Improvement Of Road Sh248 To Limbala Tanda Tandulwadi Bodkhapati Bramhn Chikhalgar Hudi Limbala Wadhiwara Odr 22 Km 12/00 To 14/00 Tq . Sengaon Dist . Hingoli
Tender Value
33.92 Lakhs
Estimated cost
Bid Submission
11 Sep 2019
0 days left
EMD
34000
Bank guarantee accepted
Document Fee
2000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Sengaon → Maharashtra
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Improvement Of Road Sh248 To Limbala Tanda Tandulwadi Bodkhapati Bramhn Chikhalgar Hudi Limbala Wadhiwara Odr 22 Km 12/00 To 14/00 Tq . Sengaon Dist . Hingoli
BOQ
| Name of Work : Improvement of road from SH 248 to LimbalaTanda Tandulwadi BodkhaPati Bramhawadi Chikhalagar Hudi Limbala Wadhiwara Road ODR 22 KM 12/00 to 14/00 Tq. Sengaon Dist. Hingoli | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area .(Item No. 2.07) | BI01010001010000000000000515BI0100001113 | 9000 | CuM |
| 2 | 2 | Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils. SSR 2018-19 ,( Item No.2.18) | BI01010001010000000000000515BI0100001114 | 2700 | CuM |
| 3 | 3 | Watering and compacting of embankment formed of materials obtained from the road cutting within a lead of 50 m, not less than 97% of standard Proctor density after laying them in layers of 20 cm. to 30 cm. with Power roller.(Item No. 2.24) | BI01010001010000000000000515BI0100001115 | 2430 | CuM |
| 4 | 4 | Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a)80 mm Metal, By breaking Boulders (Hand broken).( ItemNo. 50.56) | BI01010001010000000000000515BI0100001116 | 577.13 | CuM |
| 5 | 5 | Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a)40 mm Metal, By breaking Boulders (Hand broken). ( Item No. 50.57) | BI01010001010000000000000515BI0100001117 | 356.25 | CuM |
| 6 | 6 | Supplying hard murum/ kankar at the road site, including conveying and stacking complete. SSR 2018-19 ,Item No.2.29a | BI01010001010000000000000515BI0100001118 | 1578.38 | CuM |
| 7 | 7 | Supplying soft murum at the road site, including conveying and stacking complete.SSR 2018-19 ,Item No.2.29b | BI01010001010000000000000515BI0100001119 | 118.75 | CuM |
| 8 | 8 | Spreading 80/40 mm metal for road work including sectionong etc complete as directed by Engineer in charge . (Item No. 50.58) | BI01010001010000000000000515BI0100001120 | 933.38 | CuM |
| 9 | 9 | Spreading hard murum/ soft murrum/ gravel or kankar for side width complete.SSR 2018-19 ,Item No.2.30 | BI01010001010000000000000515BI0100001121 | 1697.13 | CuM |
| 10 | 10 | Compacting the sub grade/gravel/oversize metal (200 mm loose) layers for all width with Power roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete. (Item No. 50.59) | BI01010001010000000000000515BI0100001122 | 3847.5 | SqM |
| 11 | 11 | Compacting the sub grade / gravel / size metal (100 mm loose) layers for all widths with Power roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete.40 MM Metal ( Item No. 50.61) | BI01010001010000000000000515BI0100001123 | 3562.5 | CuM |
| 12 | 12 | Compacting the hard murum side widths including laying in layers on each side with vibratory roller including artificial watering etc.complete. SSR 2018-19 ,Item No.2.31 | BI01010001010000000000000515BI0100001124 | 7215 | CuM |
| 13 | 13 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge (Item No. No. 6.36) | BI01010001010000000000000515BI0100001125 | 1 | No |
| 14 | 14 | Add Royalty | BI01010001010000000000000515BI0100001126 | 2630.51 | CuM |
| 15 | 15 | Testing Charges 80MM GrDtion | BI01010001010000000000000515BI0100001127 | 2 | No |
| 16 | 16 | Crushing value compressieve strength etc. | BI01010001010000000000000515BI0100001128 | 1 | No |
| 17 | 17 | 40 MM Metal Gradation | BI01010001010000000000000515BI0100001129 | 2 | No |
| 18 | 18 | HM Sieve analysis | BI01010001010000000000000515BI0100001130 | 6 | No |
| 19 | 19 | LL & PL | BI01010001010000000000000515BI0100001131 | 1 | No |
| 20 | 20 | soft Murum Sieve analysis | BI01010001010000000000000515BI0100001132 | 2 | No |
| 21 | 21 | Add Insurance | BI01010001010000000000000515BI0100001133 | 1 | No |
| 22 | 22 | Add GST 12% | BI01010001010000000000000515BI0100001134 | 1 | No |
AI Tender Summary
Tender Timeline
Sep 05, 2019
11:30 IST
Tender Published
Tender notice published.
CompletedSep 11, 2019
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedSep 12, 2019
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender