Kerala Minerals And Metals Limited has published Providing Foundation For Frp Acid Storage Tank In Kmml . . Submission Date for this Tender is 05-09-2019. Foundation Work Tenders in KMML Kerala. Bidders can get complete Tender details and download the document.
Work Name : Providing foundation for FRP acid storage tank in KMML. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | 500 mm dia Piling | BI01010001010000000000000515BI0100001113 | ||
2 | 1.01 | Boring, providing and installing bored cast-in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring, with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. all complete, including removal of excavated earth with all lifts and leads (Length of pile for payment shall be measured upto bottom of pile cap).<br>500 mm dia piles | BI01010001010000000000000515BI0100001114 | 189 | metre |
3 | 2 | Demolition of PCC/RCC | BI01010001010000000000000515BI0100001115 | ||
4 | 2.01 | Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | BI01010001010000000000000515BI0100001116 | 3.6 | cum |
5 | 3 | Steel work for piling | BI01010001010000000000000515BI0100001117 | ||
6 | 3.01 | Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete , Thermo - Mechanically Treated bars of grade Fe-500D or more etc complete with zinc rich primer coating 2 coats after cleaning the steel with wire brush etc... but excluding cost of steel bars . | BI01010001010000000000000515BI0100001118 | 5 | quintal |
7 | 4 | Pile load test | BI01010001010000000000000515BI0100001119 | ||
8 | 4.01 | Vertical load testing of piles in accordance with IS 2911( Part IV) including installation of loading platform and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of engineer -in-Charge.Single pile upto 50 tonne capacityRoutine test | BI01010001010000000000000515BI0100001120 | 1 | per test |
9 | 5 | Excavation | BI01010001010000000000000515BI0100001121 | ||
10 | 5.01 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | BI01010001010000000000000515BI0100001122 | 12.94 | cum |
11 | 6 | PCC 1:4:8 | BI01010001010000000000000515BI0100001123 | ||
12 | 6.01 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:Complete but excluding the cost of cement.<br>1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | BI01010001010000000000000515BI0100001124 | 5.06 | cum |
13 | 7 | Soling 20 cm thickness | BI01010001010000000000000515BI0100001125 | ||
14 | 7.01 | Soling with soling stone of size 150 to 75 mm broken stone including hand picking and wedging them tightly so that the whole is formed as a solid mass etc complete as per the direction of engineer-in-charge. | BI01010001010000000000000515BI0100001126 | 3.66 | cum |
15 | 8 | Steel reinforcement | BI01010001010000000000000515BI0100001127 | ||
16 | 8.01 | Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete , Thermo - Mechanically Treated bars of grade Fe-500D or more etc complete with zinc rich primer coating 2 coats after cleaning the steel with wire brush etc... but excluding cost of steel bars . | BI01010001010000000000000515BI0100001128 | 20 | quintal |
17 | 9 | Centering and shuttering works. | BI01010001010000000000000515BI0100001129 | ||
18 | 9.01 | Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | BI01010001010000000000000515BI0100001130 | 71.93 | sqm |
19 | 10 | RCC M25 for pile cap, ring beam, tie beam, top slab | BI01010001010000000000000515BI0100001131 | ||
20 | 10.01 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of cement, centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.<br>All work upto plinth level | BI01010001010000000000000515BI0100001132 | 17.08 | cum |
21 | 11 | Black bituminous painting | BI01010001010000000000000515BI0100001133 | ||
22 | 11.01 | Painting with black anti- corrosive bitumastic paint of approved brand and manufacture to give an even shade:Two or more coats on new work | BI01010001010000000000000515BI0100001134 | 37.31 | sqm |
23 | 12 | Plastering | BI01010001010000000000000515BI0100001135 | ||
24 | 12.01 | 12 mm cement plaster finished with a floating coat of neat cement of mix: etc complete but excluding the cost of cement.<br>1:3 ( 1 cement : 3 fine sand) | BI01010001010000000000000515BI0100001136 | 123.02 | sqm |
25 | 13 | Providing bolt holes with ply wood | BI01010001010000000000000515BI0100001137 | ||
26 | 13.01 | Providing pockets for bolt holes with plywood. | BI01010001010000000000000515BI0100001138 | 3.36 | sqm |
27 | 14 | Red earth filling | BI01010001010000000000000515BI0100001139 | ||
28 | 14.01 | Supplying and filling in plinth with red earth under floors, including watering, ramming consolidating and dressing complete. Compacted volume will be measured. | BI01010001010000000000000515BI0100001140 | 9.67 | cum |
29 | 15 | Standard Penetration Test | BI01010001010000000000000515BI0100001141 | ||
30 | 15.01 | Conducting standard penetration test including collection of SPT samples. | BI01010001010000000000000515BI0100001142 | 2 | no |
31 | 16 | Miscellaneous labour | BI01010001010000000000000515BI0100001143 | ||
32 | 16.01 | Man days for miscellaneous works | BI01010001010000000000000515BI0100001144 | 6 | Day |