| 1 | 1 | DO & AO Office Building at Barauni (approx Area 2258 SqM + Stilt Area) | b1 | | |
|---|
| 2 | 1.01 | Part-1 Architectural and Detailed Design of Office Building | b2 | | |
|---|
| 3 | 1.02 | Charges towards Architectural, Interior, HVAC, Mechanical, Electrical, Plumbing, Project Management and Associated Consultancy Services ( except supervision ) as per the detailed scope of services defined in the Tender Document. The scope of works includes but not limited to the following:- a. Detailed Design of Engery Efficient Green Building with all facilities, drawings, \nb. Estimates, rate analysis, data collection, \nc. preparation of tender documents for various tender packages, specifications, assessment of material requirements,\nd. QAP for all packages/works, assisting IOC in evaluation of tenders and placement of purchase orders,\ne. preparation of detailed construction drawings, \nf. approval of construction drawings submitted by the contractors, \ng. progress monitoring, conducting monthly safety audits, \nh. furnishing & supporting with details and drawings required for statutory approvals, inspections, documentations and close out report etc. | b3 | 1 | LS |
|---|
| 4 | 1.03 | Part-2 Site Supervision | b4 | | |
|---|
| 5 | 1.04 | Charges towards site supervision of construction of works at site including providing experienced site engineers and Site In Charge on monthly basis. The charges include all activities to be performed as per scope of services defined. | b5 | | |
|---|
| 6 | 1.05 | Site Incharge (Project Manager) with experience : Note: a) 1 Engineer per month shall be taken as 1 man-month. It is proposed to engage 1 Engineer exclusively as project in charge during project construction. b) In case, the works are completed during part of month, payment shall be made pro rata for the month considering that the month shall comprise of 30 days. c) The charges shall include boarding, lodging, air/rail/road transportation, insurance, local conveyance, communication, stationery & all other incidentals required for performance of the site supervision activity as per scope of services defined. \n\n | b6 | 15 | Man-Month |
|---|
| 7 | 1.06 | Site Engineers (Civil/Electrical) with experience\nNote: a) 1 Engineer per calender month( 30 days) shall be taken as 1 man-month. It is proposed to engage 2 Engineers during project construction phase. In case, the works are completed during part of month, payment shall be made pro rata for the month considering that the month shall comprise of 30 days.\nb) The requirement of civil/ electricall engineers shall be suitably operated in such a way as to suit the project construction need. \nc) The charges shall include boarding, lodging, air/rail/road transportation, insurance, local conveyance, communication, stationery & all other incidentals required for performance of the site supervision activity as per scope of services defined. | b7 | 30 | Man-Month |
|---|
| 8 | 2 | DO & AO Office Building at Namkum, Dist- Ranchi (approx Area 2100 SqM + Stilt Area) | b8 | | |
|---|
| 9 | 2.01 | Part-1 Architectural and Detailed Design of Office Building | b9 | | |
|---|
| 10 | 2.02 | Charges towards Architectural, Interior, HVAC, Mechanical, Electrical, Plumbing, Project Management and Associated Consultancy Services ( except supervision ) as per the detailed scope of services defined in the Tender Document. The scope of works includes but not limited to the following:- a. Detailed Design of Engery Efficient Green Building with all facilities, drawings, \nb. Estimates, rate analysis, data collection, \nc. preparation of tender documents for various tender packages, specifications, assessment of material requirements,\nd. QAP for all packages/works, assisting IOC in evaluation of tenders and placement of purchase orders,\ne. preparation of detailed construction drawings, \nf. approval of construction drawings submitted by the contractors, \ng. progress monitoring, conducting monthly safety audits, \nh. furnishing & supporting with details and drawings required for statutory approvals, inspections, documentations and close out report etc. | b10 | 1 | LS |
|---|
| 11 | 2.03 | Part-2 Site Supervision | b11 | | |
|---|
| 12 | 2.04 | Charges towards site supervision of construction of works at site including providing experienced site engineers and Site In Charge on monthly basis. The charges include all activities to be performed as per scope of services defined. | b12 | | |
|---|
| 13 | 2.05 | Site Incharge (Project Manager) with experience : Note: a) 1 Engineer per month shall be taken as 1 man-month. It is proposed to engage 1 Engineer exclusively as project in charge during project construction. b) In case, the works are completed during part of month, payment shall be made pro rata for the month considering that the month shall comprise of 30 days. c) The charges shall include boarding, lodging, air/rail/road transportation, insurance, local conveyance, communication, stationery & all other incidentals required for performance of the site supervision activity as per scope of services defined. | b13 | 15 | Man-Month |
|---|
| 14 | 2.06 | Site Engineers (Civil/Electrical) with experience\nNote: a) 1 Engineer per calender month( 30 days) shall be taken as 1 man-month. It is proposed to engage 2 Engineers during project construction phase. In case, the works are completed during part of month, payment shall be made pro rata for the month considering that the month shall comprise of 30 days.\nb) The requirement of civil/ electricall engineers shall be suitably operated in such a way as to suit the project construction need. \nc) The charges shall include boarding, lodging, air/rail/road transportation, insurance, local conveyance, communication, stationery & all other incidentals required for performance of the site supervision activity as per scope of services defined. | b14 | 30 | Man-Month |
|---|