Providing And Construction Of Cement Concrete Road Various Places At . Jaisingpura In Ward No . 18 Near Idgah , Deshi Daru Dukan And Arab Khidki . , Excavation For Roadway In Earth , Soil Of All Sorts , Sand , Gravel Or Soft Murum Including Dressing Section To The Required Grade , Camber And Side Slopes And Conveying The Excavated Materials With All Lifts Upto A Lead Of 50M . And Spreading For Embankment Or Stacking As Directed . ( Ssr It . No . 2 . 11/2017-18 ) , Conveying Materials Obtained From Road Cutting Including All Lifts , Laying In Layers Of 20Cm To 30Cm . Breaking Clods , Dressing To The Required Lines , Curves , Grades And Section , Watering And Compacting To Not Less Than 97% Of Standard Proctor Density For A Lead Of Over 50M . To 300M . Inclusive From The Site Of Excavation To The Site Of Deposition As Directed . ( Ssr It . No . 2 . 25 /2017-18 ) Lead 3 . 00 Km , Construction Of Granular Sub-Base By Providing Close Graded Material , Spreading In Uniform Layers With Motor Grader / Paver On Prepared Surface , Mixing By Mix In Place Method With Rotavator At Omc , And Compacting With Vibratory Roller To Achieve The Desired Density , Complete As Per Clause 401 -- By Mix In Place Method And Grading - Ii Material ( Ssr It . No . 3 . 05/2017-18 ) , Providing And Laying In Situ Cement Concrete In M-10 /1 : 3 : 6 Of Trap/ Granite/ Quartzite/ Gneiss Metal For Foundation And Bedding Including Dewatering , Form Work , Compacting , Roughening Them If Special Finish Is To Be Provided , Finishing If Required And Curing Complete , With Fully Automatic Micro Processor Based Plc With Scada Enabled Reversible Drum Type Mixer/Concrete Batch Mix Plant ( Pan Mixer ) Etc . Complete . With Natural Sand/V . S . I . Quality Artificial Sand . ( Ssr It . No . 24 . 01/2017-18 ) , Providing And Laying In-Situ M30 Grade Unreinforced Plain Cement Concrete Pavement Over A Prepared Sub Base With 43 Grade Cement , Coarse And Fine Aggregate Conforming To Is 383 , Using Fine And Coarse Aggregates Combined Gradation As Per Table 600-3 Of Morth Specification 2013 , Mixed In A Batching And Mixing Plant/ Non Tilting Mixer And Weigh Batcher As Per Approved Mix Design , Admixtures , Transporting To Site , Spreading , Laying With Approved Make Paver , Compacted And Finished In A Continuous Operation , Finishing To Lines And Grades As Directed By Engineer-In-Charge And Curing By Curing Compound /By Providing Cement Vata In Cement Mortar 1:8 @0 . 6M X 0 . 6M Centre To Centre , Admeasuring 80 Mm At Bottom And 40 Mm At Top With Depth Of 75Mm And Maintaining The Same Throughout Curing Period By Any Other Method Approved By Engineer-In-Charge . ( Initial Lead Of 5 . 00 Km For Raw Materials Up To Plant Site ) Spec . No . Morth 2013 Cl-602 P . N . 263 Morth 602 5 . 03 Morth 602Ssr 2017-2018 Item No . 5 . 04 , Taking For Compressive Strength Of Cement Concrete Cube ( Set Of 3 Cubes ) Etc Complete Ssr Page No . 387 Sr . No . 25/2017-18 . , Testing For Takig Concrete Core Samples In Concrete Pavement ( Excluding Dead Journey Charges ) Etc Complete Ssr Page No . 387 Sr . 20 2017-18 . , Excavation For Foundation In Soft Rock And Old Cement Or Lime Masonry Foundations Including Removing The Excavated Material Upto A Distance Of 50 Metres Beyond The Building Area And Stacking As Directed , Including Dewatering , Preparing The Bed For The Foundation And Necessary Back Filling With Available Earth /Murum , Ramming , Watering Including Shoring And Strutting Etc . Complete ( Lift Upto 1 . 5M ) By Manual Means Bda 4 21 . 13 Bd . A . 4 Page No . 259 , Providing And Fixing Factory Made Hydraulically Pressed Mechanically Vibrated And Compacted Precast Inter Locking Cement Concrete Paving Blocks 100Mm Thick In M-40 ( Italian/Lacer Finish ) Grade Of Approved Size And Shape As Specified And As Per Is 15658:2006 Including Cost Of All Materials , Manufacturing , Curing , Transportation Of Blocks To Work Site Including Loading , Unloading And Stacking As Directed , Laying Paving Blocks In Position Over Prepared Bed Of Natural Sand / Crushed Sand Of 50 Mm Thickness Including Necessary Excavation In All Stratas , Spreading Blindge Of Fine Sand Over The Prepared Bed , Compacting Blocks By Plate Vibrator Etc . Complete . ( Ssr 2017-18 It . No . 5 . 21 ) 80 Mm Thk Paver Blocks In M 40 ( Indan/Lacar Finish ) , Raising The Existing Manhole Chamber With 23 Cm Thick Brick Work In Cm 1 : 5 Prop . In 30 Cm Concentrick Cone Includig 12 Mm Thik Cement Plaster In Cm 1 : 4 Prop On Both Side Complete . ( As Per Rate Analysis ) No . , Fixing Of Sfrc Frame And Cover To Manhole Chamber / Rectasngular S . F . R . C . Cover And Frame In C . C . M-15 ( Concrete 1 : 2 : 4 Prop . ) Etc . Complete . ( As Per Rate Analysis ) 22- Circular Hd 540/630 With Frame . , Supplying Hard Murum/ Kankar At The Road Site , Including Conveying And Stacking Complete . Ssr 2017-2018 Item No . 2 . 29 , Spreading Gravel Sand/Soft Murum / Hard Murum Etc . Complete As Directed By Engineer In Charge Rd-28 Page No . 205 ( Ssr . No . 2 . 30 )
BOQ
| Name of Work: Providing and Construction of Cement Concrete Road Various Places At. Jaisingpura in Ward No.18 Near Idgah, Deshi Daru Dukan and Arab Khidki. | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Excavation for roadway in earth, soil of all sorts, sand, gravel or soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m. and spreading for embankment or stacking as directed. (SSR It.No.2.11/2017-18) | 1 | 221.85 | Cum |
| 2 | 2 | Conveying materials obtained from road cutting including all lifts, laying in layers of 20cm to 30cm. breaking clods, dressing to the required lines, curves, grades and section, watering and compacting to not less than 97% of standard Proctor density for a lead of over 50m. to 300m. inclusive from the site of excavation to the site of deposition as directed. (SSR It.No.2.25 /2017-18) \nLead 3.00 Km\n | 2 | 221.85 | Cum |
| 3 | 3 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader / Paver on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 -- By Mix in Place Method and Grading - II Material (SSR It.No.3.05/2017-18 ) | 3 | 157.75 | Cum |
| 4 | 4 | Providing and laying in situ cement concrete in M-10 /1 : 3 : 6 of trap/ granite/ quartzite/ gneiss metal for foundation and bedding including dewatering, form work, compacting, roughening them if special finish is to be provided, finishing if required and curing complete, with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete. With natural sand/V.S.I. quality Artificial Sand. (SSR It.No.24.01/2017-18 ) | 4 | 147.75 | Cum |
| 5 | 5 | Providing and laying in-situ M30 Grade unreinforced plain cement concrete pavement over a prepared sub base with 43 grade cement , coarse and fine aggregate conforming to IS 383, using fine and coarse aggregates combined gradation as per Table 600-3 of MORTH Specification 2013, mixed in a batching and mixing plant/ non tilting mixer and Weigh batcher as per approved mix design, admixtures, transporting to site, spreading, laying with approved make paver,compacted and finished in a continuous operation, finishing to lines and grades as directed by Engineer-in-charge and curing by curing compound /by providing cement vata in cement Mortar 1:8 @0.6m X 0.6m centre to centre, admeasuring 80 mm at bottom and 40 mm at top with depth of 75mm and maintaining the same throughout curing period by any other method approved by Engineer-in-charge. ( initial Lead of 5.00 km for raw materials up to plant site) Spec. No. MORTH 2013 CL-602 P.N.263 MORTH 602 5.03 MORTH 602\nSSR 2017-2018 Item No. 5.04\n | 5 | 221.625 | Cum |
| 6 | 6 | Taking for Compressive strength of cement concrete cube (Set of 3 cubes) Etc Complete SSR Page No.387 Sr.no.25/2017-18. | 6 | 1 | Nos |
| 7 | 7 | Testing for takig concrete core Samples in Concrete Pavement (Excluding Dead Journey Charges) Etc Complete SSR Page No.387 Sr.20 2017-18. | 7 | 1 | Nos |
| 8 | 8 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth /murum, ramming, watering including shoring and strutting etc. complete (lift upto 1.5m) by Manual Means BDA 4 21.13 Bd.A.4 Page No.259 | 8 | 0.001 | Cum |
| 9 | 9 | Providing and fixing factory made Hydraulically pressed Mechanically vibrated and compacted precast inter locking cement concrete paving blocks 100MM thick in M-40 (ITALIAN/LACER FINISH ) grade of approved size and shape as specified and as per IS 15658:2006 including cost of all materials, manufacturing, curing, transportation of blocks to work site including loading, unloading and stacking as directed, laying paving blocks in position over prepared bed of natural sand / crushed sand of 50 mm thickness including necessary excavation in all stratas, spreading blindge of fine sand over the prepared bed, compacting blocks by plate vibrator etc. complete. (SSR 2017-18 It.No.5.21) 80 mm thk paver blocks in m 40 (indan/lacar finish) | 9 | 30 | Sqm |
| 10 | 10 | Raising the Existing manhole chamber with 23 cm thick brick work in cm 1 : 5 prop .in 30 cm concentrick cone includig 12 mm thik cement plaster in CM 1 : 4 prop on both side complete. (As per rate analysis ) No. | 10 | 9 | Nos |
| 11 | 11 | Fixing of SFRC frame and cover to manhole chamber / Rectasngular S.F.R.C. Cover and frame in C.C. M-15 (Concrete 1 : 2 : 4 prop .) etc. complete. (As per rate analysis) 22- Circular HD 540/630 with frame . | 11 | 7 | Nos |
| 12 | 12 | Supplying hard murum/ kankar at the road site, including conveying and stacking complete. SSR 2017-2018 ITEM NO. 2.29 | 12 | 147.5 | Cum |
| 13 | 13 | Spreading Gravel Sand/Soft Murum / hard Murum etc. Complete \nas directed by Engineer in charge Rd-28 Page No.205 (SSR.no.2.30)\n | 13 | 147.5 | Cum |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender