M consisting of 3 strips. White Washing to be start at a hight of 0.7M from the ground level such that the banding will be sufficiently visible to the driver seated at the height of 1.5M from the ground level. the cost inclusive of all materials, brushes and labours. Tree banding to be done as prescribed in the drawing or as directed by the Engineer incharge, as per MoRTH specification | 1 | Square metre | |
| 140 | 140 | I st Year | 30.78 | Square metre | |
| 141 | 141 | II nd Year | 30.78 | Square metre | |
| 142 | 142 | III rd Year | 30.78 | Square metre | |
| 143 | 143 | IV th Year | 30.78 | Square metre | |
| 144 | 144 | V th Year | 30.78 | Square metre | |
| 145 | 145 | Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 - over bituminous surfaces (Morth No. 111, 112, 501, 502, 900) | 1 | Square metre | |
| 146 | 146 | IV th Year | 206 | Square metre | |
| 147 | 147 | V th Year | 343 | Square metre | |
| 148 | 148 | Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment,rolled as per clause 501.6 and 501.7 to achieve the desired compaction as per clause No. 507 of MORTH Specification complete in all respects - Grading II\n(Morth No. 111, 112, 501, 507,900) | 1 | Square metre | |
| 149 | 149 | IV th Year | 6.17 | Cubic metre | |
| 150 | 150 | V th Year | 10.29 | Cubic metre | |
| 151 | 151 | UPKEEPING ROAD B | 1 | Square metre | |
| 152 | 152 | Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer, as per MORTH Specification. Making up berms\n(Morth No. 111, 112, 301, 305,900) | 1 | Square metre | |
| 153 | 153 | I st Year | 87 | Cubic metre | |
| 154 | 154 | II nd Year | 87 | Cubic metre | |
| 155 | 155 | III rd Year | 87 | Cubic metre | |
| 156 | 156 | IV th Year | 87 | Cubic metre | |
| 157 | 157 | V th Year | 87 | Cubic metre | |
| 158 | 158 | Excavation includuing removal and satisfactory disposal of all materials necessary for construction of roadway and side Drains in accordance with the specfications and lines , grades and cross sections shown in the drawings or as indicated by the Engineer. For Forming Earthern Drain (Once a year) (Morth No. 111, 112, 301, 305,900) | 1 | Square metre | |
| 159 | 159 | I st Year | 10.26 | Cubic metre | |
| 160 | 160 | II nd Year | 10.26 | Cubic metre | |
| 161 | 161 | IIII rd Year | 10.26 | Cubic metre | |
| 162 | 162 | IV th Year | 10.26 | Cubic metre | |
| 163 | 163 | V th Year | 10.26 | Cubic metre | |
| 164 | 164 | Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for clearing the vent way of CD works. (Morth No. 111, 112, 301, 305,900) | 1 | Square metre | |
| 165 | 165 | I st Year | 8 | Hours | |
| 166 | 166 | II nd Year | 8 | Hours | |
| 167 | 167 | III rd Year | 8 | Hours | |
| 168 | 168 | IV th Year | 8 | Hours | |
| 169 | 169 | V th Year | 8 | Hours | |
| 170 | 170 | Painting the existing HM & KM stone as per IRC standard and painting culverts for numbering including the cost of Labour charges and material etc., complete | 1 | Square metre | |
| 171 | 171 | I st Year | 0.57 | Square metre | |
| 172 | 172 | II nd Year | 0.57 | Square metre | |
| 173 | 173 | III rd Year | 0.57 | Square metre | |
| 174 | 174 | IV th Year | 0.57 | Square metre | |
| 175 | 175 | V th Year | 0.57 | Square metre | |
| 176 | 176 | Lettering the existing HM stone 10 cm as per IRC standard including the cost of labour charges and material etc., complete | 1 | Square metre | |
| 177 | 177 | I st Year | 6 | Numbers | |
| 178 | 178 | II nd Year | 6 | Numbers | |
| 179 | 179 | III rd Year | 6 | Numbers | |
| 180 | 180 | IV th Year | 6 | Numbers | |
| 181 | 181 | V th Year | 6 | Numbers | |
| 182 | 182 | Lettering the existing HM stone 15 cm as per IRC standard including the cost of labour charges and material etc., complete | 1 | Square metre | |
| 183 | 183 | I st Year | 12 | Numbers | |
| 184 | 184 | II nd Year | 12 | Numbers | |
| 185 | 185 | III rd Year | 12 | Numbers | |
| 186 | 186 | IV th Year | 12 | Numbers | |
| 187 | 187 | V th Year | 12 | Numbers | |
| 188 | 188 | White washing over the existing Culverts, Parapet, avenue and Guide post including cost of materials and labour charges etc, complete | 1 | Square metre | |
| 189 | 189 | I st Year | 53.6 | Square metre | |
| 190 | 190 | II nd Year | 53.6 | Square metre | |
| 191 | 191 | III rd Year | 52.6 | Square metre | |
| 192 | 192 | IV th Year | 53.6 | Square metre | |
| 193 | 193 | V th Year | 53.6 | Square metre | |
| 194 | 194 | Tree banding - White washing with freshly burnt shell lime including cost of fresh lime with suitable colour agent has to be done around the entire circumference of the trees to a hight of 0.9M consisting of 3 strips. White Washing to be start at a hight of 0.7M from the ground level such that the banding will be sufficiently visible to the driver seated at the height of 1.5M from the ground level. the cost inclusive of all materials, brushes and labours. Tree banding to be done as prescribed in the drawing or as directed by the Engineer incharge, as per MoRTH specification | 1 | Square metre | |
| 195 | 195 | I st Year | 20.88 | Square metre | |
| 196 | 196 | II nd Year | 20.88 | Square metre | |
| 197 | 197 | III rd Year | 20.88 | Square metre | |
| 198 | 198 | IV th Year | 20.88 | Square metre | |
| 199 | 199 | V th Year | 20.88 | Square metre | |
| 200 | 200 | Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 - over bituminous surfaces (Morth No. 111, 112, 501, 502, 900) | 1 | Square metre | |
| 201 | 201 | IV th Year | 126 | Square metre | |
| 202 | 202 | V th Year | 210 | Square metre | |
| 203 | 203 | Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment,rolled as per clause 501.6 and 501.7 to achieve the desired compaction as per clause No. 507 of MORTH Specification complete in all respects - Grading II\n(Morth No. 111, 112, 501, 507,900) | 1 | Square metre | |
| 204 | 204 | IV th Year | 3.78 | Cubic metre | |
| 205 | 205 | V th Year | 6.3 | Cubic metre | |
| 206 | 206 | UPKEEPING ROAD C | 1 | Square metre | |
| 207 | 207 | Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer, as per MORTH Specification. Making up berms\n(Morth No. 111, 112, 301, 305,900) | 1 | Square metre | |
| 208 | 208 | I st Year | 223.5 | Cubic metre | |
| 209 | 209 | II nd Year | 223.5 | Cubic metre | |
| 210 | 210 | IIII rd Year | 223.5 | Cubic metre | |
| 211 | 211 | IV th Year | 223.5 | Cubic metre | |
| 212 | 212 | V th Year | 223.5 | Cubic metre | |
| 213 | 213 | Painting the existing HM & KM stone as per IRC standard and painting culverts for numbering including the cost of Labour charges and material etc., complete | 1 | Square metre | |
| 214 | 214 | I st Year | 2.77 | Square metre | |
| 215 | 215 | II nd Year | 2.77 | Square metre | |
| 216 | 216 | IIII rd Year | 2.77 | Square metre | |
| 217 | 217 | IV th Year | 2.77 | Square metre | |
| 218 | 218 | V th Year | 2.77 | Square metre | |
| 219 | 219 | Lettering the existing KM stone 10 CM as per IRC standard including the cost of labour charges and material etc., complete | 1 | Square metre | |
| 220 | 220 | I st Year | 20 | Numbers | |
| 221 | 221 | II nd Year | 20 | Numbers | |
| 222 | 222 | III rd Year | 20 | Numbers | |
| 223 | 223 | IV th Year | 20 | Numbers | |
| 224 | 224 | V th Year | 20 | Numbers | |
| 225 | 225 | Lettering the existing KM stone 15 CM as per IRC standard including the cost of labour charges and material etc., complete | 1 | Square metre | |
| 226 | 226 | I st Year | 12 | Numbers | |
| 227 | 227 | II nd Year | 12 | Numbers | |
| 228 | 228 | III rd Year | 12 | Numbers | |
| 229 | 229 | IV th Year | 12 | Numbers | |
| 230 | 230 | V th Year | 12 | Numbers | |
| 231 | 231 | Lettering the existing HM stone 10 cm as per IRC standard including the cost of labour charges and material etc., complete | 1 | Square metre | |
| 232 | 232 | I st Year | 12 | Numbers | |
| 233 | 233 | II nd Year | 12 | Numbers | |
| 234 | 234 | III rd Year | 12 | Numbers | |
| 235 | 235 | IV th Year | 12 | Numbers | |
| 236 | 236 | V th Year | 12 | Numbers | |
| 237 | 237 | Lettering the existing HM stone 15 cm as per IRC standard including the cost of labour charges and material etc., complete | 1 | Square metre | |
| 238 | 238 | I st Year | 24 | Numbers | |
| 239 | 239 | II nd Year | 24 | Numbers | |
| 240 | 240 | III rd Year | 24 | Numbers | |
| 241 | 241 | IV th Year | 24 | Numbers | |
| 242 | 242 | V th Year | 24 | Numbers | |
| 243 | 243 | Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 - over bituminous surfaces (Morth No. 111, 112, 501, 502, 900) | 1 | Square metre | |
| 244 | 244 | IV th Year | 336 | Square metre | |
| 245 | 245 | V th Year | 560 | Square metre | |
| 246 | 246 | Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment,rolled as per clause 501.6 and 501.7 to achieve the desired compaction as per clause No. 507 of MORTH Specification complete in all respects - Grading II\n(Morth No. 111, 112, 501, 507,900) | 1 | Square metre | |
| 247 | 247 | IV th Year | 10.08 | Cubic metre | |
| 248 | 248 | V th Year | 16.8 | Cubic metre | |
| 249 | 249 | UPKEEPING ROAD D | 1 | Square metre | |
| 250 | 250 | Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer, as per MORTH Specification. Making up berms\n(Morth No. 111, 112, 301, 305,900) | 1 | Square metre | |
| 251 | 251 | I st Year | 612 | Cubic metre | |
| 252 | 252 | II nd Year | 612 | Cubic metre | |
| 253 | 253 | III rd Year | 612 | Cubic metre | |
| 254 | 254 | IV th Year | 612 | Cubic metre | |
| 255 | 255 | V th Year | 612 | Cubic metre | |
| 256 | 256 | Excavation includuing removal and satisfactory disposal of all materials necessary for construction of roadway and side Drains in accordance with the specfications and lines , grades and cross sections shown in the drawings or as indicated by the Engineer. For Forming Earthern Drain (Once a year) (Morth No. 111, 112, 301, 305,900) | 1 | Square metre | |
| 257 | 257 | I st Year | 312.08 | Cubic metre | |
| 258 | 258 | II nd Year | 312.08 | Cubic metre | |
| 259 | 259 | III rd Year | 312.08 | Cubic metre | |
| 260 | 260 | IV th Year | 312.08 | Cubic metre | |
| 261 | 261 | V th Year | 312.08 | Cubic metre | |
| 262 | 262 | Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for clearing the vent way of CD works. (Morth No. 111, 112, 301, 305,900) | 1 | Square metre | |
| 263 | 263 | I st Year | 16 | Hours | |
| 264 | 264 | II nd Year | 16 | Hours | |
| 265 | 265 | III rd Year | 16 | Hours | |
| 266 | 266 | IV th Year | 16 | Hours | |
| 267 | 267 | V th Year | 16 | Hours | |
| 268 | 268 | Painting the existing HM & KM stone as per IRC standard and painting culverts for numbering including the cost of Labour charges and material etc., complete | 1 | Square metre | |
| 269 | 269 | I st Year | 6.11 | Square metre | |
| 270 | 270 | II nd Year | 6.11 | Square metre | |
| 271 | 271 | III rd Year | 6.11 | Square metre | |
| 272 | 272 | IV th Year | 6.11 | Square metre | |
| 273 | 273 | V th Year | 6.11 | Square metre | |
| 274 | 274 | Lettering the existing KM stone 10 CM as per IRC standard including the cost of labour charges and material etc., complete | 1 | Square metre | |
| 275 | 275 | I st Year | 96 | Numbers | |
| 276 | 276 | II nd Year | 96 | Numbers | |
| 277 | 277 | III rd Year | 96 | Numbers | |
| 278 | 278 | IV th Year | 96 | Numbers | |
| 279 | 279 | V th Year | 96 | Numbers | |
| 280 | 280 | Lettering the existing KM stone 15 CM as per IRC standard including the cost of labour charges and material etc., complete | 1 | Square metre | |
| 281 | 281 | I st Year | 24 | Numbers | |
| 282 | 282 | II nd Year | 24 | Numbers | |
| 283 | 283 | III rd Year | 24 | Numbers | |
| 284 | 284 | IV th Year | 24 | Numbers | |
| 285 | 285 | V th Year | 24 | Numbers | |
| 286 | 286 | Lettering the existing HM stone 10 cm as per IRC standard including the cost of labour charges and material etc., complete | 1 | Square metre | |
| 287 | 287 | I st Year | 30 | Numbers | |
| 288 | 288 | II nd Year | 30 | Numbers | |
| 289 | 289 | III rd Year | 30 | Numbers | |
| 290 | 290 | IV th Year | 30 | Numbers | |
| 291 | 291 | V th Year | 30 | Numbers | |
| 292 | 292 | Lettering the existing HM stone 15 cm as per IRC standard including the cost of labour charges and material etc., complete | 1 | Square metre | |
| 293 | 293 | I st Year | 60 | Numbers | |
| 294 | 294 | II nd Year | 60 | Numbers | |
| 295 | 295 | III rd Year | 60 | Numbers | |
| 296 | 296 | IV th Year | 60 | Numbers | |
| 297 | 297 | V th Year | 60 | Numbers | |
| 298 | 298 | White washing over the existing Culverts, Parapet, avenue and Guide post including cost of materials and labour charges etc, complete | 1 | Square metre | |
| 299 | 299 | I st Year | 107.2 | Square metre | |
| 300 | 300 | II nd Year | 107.2 | Square metre | |
| 301 | 301 | III rd Year | 107.2 | Square metre | |
| 302 | 302 | IV th Year | 107.2 | Square metre | |
| 303 | 303 | V th Year | 107.2 | Square metre | |
| 304 | 304 | Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 - over bituminous surfaces (Morth No. 111, 112, 501, 502, 900) | 1 | Square metre | |
| 305 | 305 | IV th Year | 433 | Square metre | |
| 306 | 306 | V th Year | 722 | Square metre | |
| 307 | 307 | Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment,rolled as per clause 501.6 and 501.7 to achieve the desired compaction as per clause No. 507 of MORTH Specification complete in all respects - Grading II\n(Morth No. 111, 112, 501, 507,900) | 1 | Square metre | |
| 308 | 308 | IV th Year | 12.98 | Cubic metre | |
| 309 | 309 | V th Year | 21.61 | Cubic metre | |
| 310 | 310 | UPKEEPING ROAD E | 1 | Square metre | |
| 311 | 311 | Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer, as per MORTH Specification. Making up berms\n(Morth No. 111, 112, 301, 305,900) | 1 | Square metre | |
| 312 | 312 | I st Year | 379.5 | Cubic metre | |
| 313 | 313 | II nd Year | 379.5 | Cubic metre | |
| 314 | 314 | III rd Year | 379.5 | Cubic metre | |
| 315 | 315 | IV th Year | 379.5 | Cubic metre | |
| 316 | 316 | V th Year | 379.5 | Cubic metre | |
| 317 | 317 | Excavation includuing removal and satisfactory disposal of all materials necessary for construction of roadway and side Drains in accordance with the specfications and lines , grades and cross sections shown in the drawings or as indicated by the Engineer. For Forming Earthern Drain (Once a year) (Morth No. 111, 112, 301, 305,900) | 1 | Square metre | |
| 318 | 318 | I st Year | 164.03 | Cubic metre | |
| 319 | 319 | II nd Year | 164.03 | Cubic metre | |
| 320 | 320 | III rd Year | 164.03 | Cubic metre | |
| 321 | 321 | IV th Year | 164.03 | Cubic metre | |
| 322 | 322 | V th Year | 164.03 | Cubic metre | |
| 323 | 323 | Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for clearing the vent way of CD works. (Morth No. 111, 112, 301, 305,900) | 1 | Square metre | |
| 324 | 324 | I st Year | 2 | Hours | |
| 325 | 325 | II nd Year | 2 | Hours | |
| 326 | 326 | III rd Year | 2 | Hours | |
| 327 | 327 | IV th Year | 2 | Hours | |
| 328 | 328 | V th Year | 2 | Hours | |
| 329 | 329 | Painting the existing HM & KM stone as per IRC standard and painting culverts for numbering including the cost of Labour charges and material etc., complete | 1 | Square metre | |
| 330 | 330 | I st Year | 3.72 | Square metre | |
| 331 | 331 | II nd Year | 3.72 | Square metre | |
| 332 | 332 | III rd Year | 3.72 | Square metre | |
| 333 | 333 | IV th Year | 3.72 | Square metre | |
| 334 | 334 | V th Year | 3.72 | Square metre | |
| 335 | 335 | Lettering the existing KM stone 10 CM as per IRC standard including the cost of labour charges and material etc., complete | 1 | Square metre | |
| 336 | 336 | I st Year | 48 | Numbers | |
| 337 | 337 | II nd Year | 48 | Numbers | |
| 338 | 338 | III rd Year | 48 | Numbers | |
| 339 | 339 | IV th Year | 48 | Numbers | |
| 340 | 340 | V th Year | 48 | Numbers | |
| 341 | 341 | Lettering the existing KM stone 15 CM as per IRC standard including the cost of labour charges and material etc., complete | 1 | Square metre | |
| 342 | 342 | I st Year | 12 | Numbers | |
| 343 | 343 | II nd Year | 12 | Numbers | |
| 344 | 344 | III rd Year | 12 | Numbers | |
| 345 | 345 | IV th Year | 12 | Numbers | |
| 346 | 346 | V th Year | 12 | Numbers | |
| 347 | 347 | Lettering the existing HM stone 10 cm as per IRC standard including the cost of labour charges and material etc., complete | 1 | Square metre | |
| 348 | 348 | I st Year | 22 | Numbers | |
| 349 | 349 | II nd Year | 22 | Numbers | |
| 350 | 350 | III rd Year | 22 | Numbers | |
| 351 | 351 | IV th Year | 22 | Numbers | |
| 352 | 352 | V th Year | 22 | Numbers | |
| 353 | 353 | Lettering the existing HM stone 15 cm as per IRC standard including the cost of labour charges and material etc., complete | 1 | Square metre | |
| 354 | 354 | I st Year | 44 | Numbers | |
| 355 | 355 | II nd Year | 44 | Numbers | |
| 356 | 356 | III rd Year | 44 | Numbers | |
| 357 | 357 | IV th Year | 44 | Numbers | |
| 358 | 358 | V th Year | 44 | Numbers | |
| 359 | 359 | White washing over the existing Culverts, Parapet, avenue and Guide post including cost of materials and labour charges etc, complete | 1 | Square metre | |
| 360 | 360 | I st Year | 13.4 | Square metre | |
| 361 | 361 | II nd Year | 13.4 | Square metre | |
| 362 | 362 | III rd Year | 13.4 | Square metre | |
| 363 | 363 | IV th Year | 13.4 | Square metre | |
| 364 | 364 | V th Year | 13.4 | Square metre | |
| 365 | 365 | Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 - over bituminous surfaces (Morth No. 111, 112, 501, 502, 900) | 1 | Square metre | |
| 366 | 366 | IV th Year | 294 | Square metre | |
| 367 | 367 | V th Year | 489 | Square metre | |
| 368 | 368 | Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment,rolled as per clause 501.6 and 501.7 to achieve the desired compaction as per clause No. 507 of MORTH Specification complete in all respects - Grading II\n(Morth No. 111, 112, 501, 507,900) | 1 | Square metre | |
| 369 | 369 | IV th Year | 8.79 | Cubic metre | |
| 370 | 370 | V th Year | 14.64 | Cubic metre | |
| 371 | 371 | UPKEEPING ROAD F | 1 | Square metre | |
| 372 | 372 | Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer, as per MORTH Specification. Making up berms\n(Morth No. 111, 112, 301, 305,900) | 1 | Square metre | |
| 373 | 373 | I st Year | 28.5 | Cubic metre | |
| 374 | 374 | II nd Year | 28.5 | Cubic metre | |
| 375 | 375 | III rd Year | 28.5 | Cubic metre | |
| 376 | 376 | IV th Year | 28.5 | Cubic metre | |
| 377 | 377 | V th Year | 28.5 | Cubic metre | |
| 378 | 378 | Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for clearing the vent way of CD works. (Morth No. 111, 112, 301, 305,900) | 1 | Square metre | |
| 379 | 379 | I st Year | 1 | Hours | |
| 380 | 380 | II nd Year | 1 | Hours | |
| 381 | 381 | III rd Year | 1 | Hours | |
| 382 | 382 | IV th Year | 1 | Hours | |
| 383 | 383 | V th Year | 1 | Hours | |
| 384 | 384 | Painting the existing HM & KM stone as per IRC standard and painting culverts for numbering including the cost of Labour charges and material etc., complete | 1 | Square metre | |
| 385 | 385 | I st Year | 0.19 | Square metre | |
| 386 | 386 | II nd Year | 0.19 | Square metre | |
| 387 | 387 | III rd Year | 0.19 | Square metre | |
| 388 | 388 | IV th Year | 0.19 | Square metre | |
| 389 | 389 | V th Year | 0.19 | Square metre | |
| 390 | 390 | Lettering the existing HM stone 10 cm as per IRC standard including the cost of labour charges and material etc., complete | 1 | Square metre | |
| 391 | 391 | I st Year | 2 | Numbers | |
| 392 | 392 | II nd Year | 2 | Numbers | |
| 393 | 393 | III rd Year | 2 | Numbers | |
| 394 | 394 | IV th Year | 2 | Numbers | |
| 395 | 395 | V th Year | 2 | Numbers | |
| 396 | 396 | Lettering the existing HM stone 15 cm as per IRC standard including the cost of labour charges and material etc., complete | 1 | Square metre | |
| 397 | 397 | I st Year | 4 | Numbers | |
| 398 | 398 | II nd Year | 4 | Numbers | |
| 399 | 399 | III rd Year | 4 | Numbers | |
| 400 | 400 | IV th Year | 4 | Numbers | |
| 401 | 401 | V th Year | 4 | Numbers | |
| 402 | 402 | White washing over the existing Culverts, Parapet, avenue and Guide post including cost of materials and labour charges etc, complete | 1 | Square metre | |
| 403 | 403 | I st Year | 6.7 | Square metre | |
| 404 | 404 | II nd Year | 6.7 | Square metre | |
| 405 | 405 | III rd Year | 6.7 | Square metre | |
| 406 | 406 | IV th Year | 6.7 | Square metre | |
| 407 | 407 | V th Year | 6.7 | Square metre | |
| 408 | 408 | Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 - over bituminous surfaces (Morth No. 111, 112, 501, 502, 900) | 1 | Square metre | |
| 409 | 409 | IV th Year | 23 | Square metre | |
| 410 | 410 | V th Year | 38 | Square metre | |
| 411 | 411 | Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment,rolled as per clause 501.6 and 501.7 to achieve the desired compaction as per clause No. 507 of MORTH Specification complete in all respects - Grading II\n(Morth No. 111, 112, 501, 507,900) | 1 | Square metre | |
| 412 | 412 | IV th Year | 0.68 | Cubic metre | |
| 413 | 413 | V th Year | 1.13 | Cubic metre | |
| 414 | 414 | UPKEEPING ROAD G | 1 | Square metre | |
| 415 | 415 | Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer, as per MORTH Specification. Making up berms\n(Morth No. 111, 112, 301, 305,900) | 1 | Square metre | |
| 416 | 416 | I st Year | 232.5 | Cubic metre | |
| 417 | 417 | II nd Year | 232.5 | Cubic metre | |
| 418 | 418 | III rd Year | 232.5 | Cubic metre | |
| 419 | 419 | IV th Year | 232.5 | Cubic metre | |
| 420 | 420 | V th Year | 232.5 | Cubic metre | |
| 421 | 421 | Excavation includuing removal and satisfactory disposal of all materials necessary for construction of roadway and side Drains in accordance with the specfications and lines , grades and cross sections shown in the drawings or as indicated by the Engineer. For Forming Earthern Drain (Once a year) (Morth No. 111, 112, 301, 305,900) | 1 | Square metre | |
| 422 | 422 | I st Year | 86.57 | Cubic metre | |
| 423 | 423 | II nd Year | 86.57 | Cubic metre | |
| 424 | 424 | IIII rd Year | 86.57 | Cubic metre | |
| 425 | 425 | IV th Year | 86.57 | Cubic metre | |
| 426 | 426 | V th Year | 86.57 | Cubic metre | |
| 427 | 427 | Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for clearing the vent way of CD works. (Morth No. 111, 112, 301, 305,900) | 1 | Square metre | |
| 428 | 428 | I st Year | 4 | Hours | |
| 429 | 429 | II nd Year | 4 | Hours | |
| 430 | 430 | III rd Year | 4 | Hours | |
| 431 | 431 | IV th Year | 4 | Hours | |
| 432 | 432 | V th Year | 4 | Hours | |
| 433 | 433 | Painting the existing HM & KM stone as per IRC standard and painting culverts for numbering including the cost of Labour charges and material etc., complete | 1 | Square metre | |
| 434 | 434 | I st Year | 2.15 | Square metre | |
| 435 | 435 | II nd Year | 2.15 | Square metre | |
| 436 | 436 | III rd Year | 2.15 | Square metre | |
| 437 | 437 | IV th Year | 2.15 | Square metre | |
| 438 | 438 | V th Year | 2.15 | Square metre | |
| 439 | 439 | Lettering the existing KM stone 10 CM as per IRC standard including the cost of labour charges and material etc., complete | 1 | Square metre | |
| 440 | 440 | I st Year | 20 | Numbers | |
| 441 | 441 | II nd Year | 20 | Numbers | |
| 442 | 442 | III rd Year | 20 | Numbers | |
| 443 | 443 | IV th Year | 20 | Numbers | |
| 444 | 444 | V th Year | 20 | Numbers | |
| 445 | 445 | Lettering the existing KM stone 15 CM as per IRC standard including the cost of labour charges and material etc., complete | 1 | Square metre | |
| 446 | 446 | I st Year | 6 | Numbers | |
| 447 | 447 | II nd Year | 6 | Numbers | |
| 448 | 448 | III rd Year | 6 | Numbers | |
| 449 | 449 | IV th Year | 6 | Numbers | |
| 450 | 450 | V th Year | 6 | Numbers | |
| 451 | 451 | Lettering the existing HM stone 10 cm as per IRC standard including the cost of labour charges and material etc., complete | 1 | Square metre | |
| 452 | 452 | I st Year | 14 | Numbers | |
| 453 | 453 | II nd Year | 14 | Numbers | |
| 454 | 454 | III rd Year | 14 | Numbers | |
| 455 | 455 | IV th Year | 14 | Numbers | |
| 456 | 456 | V th Year | 14 | Numbers | |
| 457 | 457 | Lettering the existing HM stone 15 cm as per IRC standard including the cost of labour charges and material etc., complete | 1 | Square metre | |
| 458 | 458 | I st Year | 28 | Numbers | |
| 459 | 459 | II nd Year | 28 | Numbers | |
| 460 | 460 | III rd Year | 28 | Numbers | |
| 461 | 461 | IV th Year | 28 | Numbers | |
| 462 | 462 | V th Year | 28 | Numbers | |
| 463 | 463 | White washing over the existing Culverts, Parapet, avenue and Guide post including cost of materials and labour charges etc, complete | 1 | Square metre | |
| 464 | 464 | I st Year | 26.8 | Square metre | |
| 465 | 465 | II nd Year | 26.8 | Square metre | |
| 466 | 466 | III rd Year | 26.8 | Square metre | |
| 467 | 467 | IV th Year | 26.8 | Square metre | |
| 468 | 468 | V th Year | 26.8 | Square metre | |
| 469 | 469 | Tree banding - White washing with freshly burnt shell lime including cost of fresh lime with suitable colour agent has to be done around the entire circumference of the trees to a hight of 0.9M consisting of 3 strips. White Washing to be start at a hight of 0.7M from the ground level such that the banding will be sufficiently visible to the driver seated at the height of 1.5M from the ground level. the cost inclusive of all materials, brushes and labours. Tree banding to be done as prescribed in the drawing or as directed by the Engineer incharge, as per MoRTH specification | 1 | Square metre | |
| 470 | 470 | I st Year | 18.36 | Square metre | |
| 471 | 471 | II nd Year | 18.36 | Square metre | |
| 472 | 472 | III rd Year | 18.36 | Square metre | |
| 473 | 473 | IV th Year | 18.36 | Square metre | |
| 474 | 474 | V th Year | 18.36 | Square metre | |
| 475 | 475 | Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 - over bituminous surfaces (Morth No. 111, 112, 501, 502, 900) | 1 | Square metre | |
| 476 | 476 | IV th Year | 181 | Square metre | |
| 477 | 477 | V th Year | 301 | Square metre | |
| 478 | 478 | Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment,rolled as per clause 501.6 and 501.7 to achieve the desired compaction as per clause No. 507 of MORTH Specification complete in all respects - Grading II\n(Morth No. 111, 112, 501, 507,900) | 1 | Square metre | |
| 479 | 479 | IV th Year | 5.41 | Cubic metre | |
| 480 | 480 | V th Year | 9.01 | Cubic metre | |
| 481 | 481 | UPKEEPING ROAD H | 1 | Square metre | |
| 482 | 482 | Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer, as per MORTH Specification. Making up berms\n(Morth No. 111, 112, 301, 305,900) | 1 | Square metre | |
| 483 | 483 | I st Year | 85.5 | Cubic metre | |
| 484 | 484 | II nd Year | 85.5 | Cubic metre | |
| 485 | 485 | III rd Year | 85.5 | Cubic metre | |
| 486 | 486 | IV th Year | 85.5 | Cubic metre | |
| 487 | 487 | V th Year | 85.5 | Cubic metre | |
| 488 | 488 | Excavation includuing removal and satisfactory disposal of all materials necessary for construction of roadway and side Drains in accordance with the specfications and lines , grades and cross sections shown in the drawings or as indicated by the Engineer. For Forming Earthern Drain (Once a year) (Morth No. 111, 112, 301, 305,900) | 1 | Square metre | |
| 489 | 489 | I st Year | 13.1 | Cubic metre | |
| 490 | 490 | II nd Year | 13.1 | Cubic metre | |
| 491 | 491 | IIII rd Year | 13.1 | Cubic metre | |
| 492 | 492 | IV th Year | 13.1 | Cubic metre | |
| 493 | 493 | V th Year | 13.1 | Cubic metre | |
| 494 | 494 | Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for clearing the vent way of CD works. (Morth No. 111, 112, 301, 305,900) | 1 | Square metre | |
| 495 | 495 | I st Year | 2 | Hours | |
| 496 | 496 | II nd Year | 2 | Hours | |
| 497 | 497 | III rd Year | 2 | Hours | |
| 498 | 498 | IV th Year | 2 | Hours | |
| 499 | 499 | V th Year | 2 | Hours | |
| 500 | 500 | Painting the existing HM & KM stone as per IRC standard and painting culverts for numbering including the cost of Labour charges and material etc., complete | 1 | Square metre | |
| 501 | 501 | I st Year | 1.2 | Square metre | |
| 502 | 502 | II nd Year | 1.2 | Square metre | |
| 503 | 503 | III rd Year | 1.2 | Square metre | |
| 504 | 504 | IV th Year | 1.2 | Square metre | |
| 505 | 505 | V th Year | 1.2 | Square metre | |
| 506 | 506 | Lettering the existing KM stone 10 CM as per IRC standard including the cost of labour charges and material etc., complete | 1 | Square metre | |
| 507 | 507 | I st Year | 22 | Numbers | |
| 508 | 508 | II nd Year | 22 | Numbers | |
| 509 | 509 | III rd Year | 22 | Numbers | |
| 510 | 510 | IV th Year | 22 | Numbers | |
| 511 | 511 | V th Year | 22 | Numbers | |
| 512 | 512 | Lettering the existing KM stone 15 CM as per IRC standard including the cost of labour charges and material etc., complete | 1 | Square metre | |
| 513 | 513 | I st Year | 6 | Numbers | |
| 514 | 514 | II nd Year | 6 | Numbers | |
| 515 | 515 | III rd Year | 6 | Numbers | |
| 516 | 516 | IV th Year | 6 | Numbers | |
| 517 | 517 | V th Year | 6 | Numbers | |
| 518 | 518 | Lettering the existing HM stone 10 cm as per IRC standard including the cost of labour charges and material etc., complete | 1 | Square metre | |
| 519 | 519 | I st Year | 4 | Numbers | |
| 520 | 520 | II nd Year | 4 | Numbers | |
| 521 | 521 | III rd Year | 4 | Numbers | |
| 522 | 522 | IV th Year | 4 | Numbers | |
| 523 | 523 | V th Year | 4 | Numbers | |
| 524 | 524 | Lettering the existing HM stone 15 cm as per IRC standard including the cost of labour charges and material etc., complete | 1 | Square metre | |
| 525 | 525 | I st Year | 8 | Numbers | |
| 526 | 526 | II nd Year | 8 | Numbers | |
| 527 | 527 | III rd Year | 8 | Numbers | |
| 528 | 528 | IV th Year | 8 | Numbers | |
| 529 | 529 | V th Year | 8 | Numbers | |
| 530 | 530 | White washing over the existing Culverts, Parapet, avenue and Guide post including cost of materials and labour charges etc, complete | 1 | Square metre | |
| 531 | 531 | I st Year | 13.4 | Square metre | |
| 532 | 532 | II nd Year | 13.4 | Square metre | |
| 533 | 533 | III rd Year | 13.4 | Square metre | |
| 534 | 534 | IV th Year | 13.4 | Square metre | |
| 535 | 535 | V th Year | 13.4 | Square metre | |
| 536 | 536 | Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 - over bituminous surfaces (Morth No. 111, 112, 501, 502, 900) | 1 | Square metre | |
| 537 | 537 | IV th Year | 68 | Square metre | |
| 538 | 538 | V th Year | 113 | Square metre | |
| 539 | 539 | Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment,rolled as per clause 501.6 and 501.7 to achieve the desired compaction as per clause No. 507 of MORTH Specification complete in all respects - Grading II\n(Morth No. 111, 112, 501, 507,900) | 1 | Square metre | |
| 540 | 540 | IV th Year | 2.03 | Cubic metre | |
| 541 | 541 | V th Year | 3.38 | Cubic metre | |
| 542 | 542 | SUB ESTIMATE - RETAINING WALL | 1 | Square metre | |
| 543 | 543 | Earthwork excavation in all classes of soils except hard rock requiring, blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, Trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials, etc, complete as per standard specification for foundation.\n(Morth No. 111, 112, 304) | 1 | Square metre | |
| 544 | 544 | Road A | 327.36 | Cubic metre | |
| 545 | 545 | Road B | 314.16 | Cubic metre | |
| 546 | 546 | Road I | 545.6 | Cubic metre | |
| 547 | 547 | Vibrated Cement Concrete (M15) mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, complying to the required standard and specifications including cost and formwork, mixing, laying, compacting using vibrator including hire and fuel charges for all tools and plants engaged in curing and all other incidental charges such as bailing out water wherever necessary forming protective bunds coffer dams etc., complete Levelling course For Foundation of RETAINING WALL below sill level (Morth No. 111, 112, 1000, 1500, 1700, 2200 , 900) | 1 | Square metre | |
| 548 | 548 | Road A | 282.72 | Cubic metre | |
| 549 | 549 | Road B | 271.32 | Cubic metre | |
| 550 | 550 | Road I | 467.48 | Cubic metre | |
| 551 | 551 | Vibrated Cement Concrete (M15) mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, complying to the required standard and specifications including cost and formwork, mixing, laying, compacting using vibrator including hire and fuel charges for all tools and plants engaged in curing and all other incidental charges such as bailing out water wherever necessary forming protective bunds coffer dams etc., complete Levelling course For Foundation of RETAINING WALL above sill level (Morth No. 111, 112, 1000, 1500, 1700, 2200 , 900) | 1 | Square metre | |
| 552 | 552 | Road A | 277.6 | Cubic metre | |
| 553 | 553 | Road B | 261.8 | Cubic metre | |
| 554 | 554 | Road I | 272.8 | Cubic metre | |
| 555 | 555 | Refilling behind body wall using foundation earth including cost and conveyance of of all materials to worksite including labour charges for filling laying compacting by manual labour under optimum moisture content to get the maximum density flooding with water as layers inclusive and all other incidental charges etc., complete For Retaining wall. (Morth No. 304, 900) | 1 | Square metre | |
| 556 | 556 | Road A | 541.88 | Cubic metre | |
| 557 | 557 | Road I | 114.7 | Cubic metre | |
| 558 | 558 | Providing and fixing seepage pipes of 150mm dia. PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900mm dia. semi-spherical back fill arrangements with 100mm size broken granite chips at the periphery and labour charges for fixing, etc., to drain of the backfill IN RETAINING WALLS. (Morth No. 111, 112, 1000, 1500, 1700, 2200 , 900) | 1 | Square metre | |
| 559 | 559 | Road A | 60 | Running Metre | |
| 560 | 560 | Road B | 119 | Running Metre | |
| 561 | 561 | Road I | 124 | Running Metre | |
| 562 | 562 | Refilling behind body wall using foundation earth including cost and conveyance of of all materials to worksite including labour charges for filling laying compacting by manual labour under optimum moisture content to get the maximum density flooding with water as layers inclusive and all other incidental charges etc., complete FOR RETAINIG WALL (Morth No. 304, 900) | 1 | Square metre | |
| 563 | 563 | Road A | 327.36 | Cubic metre | |
| 564 | 564 | Road B | 314.16 | Cubic metre | |
| 565 | 565 | Road I | 545.6 | Cubic metre | |
| 566 | 566 | Supply and fixing of RCC guide post of size 0.20 x 0.20 x 1.20m using vibrated RCC 1:2:4 mix using 20mm ISS HBG metal and fixing 0.50m below GL and side packing with CC 1:3:6 using 40mm HBG metal including cost and conveyance of all materials to site including moulding and fixing charges and other incidental charge etc. complete. | 1 | Square metre | |
| 567 | 567 | Road A | 40 | Numbers | |
| 568 | 568 | Road B | 34 | Numbers | |
| 569 | 569 | Road I | 62 | Numbers | |
| 570 | 570 | SUB ESTIMATE - SLAB CULVERT | 1 | Square metre | |
| 571 | 571 | Earthwork excavation in all classes of soils except hard rock requiring, blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, Trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials, etc, complete as per standard specification for foundation.\n(Morth No. 111, 112, 304) | 1 | Square metre | |
| 572 | 572 | Road A | 283.8 | Cubic metre | |
| 573 | 573 | Road J | 359.72 | Cubic metre | |
| 574 | 574 | Vibrated Cement Concrete M15 Grade using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for formwork and centering, labour charges, compacting, curing, and all incidental charges etc., complete for FOUNDATION OF ABUTMENTS, WINGS AND PIERS BELOW SILL LEVEL (Morth No. 111, 112, 1000, 1500, 1700, 2200 , 900) | 1 | Square metre | |
| 575 | 575 | Road A | 206.6 | Cubic metre | |
| 576 | 576 | Road J | 291.45 | Cubic metre | |
| 577 | 577 | Vibrated Cement Concrete M15 Grade using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for formwork and centering, labour charges, compacting, curing, and all incidental charges etc., complete for SUBSTRUCTURE OF ABUTMENTS, WINGS AND PIERS ABOVE SILL LEVEL (Morth No. 111, 112, 1000, 1500, 1700, 2200 , 900) | 1 | Square metre | |
| 578 | 578 | Road A | 59 | Cubic metre | |
| 579 | 579 | Road J | 183.95 | Cubic metre | |
| 580 | 580 | Vibrated Reinforced Cement Concrete (Design Mix) M25 using crushed ISS size HBG graded metal of including cost and conveyance of all materials to site but excluding cost and fabrication of steel but including cost and labour charges for formwork and centering, labour charges for compacting, finishing and curing including all incidental charges etc., completed for BED BLOCK ,OVER PIER AND DIRT WALL CUM BED BLOCK OVER ABUTMENT (Morth No. 111, 112, 1000, 1500, 1600, 1700, 2700, 900) | 1 | Square metre | |
| 581 | 581 | Road A | 12.6 | Cubic metre | |
| 582 | 582 | Road J | 10.79 | Cubic metre | |
| 583 | 583 | Vibrated Reinforced Cement Concrete (Design Mix) M25 using crushed ISS size HBG graded metal of including cost and conveyance of all materials to site but excluding cost and fabrication of steel but including cost and labour charges for formwork and centering, labour charges for formwork and centering, labour charges for compacting, finishing and curing including all incidental charges etc., completed for DECK SLAB,KERB (Morth No. 111, 112, 1000, 1500, 1600, 1700, 2700, 900) | 1 | Square metre | |
| 584 | 584 | Road A | 16.8 | Cubic metre | |
| 585 | 585 | Road J | 35.51 | Cubic metre | |
| 586 | 586 | Vibrated Cement Concrete M30 Grade (Design mix) Using IRC size hard granite metal including cost and conveyance of all materials to site cost of premoulded expansion joints and fixing the same in position including cost and labour charges for formwork, labour charges for laying compacting curing, including all incidental charges etc., complete for WEARING COAT 75MM uniform thickness OVER DECK SLAB AND APPROACH SLAB (Morth No. 111, 112, 1000, 1500, 1700, 2200 , 900) | 1 | Square metre | |
| 587 | 587 | Road A | 62.8 | Square metre | |
| 588 | 588 | Road J | 76.14 | Square metre | |
| 589 | 589 | Providing and fixing kraft paper for full width of seating of deck spab and including cost and conveyance to worksite labour for fixing the same in correct position and all other incidental charges etc. complete. (Morth No. 2600) | 1 | Square metre | |
| 590 | 590 | Road A | 16 | Square metre | |
| 591 | 591 | Road J | 12.6 | Square metre | |
| 592 | 592 | Supply and fabrication of steel Grade Fe-415 required for all RCC items of works involved in the schedule including cost of steel cost of fabrication labour charges for cleaning the bars straightening cutting bending tying grills hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire provision of spacer bars, cover blocks and all other incidental charges etc. complete as per standard specification FOR SLAB CULVERT | 1 | Square metre | |
| 593 | 593 | Road A | 2.2 | Metric Tonne | |
| 594 | 594 | Road J | 3.01 | Metric Tonne | |
| 595 | 595 | Providing and fixing 20mm thick PVC expansion joint including cost and conveyance of expansion joints, Shalimar pad and joint sealants and fixing them position etc. Complete in deck slab over abutment. (Morth No. 2600, 900) | 1 | Square metre | |
| 596 | 596 | Road A | 50 | Running Metre | |
| 597 | 597 | Road J | 25 | Running Metre | |
| 598 | 598 | Providing and fixing seepage pipes of 150mm dia. PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900mm dia. semi-spherical back fill arrangements with 100mm size broken granite chips at the periphery and labour charges for fixing, etc., to drain of the backfill IN RETAINING WALLS. (Morth No. 111, 112, 1000, 1500, 1700, 2200 , 900) | 1 | Square metre | |
| 599 | 599 | Road A | 64 | Numbers | |
| 600 | 600 | Road J | 38 | Numbers | |
| 601 | 601 | Refilling behind body wall using foundation earth including cost and conveyance of of all materials to worksite including labour charges for filling laying compacting by manual labour under optimum moisture content to get the maximum density flooding with water as layers inclusive and all other incidental charges etc., complete For Slab culvert (Morth No. 304, 900) | 1 | Square metre | |
| 602 | 602 | Road A | 50.16 | Cubic metre | |
| 603 | 603 | Road J | 46.69 | Cubic metre | |
| 604 | 604 | Refilling behind bodywall with Carted earth including cost and conveyance of all materials to worklsite including labour charges for filling laying compacting by manual labour under optimum moisture content to get the maximum densoity flooding with water as layers inclusive and all other incidental charges etc., complete for Retaining wall (Morth No. 304, 900) | 1 | Square metre | |
| 605 | 605 | Road J | 27.45 | Cubic metre | |
| 606 | 606 | Calculation of SubTotal, GST and Total Amount carried out by system automatically | |||
| 607 | 607 | Basic cost of value put to tender as per estimate | 1 | (A) | |
| 608 | 608 | Add GST at 12% | 1 | (B) | |
| 609 | 609 | Total Value put to Tender | 1 | (A+B) | |
| 610 | 610 | Differnce Amount (Excess/less) | 1 | (D) | |
| 611 | 611 | Quoted Amount (Basic Rate Only) | 1 | (E) | |
| 612 | 612 | Add GST at 12% of Quoted Amount | 1 | (F) | |
| 613 | 613 | Total Value of Quoted Amount including 12% of GST | 1 | (E+F) |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents