Madhyanchal Vidut Vitran Nigam Limited has published Work Of Annual Maintenance Of Machines , Oven And Testing Equipments At Transformer Repairing Workshop , Pilibhit Under Electricity Workshop Division-Bareilly. Submission Date for this Tender is 12-09-2019. Energy Meter Tenders in Pilibhit Uttar Pradesh. Bidders can get complete Tender details and download the document.
Name of Work: Annual Maintenance of machines, oven and testing equipments at Transformer Repairing Workshop, Pilibhit under Electricity Workshop Division Bareilly. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Electric Oven | |||
2 | 2 | Replacement of Burnt U Type Heater cap. 1.5 W | 4 | Nos. | |
3 | 3 | Replacement of Burnt U Type Heater cap. 2.0 W | 4 | Nos. | |
4 | 4 | Replacement of Contactor cap. 25 Amp. ISI Mark | 1 | Nos. | |
5 | 5 | Replacement of Contactor cap. 32 Amp. ISI Mark | 1 | Nos. | |
6 | 6 | Replacement of Contactor cap. 63 Amp. ISI Mark | 1 | Nos. | |
7 | 7 | Replacement Electric Wiring with 4 mm. Glass wire | 8 | Nos. | |
8 | 8 | Replacement of MCB 63 Amp. ISI Mark. | 1 | Nos. | |
9 | 9 | Single phase preventer (VSP 2) | 1 | Nos. | |
10 | 10 | Replacement of Temperature Controller | 1 | Nos. | |
11 | 11 | Replacement of Thermostate | 1 | Nos. | |
12 | 12 | Replacement of Indicator | 1 | Nos. | |
13 | 13 | Replacement of V-pulley | 1 | Nos. | |
14 | 14 | V.Belts for different sizes | 1 | Nos. | |
15 | 15 | DVDF | |||
16 | 16 | Rewinding of Rotor (3Ph Alternator Motor 25 KVA) | 1 | Nos. | |
17 | 17 | Rewinding of Sestor Field (3Ph Alternator Motor 25 KVA) | 1 | Nos. | |
18 | 18 | Replacement of MCB 63 Amp. | 1 | Nos. | |
19 | 19 | HV Test Set | |||
20 | 20 | Replacement of Meter (Amp. Vold) | 1 | Nos. | |
21 | 21 | Replacement of Wiring of Control Panel | 1 | Nos. | |
22 | 22 | Replacement of MCB 63 Amp. | 1 | Nos. | |
23 | 23 | Hydrolic Trolley | |||
24 | 24 | Replacement of Hydrolic pump | 2 | Nos. | |
25 | 25 | Oiling & Greasing of Components | 2 | Nos. | |
26 | 26 | Alignmnet of Struture & Wheel | 2 | Nos. | |
27 | 27 | Filling of Hydrolic Oil | 1 | Nos. | |
28 | 28 | Replacement of Bearing | 1 | Nos. | |
29 | 29 | Replacement of Pressure rod | 1 | Nos. | |
30 | 30 | Replacement of Pressure Spring | 2 | Nos. | |
31 | 31 | Replacement of Handle Shaft | 2 | Nos. | |
32 | 32 | Replacement of Pump Wheel big | 1 | Nos. | |
33 | 33 | Replacement of Wheel Small | 2 | Nos. | |
34 | 34 | Replacement of Bearing | 2 | Nos. | |
35 | 35 | Replacement of Doll Pin | 2 | Nos. | |
36 | 36 | Replacement of Main Shaft | 1 | Nos. | |
37 | 37 | Replacement of Hydrolic Pump Kit | 2 | Nos. | |
38 | 38 | Electric Motor | |||
39 | 39 | Repairing & Rewinding of 1.H.P.3ph Motor | 1 | Nos. | |
40 | 40 | Repairing & Rewinding of 3.H.P.3ph Motor | 1 | Nos. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail