Bhubaneswar Municipal Corporation has published Provision Of Sewerage System From Community Toilet To Existing Sewer System At Ishaneswar Basti In Ward No . 14. Submission Date for this Tender is 10-09-2019. Sewerage Construction Tenders in BMC Limit Odisha. Bidders can get complete Tender details and download the document.
Name of Work:Provision of Sewerage system from Community Toilet to existing sewer system at Ishaneswar Basti in Ward No.14 | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Supplying all materials and labour, T&P for earth work in excavation in trenches for laying pipes, specials in all kinds of soil including dressing and leveling the bed and depositing the soil within 50mtr., initial lead and 1.5mtrs. Initial lift as per specification etc. all complete as per direction of Engineer-in-charge. | BI01010001010000000000000515BI0100001113 | 57.42 | %Cum |
2 | 2 | Excavation of foundation in literate rock or any hard rock (other than granite or disintegrated rock) removed by chiseling including dressing and leveling the bed not exceeding 1.5mtr depth and depositing the soil within 50mtr initial lead as per specification approved by the Deptt. etc. all complete as per direction of Engineer-in-charge. | BI01010001010000000000000515BI0100001114 | 206.7 | Cum |
3 | 3 | Cutting of cement concrete floor for taking pipe line & making good to the damages with C.C. as per direction as per direction of Engineer-in-charge. (200mm dia Pipe) | 17.06 | Cum | |
4 | 4 | Supplying all labour, T&P and concrete breaker during earth work in excavation in hard rock and cement concrete etc all complete as per direction of Engineer-in-charge. | 96 | Hour | |
5 | 5 | Supplying all materials labour T & P for new construction/ reconstruction of brick masonry M.H Chamber of following size including of flyash brick work in C.M. (1:5), 12mm thick cement plaster in C.M.(1:3) for both inside & outside surface with neat cement punning to top & inside surface, including benching and channelling with C.C (1:2:4) with 12mm C.B.H.G. chips and then plaster with C.M. (1:3) over it & and then smooth & neat fixing with cement punning inside fixing of step iron of approved quality and R.C.C cover slab of 150mm thick self in C.C(1:1.5:3) in 12mm C.B.H.G. chips having manhole opening of requisite including fixing of R.C.C. manhole cover with frame including curing etc. all complete as per direction of Engineer-in-charge. (A) New construction of circular Manhole size 1.20m dia x0.90m depth with RCC top slab and SFRC manhole cover | 20 | No | |
6 | 5.1 | Every Additional depth of 0.10m or part thereof | 60 | No | |
7 | 6 | Supplying all labour, materials and T&P and laying in trenches unplasticised PVC pipes confirming to IS:4985-2000 and specials of the following outside diameter for all classes including jointing with supply of approved solvent cement by non-heat application method including testing as per specification complete excluding earth work excavation etc. all complete. (A) 200mm dia UPVC pipe (Foam core/ Eco drain) | 306 | Mtr | |
8 | 7 | Supplying all labour, T & P and refilling the pipe line trenches with sand including all carriage and conveyance including watering and ramming as per direction of the Engineer-in-charge. | 40.37 | Cum | |
9 | 8 | Supplying all materials, labour, T&P for making cement concrete in C.C.(1:4:8) with 12mm size cbhg chips etc. all complete as per direction of Engineer-in-charge. | 6.83 | Cum | |
10 | 9 | Supplying all materials, labour, T & P for Cement Concrete (1:1.5:3) with 12mm size c.b.h.g metal with all cost, conveyance, royalty, taxes etc. complete as per direction of Engineer-in-charge. | 10.24 | Cum | |
11 | 10 | Supplying all materials, labour and T&P and making connection to new sewer line with the existing M.H. chamber etc. all complete as per direction of Engineer-in-charge. (a) 150mm dia sewer line | 2 | No | |
12 | 11 | Supplying all labour, T & P and refilling the pipe line trenches with excavated materials including all carriage and conveyance including watering and ramming as per direction of the Engineer-in-charge. | 185.52 | %Cum | |
13 | 12 | Supplying all labour T&P for transportation of surplus materials away from the site by mechanical means including loading and unloading charges etc. all complete as per direction of Engineer-in charge. | 78.6 | Cum | |
14 | 13 | Internal P.H Work Supplying all labour, T&P for dismantling & removing following old tiles, PH fixture, doors etc. and removing debrises etc. all complete as per direction of Engineer-in-charge.(a) Floor Tiles | 25.8 | Sqm | |
15 | 13.1 | P.H Fixtures (Orissa pan/ Squatting Urinal) | 4 | No | |
16 | 13.2 | Cistern | 8 | No | |
17 | 13.3 | Door/ window etc | 9.5 | Sqm | |
18 | 14 | Supplying fitting fixing laminated single panneled PVC door with choukath incluidng cost of all fittings, labour charges, T&P etc. all complete as per direction of Engineer-in-charge. | 9.5 | Sqm | |
19 | 15 | Supplying all materials labour T&P for making base concrete of floor CC(1:1.5:3) with 12mm size with c.b.h.g chips etc. all complete as per direction of Engineer-in charge. | 2.58 | Cum | |
20 | 16 | Providing fixing special quality antiskid floor tiles of 300 x300mm size of Kajaria/ Johnson make over a base of 25mm thick CP in C.M (1:1)/ Wall Tile - (Size-300mm x450mm) over base of 12mm thick C.P (1:4) including cost conveyance royalty and taxes etc all complete as per the direction of Engineer-in-charge.(a) Floor Tiles | 25.8 | Sqm | |
21 | 17 | Supplying all materials, labour, T&P and fixing of following P.H. fittings of approved make including supplying of all necessary jointing materials all complete as per approved specification and direction of Engineer-in-charge. (a) 10 ltrs. Capacity P.V.C. Low level cistern with 32mm dia. PVC Long flush bend (Parryware slim line). | 8 | Set | |
22 | 17.1 | 23" long Orissa pan with 'P' trap (Nycer / Parryware) | 8 | Set | |
23 | 17.2 | 15mm dia C.P. long body bib cock (Amber Delux) | 2 | No | |
24 | 17.3 | 15mm dia. C.P. short body bib cock.(Amber Delux) | 10 | No | |
25 | 17.4 | 15mm dia. C.P. Angle stop cock.(Amber Delux) | 8 | No | |
26 | 17.5 | 125mm dia CP grating | 10 | No | |
27 | 17.6 | CP Towel rail | 6 | No | |
28 | 17.7 | CP Soap holder | 14 | No | |
29 | 17.8 | 15mm dia C.P. extension piece and flange | 18 | No | |
30 | 19 | Supplying all labour T&P for removal of debriges from site by mechanical means etc. all complete as per the direction of Engineer-in-charge. | 2 | Job | |
31 | 20 | Supplying all materials,labour and T&P for cutting holes through existing flyash brick walls for taking sand cast iron pipes/ A.C. pipes and fittings including mending good to the damages all complete | 16 | No | |
32 | 21 | Supply all materials, labour, T&P complete dismantling and removing of 110mm dia SWR/ HCI pipes and fittings etc. all complete as per direction of Engineer-in-charge.(100mm dia Pipe) | 30 | Mtr | |
33 | 22 | Supply all materials, labour, T&P and laying of following dia. SWR pipes and fittings, jointing with C.M. (1:1) fixing to walls with nails, bobbins and wooden plugs etc. all complete as per direction of Engineer-in-charge. (a) 110mm dia P.V.C. SWR S/S Pipe (ISI type-B) | 45 | Mtr | |
34 | 22.1 | 110mm dia PVC SWR door bend | 12 | No | |
35 | 22.2 | 110mm dia. PVC SWR S/J with Door | 10 | No | |
36 | 22.3 | 110mm dia. PVC SWR Nahani Trap | 8 | No | |
37 | 22.4 | 110mm dia. PVC SWR Plain Bend | 12 | No | |
38 | 22.5 | 110mm dia. PVC SWR Pipe clip | 8 | No | |
39 | 22.6 | 110mm dia. PVC SWR P' trap | 12 | No | |
40 | 22.7 | 110mm dia. PVC SWR off set bend | 12 | No | |
41 | 23 | Cutting of cement concrete plinth for taking pipe line & making good to the damages with C.C. as per direction as per direction of Engineer-in-charge. | 3.63 | Cum | |
42 | 24 | Supplying all labour, T&P and concrete breaker during earth work in excavation in hard rock and cement concrete etc all complete as per direction of Engineer-in-charge | 24 | Hour | |
43 | 25 | Supplying all materials, labour, T&P for making cement concrete in C.C.(1:2:4) with 12mm size CBHG chips etc. all complete as per direction of Engineer-in-charge. | 2.34 | Cum | |
44 | 26 | Supplying all materials, labour and T&P and making connection to new sewer line with the existing M.H. chamber etc. all complete as per direction of Engineer-in-charge. (100 to 150mm dia sewer line) | 2 | No | |
45 | 27 | Supplying all materials, labour, T & P and reconstruction of new inspection chamber with flyash brick in C.M. (1:4) providing 12mm thick C.P (1:3) including punning inside and outside fixing of 80mm thick RCC cover slab etc. all complete as per P.H. specification and direction of Engineer-in-charge.(New construction of Inspection Chamber (0.90x0.80 x0.75)m with RCC cover slab) | 5 | No | |
46 | 28 | Supply all materials, labour, T & P and laying of following dia. SWR pipes and fittings from G.T. to M.H./ I.C., with proper level and slope including necessary earth work excavation, refilling the trenches with excavated materials and all round concrete ecashing of pipe line etc. all complete as per direction of Engineer-in-charge.(Laying of 110mm dia PVC SWR pipe line with all round concrete encashing (B1 standard bedding) | 43.5 | Mtr | |
47 | 29 | Supplying all labour, T & P and for removal of debriges from site etc. all complete as per P.H. specification and direction of Engineer-in-charge. | 16 | No |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail