| 1 | 1 | Hiring of HEMM for excavating all kinds of strata/overburden/insitu above UK seam and inter burden parting between UK seam and LK seam (including drilling in all kinds of strata/over burden), loading in to Tippers, Transportation and unloading of excavated materials and silt, dumping, dozing, scrapping/removal of all bands, preparation/maintenance of haul road, water sprinkling and spreading of material at the site shown in the plan and as per directives of the Management/Engineer in charge of Kusmunda Project for a total quantity of 3,40,94,639.00 Cum( Top soil + Hard strata), for a period of two years (720 Days) @ minimum 47,347 CuM/day, Kusmunda OCP, Kusmunda Area. \n\n | BI01010001010000000000000515BI0100001112 | | |
|---|
| 2 | 1.01 | (a) Top soil (Not requiring Drilling) above UK seam Total Quantity 8,42,237.00 Cum | | | |
|---|
| 3 | 1.02 | \n (a)(i) Route No 2, Lead Slab 2.00-3.00KM Total Qty 1,58,834.00Cum ,Dump No-1\n\n | BI01010001010000000000000515BI0100001114 | 158834 | Cum |
|---|
| 4 | 1.03 | (a)(ii) Route No 2, Lead Slab 3.00-4.00KM Total Qty 6,83,403.00Cum ,Dump No-1 \n | BI01010001010000000000000515BI0100001118 | 683403 | Cum |
|---|
| 5 | 2 | b) Hard Strata (Requiring Drilling in all kind of strata / OB) above UK Seam and inter burden parting between UK seam and LK Seam for a quantity of with Drilling - 3,32,52,402.00 Cum. Total Quantity- 3,32,52,402.00 Cum | | | |
|---|
| 6 | 2.01 | (b)(i) Lead Slab 0.000-1.00 KM , Total Quantity :- 55,07,601.00 \nRoute No 1- (b)(i) Lead Slab 0.00-1.00KM Total Qty 3,06,714.00Cum ,Road Dump \nRoute No 3- (b)(i) Lead Slab 0.00-1.00KM Total Qty 13,22,457.00Cum ,Dump No-2 \nRoute No 4- (b)(i) Lead Slab 0.00-1.00KM Total Qty 38,78,430.0Cum Dump No-3\n\n \n | BI01010001010000000000000515BI0100001126 | 5.5076e+06 | Cum |
|---|
| 7 | 2.02 | (b)(ii)Lead Slab 1.00-2.00 KM , Total Quantity :- 1,23,70,423.00 \nRoute No 3- (b)(ii) Lead Slab 1.00-2.00KM Total Qty 18,89,224.00Cum ,Dump No-2 \nRoute No 4- (b)(ii) Lead Slab 1.00-2.00KM Total Qty -1,04,81,199.00Cum ,Dump No-3 \n\n | BI01010001010000000000000515BI0100001128 | 1.23704e+07 | Cum |
|---|
| 8 | 2.03 | (b)(iii) Lead Slab 2.00-3.00 KM , Total Quantity :- 1,23,70,220.00 \nRoute No 3- (b)(iii) Lead Slab 2.00-3.00KM Total Qty 18,89,224.00Cum ,Dump No-2 \nRoute No 4- (b)(iii) Lead Slab 2.00-3.00KM Total Qty -1,04,80,996.00Cum ,Dump No-3 \n\n\n | BI01010001010000000000000515BI0100001120 | 1.23702e+07 | Cum |
|---|
| 9 | 2.04 | (b)(iv)Lead Slab 3.00-4.00 KM , Total Quantity :- 30,04,158.00\nRoute No 3- (b)(iv) Lead Slab 3.00-4.00KM Total Qty 15,26,863.00Cum ,Dump No-2\nRoute No 4- (b)(iv) Lead Slab 3.00-4.00KM Total Qty -14,77,295.00Cum ,Dump No-3 \n\n | BI01010001010000000000000515BI0100001123 | 3.00416e+06 | Cum |
|---|
| 10 | 3 | Total impact of GST for the purpose of CTC | BI01010001010000000000000515BI0100001129 | 1 | Nos |
|---|