Tender For Asphalt And Fo Tank Farm Area Cleaning Works In Cpcl - Manali, Refinery , Supplying Of Empty Used Ms Circular Drums Of 200 Lit Capacity In Good Condition With Top Open Free From Material And Fabrication Defects ( I . D . = 572Mm , Inside Height = 851Mm ) , Removing Spillages Such As Bitumen / Asphalt / Wax / Lube Oil / Sludge Etc . Manually From Storage Tank Farms , Pump Houses , Filling , Handling Areas And / Or From The Storm Water Drains / Culverts , Roads And / Or From Any Other Locations As Directed , From Time To Time By Scrapping , De-Canding Using Spade And Other Tools , Collecting The Scrapped Stuff In Open Drums Of 200 Litres Capacity ( I . E . 90% Fill Without Spillage ) Stack The Drums Filled With Collected Stuff On The Sides Of Roads , Outside The Tankfarms Or Any Other Suitable Nearby Site Of Work As Directed By Engineer-In-Charge Including All Labour , Tools & Tackles , Etc . Unit Of Measurement Shall Be Per Drum . , Collecting Of Drums Filled With Oily Sludge / Asphalt Muck / Debris Etc . , From Refinery - I , Ii , Iii , Offsites Of Refinery Premises , Intercarting And Neatly Stacking The Drums At Asphalt / Fo Reclaimer Units At Om&S-I / Ii Area Including All Types Of Tools & Tackles , Labour , Etc . , Removal Of Oil Spills During Carting By Spreading Sand , Scraping The Area All As Directed By Engineer-In-Charge . Unit Of Measurement Shall Be Per Drum . , Collecting Of Drums Filled With Oily Sludge / Asphalt Muck / Debris Etc . , From Refinery - I , Ii , Iii , Offsites Locations Of Refinery Premises And Intercarting Through South Gate And Neatly Stacking The Drums Etc . At Etp / Mtf Area Within The Refinery Premises , Including All Types Of Tools & Tackles , Labour , Etc . , Removal Of Oil Spills During Carting By Spreading Sand , Scraping The Area All As Directed By Engineer-In-Charge . Unit Of Measurement Shall Be Per Drum . , Removal Of Oil / Asphalt Spillage From Paved Area By Sprinkling Fine Aggregate ( M Sand ) On The Area Of Oil Spill , Removing And Disposing The Oily Earth To Sludge Lagoon / Bio-Remediation Pit Situated In Etp-Ii , Including The Labour , Tools , Tackles , Cost Of Fine Aggregate ( M Sand ) , Etc . All Complete . , Dewatering Using Diesel / Any Other Fuel Driven Self Priming Pumps Of Adequate Capacity With Necessary Discharge And Suction Hoses , Foot Valves , Etc To Required Length Including Fuel / Oil And Operator Cost Etc . Complete . , Dewatering Using Electric Power Driven Self Priming Pumps Of Adequate Capacity With Necessary Discharge And Suction Hoses To Required Length Including Hire , Fuel / Oil And Operator Cost Etc . Complete . Power Will Be Provided At Single Point Free Of Cost By Cpcl . , Clearing Jungle Including Uprooting Of Grass , Vegetations , Including Tree Saplings Upto A Girth Of 30Cm Measured At Height Of 1M From Ground Level , Collecting All Removed Vegetation Etc . Bundling Into Heaps And Disposal Outside The Refinery Premises At At Earmarked Places At Ammullaivoyal Site Upto To A Lead Of 10 Km As Directed By Eic With Contractors Own Transport , All Tools , Tackles , Labour Etc . All Complete As Directed By The Engineer-In-Charge .