Meham Cooperative Sugar Mills Limited has published Tender For Fabrication Job. Submission Date for this Tender is 02-09-2019. Fabrication Work Tenders in The Meham Co-op Sugar Mills Meham Haryana. Bidders can get complete Tender details and download the document.
Name of Work: Fabrication jobs | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Fabrication jobs | |||
2 | 1.001 | PIPE LINES [M.S./ G.I.] Dismantling up to12'' including bends, reducers, flanges etc. | 1 | 1 | per inch dia/ feet length |
3 | 1.002 | PIPE LINES [M.S./ G.I.] Erection up to 2" dia. | 2 | 1 | -do- |
4 | 1.003 | PIPE LINES [M.S./ G.I.] - do- above 2" to 12" dia. | 3 | 1 | -do- |
5 | 1.004 | Dismantling,cleaning, burning & refitting of existing pipe lines of all sizes (for cleaning & modification purposes) | 4 | 1 | -do- |
6 | 1.005 | M.S Pipe line above 12" dia. Dismantling | 5 | 1 | -do- |
7 | 1.006 | M.S Pipe line above 12" dia. Fabrication | 6 | 1 | -do- |
8 | 1.007 | M.S Pipe line above 12" dia. Erection | 7 | 1 | -do- |
9 | 1.008 | Dismantling of flanges/ Blind for reuse | 8 | 1 | per inch dia/ pc. |
10 | 1.009 | Refitting of old flanges/Blind[reuse] new | 9 | 1 | -do- |
11 | 1.01 | Fabrication of flanges/Blind from M. S. plate | 10 | 1 | -do- |
12 | 1.011 | Valves Dismantling & fitting up to 6" Size | 11 | 1 | per inch dia/ pc. |
13 | 1.012 | Valves Dismantling & fittingfrom 7" to 12'' Size | 12 | 1 | -do- |
14 | 1.013 | Valves Dismantling & fitting above 12" Size | 13 | 1 | -do- |
15 | 1.014 | Dismantling & fitting of MS fabricated right angle/ globe valve of size more than 12" size | 14 | 1 | -do- |
16 | 1.015 | Dismantling & fitting of C.I. pipe &accessories | 15 | 1 | Per inch dia/ft. length |
17 | 1.016 | Dismantling& fitting of S.S.Pipe & accessories. | 16 | 1 | -do- |
18 | 1.017 | Dismantling of MS bend, Tee, nipple, reducer above 12" | 17 | 1 | -do- |
19 | 1.018 | Fabrication of MS bend, tee, nipple, reducer above 12" | 18 | 1 | - do - |
20 | 1.019 | Erection of MS bend, tee, nipple, reducer above 12" | 19 | 1 | - do - |
21 | 1.02 | Dismantling, Fab. & Erection of M.S./S.S. pipe accessories(tee,cone,cross,distance piece, nipple, reducer, bend) | 20 | 1 | per inch dia/ feet length |
22 | 1.021 | Dismantling, Fab. & Erection of M.S. Plate jobs (tanks, gutters, chutes Pipe rolling, Boiler ducting etc.) | 21 | 1 | PMT |
23 | 1.022 | Dis./fab./erection of internal structure of wet scrubber. | 22 | 1 | Lump sum |
24 | 1.023 | Repairing of old platform dismantling,fab.&erection | 23 | 1 | per sq mtr |
25 | 1.024 | Patch work up to 4 sq. ft. max. | 24 | 1 | Per sq. feet. |
26 | 1.025 | Patch work above 4 sq. ft. Welding work ( Two round ) | 25 | 1 | per feet length |
27 | 1.026 | Dismantling, Fab. & Erection of cane kicker blades | 26 | 1 | Each |
28 | 1.027 | Dismantling, Fab. & Erection of cane kicker drum | 27 | 1 | Each |
29 | 1.028 | Dismantling, Fab. & Erection of M.S. side & bottom Plate jobs (Rake carrier, CC,BE,BC,RBC trough Donnelly chute, Fibrizor, cane leveller, kicker, juice screen, juice screen tray, bagacillo casing etc. | 28 | 1 | Per sq. mtr. |
30 | 1.029 | Fabrication & erection of new discharge chute for mill no. 1,2 & 3 | 29 | 1 | Per chute |
31 | 1.03 | Fabrication & erection of new discharge chute for mill no. 4. | 30 | 1 | Per chute |
32 | 1.031 | Rake carrier, C.C., B.E., B.C., R.B.C Troughs, Donnelly chute - Dismantling & fitting of runners of various chain. | 31 | 1 | per mtr length |
33 | 1.032 | Rake carrier, C.C., B.E., B.C., R.B.C Troughs, Donnelly chute - Dismantling & fitting of side angles | 32 | 1 | -do- |
34 | 1.033 | Strengthening of cane carrier side plates with angles 65x65x10 mm | 33 | 1 | Per mtr length |
35 | 1.034 | Shifting of cane carrier side plate about 50 mm from bottom towards inside appx. 30 meters length & alignment | 34 | 1 | Per mtr length |
36 | 1.035 | Rake carrier, C.C., B.E., B.C., R.B.C Troughs, Donnelly chute - Rake carrier drive column strengthening with 10mm M.S. plate throughout the length. | 35 | 1 | Each column |
37 | 1.036 | Rake carrier, C.C., B.E., B.C., R.B.C - Fabrication & erection of tail end sprocket wheel | 36 | 1 | Each |
38 | 1.037 | Fabrication & erection of Maceration water tray at mill | 37 | 1 | Per tray |
39 | 1.038 | Fabrication of MS cover for mill bottom bearing (Journal size dia- 430mmx540mm) | 38 | 1 | Per piece |
40 | 1.039 | Cane Unloaders - Dismantling of square bar (size-2") runner . | 39 | 1 | Per Mtr |
41 | 1.04 | Cane Unloaders - Fitting of square bar size 2” runner at cane unloader | 40 | 1 | Per mtr. |
42 | 1.041 | Cane Unloaders - Fabrication & fitting of M.S. Plate 10 mm thk. (appx.) at cane unloaders 300 mm gantary channel | 41 | 1 | Per Mtr |
43 | 1.042 | Cane Unloaders - Replacement of cane unloaders cabin M.S. plates. | 42 | 1 | Per sq. mtr. |
44 | 1.043 | Cane unloaders-Fabrication of hydraulic grab finger from 30 mm M.S. plate & fitting | 43 | 1 | Each Finger |
45 | 1.044 | Cane Unloaders - Fabrication and erection of bridge gear wheel guard. | 44 | 1 | Per piece |
46 | 1.045 | Cleaning, welding of cane unloader bridge wheel | 45 | 1 | Per wheel |
47 | 1.046 | Cleaning, welding of cane unloader trolley wheel | 46 | 1 | Per wheel |
48 | 1.047 | Fab & erection of new Donnelly chute | 47 | 1 | Per chute |
49 | 1.048 | To provide long bend –dismantling, fabrication & fitting at Donnelly chute | 48 | 1 | Per chute |
50 | 1.049 | Replacement of side boxes (dis.,fab/erection) for runners at rack carrier troughs | 49 | 1 | permtr. |
51 | 1.05 | Dismantling, fabrication and erection of rake carrier troughs bottom from 12mm plate and side plate=8mm. | 50 | 1 | -do- (running length) |
52 | 1.051 | Dismantling, fabrication and erection of beds (for reduction gear and motor) | 51 | 1 | Per bed |
53 | 1.052 | Bagacillo screens fabrication & erection. | 52 | 1 | Per piece |
54 | 1.053 | Dismantling of bagassecillo screens | 53 | 1 | Per piece |
55 | 1.054 | Fabrication of crown pinion gear guard | 54 | 1 | Per pc. |
56 | 1.055 | Repair of transmission gear guard. | 55 | 1 | P. sq.mtr. |
57 | 1.056 | Fabrication and erection of transmission gear guard top cover | 56 | 1 | P. piece |
58 | 1.057 | Fabrication and erection of transmission gear guard bottom cover | 57 | 1 | P. piece |
59 | 1.058 | Strengthening of Mill House crane bridge structure with 6 mm thk .MS plate between upper & lower beam | 58 | 1 | Per SQ. Ft. |
60 | 1.059 | Fabrication of D.S.M. screens juice boxes. | 59 | 1 | Per box |
61 | 1.06 | Welding of mill roller's sides appx. 1.5 " width peripheral | 60 | 1 | Each side |
62 | 1.061 | Arcing of mill rollers | 61 | 1 | Per roller |
63 | 1.062 | Hard facing of trash plates teeth side and top surface. | 62 | 1 | Per trash plate |
64 | 1.063 | Dis,fab & erection of scroll of screw conveyor for DSM screen | 63 | 1 | Per piece |
65 | 1.064 | Fabrication & erection of complete casing of screw conveyor | 64 | 1 | -do- |
66 | 1.065 | Replacement of bottom juice collecting tray of DSM screw conveyor casing (Dis,fab & erection) | 65 | 1 | Lump sump |
67 | 1.066 | TUFR - Buildup of existing TUFR tips with M.S. electrodes | 66 | 1 | Per roller |
68 | 1.067 | TUFR - Hard facing of existing of TUFR tips | 67 | 1 | Per roller |
69 | 1.068 | Throughout welding except holes of Mills TUFR shell | 68 | 1 | Per roller |
70 | 1.069 | Fabrication and erection of mill juice tray along with discharge pipe. | 69 | 1 | Per tray |
71 | 1.07 | Fabrication and erection of cane carrier pinion and gear guard. | 70 | 1 | Per set |
72 | 1.071 | Cleaning, welding & grinding of teeth sprockets as per profile - Sprocket C.C./B.C. | 71 | 1 | Per sprocket |
73 | 1.072 | Cleaning, welding & grinding of teeth of sprockets as per profile - Rack carrier sprocket | 72 | 1 | -do- |
74 | 1.073 | Cleaning, welding & grinding of teeth of pinion as per profile - Pinion 22 teeth under feed roller drive (one side of teeth) | 73 | 1 | Per pinion |
75 | 1.074 | Cleaning, welding & grinding of teeth of pinion as per profile - Pinion 17 teeth of under feed roller (one side) | 74 | 1 | Per pinion |
76 | 1.075 | Cane Unloader structure strengthening job. | 75 | 1 | Per M.T. |
77 | 1.076 | Chevron groove cutting in rollers. | 76 | 1 | each |
78 | 1.077 | Cane carrier to be covered with 3mm M.S. plate on top upto desired length with hinges and angles bolted | 77 | 1 | Per mtr running length of c.c. |
79 | 1.078 | Blower fan with alignment Fabrication, errection & commissioning. | 78 | 1 | Per fan. |
80 | 1.079 | Dismantling, fabrication & erection of Bagacillopipe from bagacillo to vacuum filter | 79 | 1 | Per inch dia/mtr. |
81 | 1.08 | Dismantling, fitting & hydraulic testing of S.S. Tubes (Semi-kestnner, juice heaters ) | 80 | 1 | per tube |
82 | 1.081 | Dismantling, fitting & hydraulic testing of S.S. Tubes (vapour cell & evaporator bodies) | 81 | 1 | per tube |
83 | 1.082 | Dismantling, fitting & hydraulic testing of S.S /Brass tubes ( pans ) | 82 | 1 | per tube |
84 | 1.083 | Dismantling, fabrication & erection of Pan and quad down take | 83 | 1 | Lump sum |
85 | 1.084 | Dismantling, fab. & erection of Pan and Quad calanderia jacket. | 84 | 1 | Per sq. mtr. |
86 | 1.085 | Dismantling of up to 4 " pump & 15 HP motor. | 85 | 1 | Per inch dia/HP |
87 | 1.086 | Erection of up to 4 " pump & 15 HP motor. | 86 | 1 | -do- |
88 | 1.087 | Dismantling of 4” to 8” pump & 15 to 40 H.P.Motor | 87 | 1 | Per inch dia/HP |
89 | 1.088 | Erection of 4” to 8” pump & 15 to 40 H.P.Motor | 88 | 1 | -do- |
90 | 1.089 | Dismantling of above 8” pump & above 40 H.P.Motor | 89 | 1 | Per inch dia/HP |
91 | 1.09 | Erection of above 8” pump & above 40 H.P.Motor | 90 | 1 | Per inch dia/ HP |
92 | 1.091 | Dismantling, fabrication, erection of Sulphur furnace (complete) | 91 | 1 | L.S. each. |
93 | 1.092 | Dismantling, fab. & erection of the Melter/ receiver of Sulphur furnace. | 92 | 1 | Per piece. |
94 | 1.093 | Dismantling, fabrication & erection of Shell of Sulphur furnace | 93 | 1 | Per shell |
95 | 1.094 | Dismantling, fabrication & erection of scrubber of sulphur furnace | 94 | 1 | P.M.T. |
96 | 1.095 | Dismantling , fabrication & erection of steam jacket of sulphur furnace | 95 | 1 | Per Pc. |
97 | 1.096 | Dismantling, fabrication, erection of Sulphur furnace cooler | 96 | 1 | L.S. each. |
98 | 1.097 | Dismantling, Fabrication & erection of the Bottom portion of weight juice tank with MS plates | 97 | 1 | Per M.T. |
99 | 1.098 | Dismantling, Fabrication & erection of the Scrappers of Dorr clarifier with MS plates | 98 | 1 | Per M.T. |
100 | 1.099 | Dismantling, Fabrication & erection of the Catcher bottle of Vac. Filter with MS plates | 99 | 1 | Per M.T. |
101 | 1.1 | Dismantling, Fabrication & erection of the Bottom of Dorr clarifier with MS plates | 100 | 1 | Per M.T. |
102 | 1.101 | Dismantling, Fabrication & erection of the Mud tray of Vac. Filter with MS plates | 101 | 1 | Per M.T. |
103 | 1.102 | Dismantling, Fabrication & erection of the Mud tank bottom of vac. Filter with MS plates | 102 | 1 | PMT |
104 | 1.103 | Dismantling, Fabrication & erection of the Conical portion of juice/ water/ mud tank with MS plates | 103 | 1 | Per sq. mtr. |
105 | 1.104 | Dismantling, Fabrication & erection of MS plates of Pan station - Shell of Pans | 104 | 1 | PMT |
106 | 1.105 | Dismantling, Fabrication & erection of MS plates of Pan station - Pan tops | 105 | 1 | -do- |
107 | 1.106 | Dismantling, Fabrication & erection of MS plates of Pan station - Saveall | 106 | 1 | Per save-all |
108 | 1.107 | Dismantling, Fabrication & erection of MS plates of Pan station - Shell of Vac. Crystallizer | 107 | 1 | PMT |
109 | 1.108 | Dismantling, Fabrication & erection of MS plates of Pan station Bottom plates of Syrup & molasses tanks & conditioners | 108 | 1 | Per M.T. |
110 | 1.109 | Dismantling, Fabrication & erection of MS plates of Pan station Side plates of Syrup & molasses tanks & conditioners | 109 | 1 | -do- |
111 | 1.11 | Dismantling, Fabrication & erection of MS plates of Pan station Pan shell strengthening work with MS channels/ angles/ MS plate rings | 110 | 1 | Per Pan |
112 | 1.111 | Dismantling, Fabrication & erection of MS plates of Pan station Top cone strengthening work with MS channels/ angles/ MS plate rings | 111 | 1 | Per cone |
113 | 1.112 | Dismantling, Fabrication & erection of MS plates of Pan station Strengthening of vapour line by inner side supporting of angles/ pipes | 112 | 1 | Per vapour line |
114 | 1.113 | Dismantling, fab. & erection of coils of horizontal crystallizers | 113 | 1 | Per inch dia / feet length |
115 | 1.114 | Dismantling of shaft of crystallizers | 114 | 1 | Per inch dia/ feet length |
116 | 1.115 | Fabrication of shaft of crystallizers | 115 | 1 | -do- |
117 | 1.116 | Erectionof shaft of crystallizers | 116 | 1 | -do- |
118 | 1.117 | Replacement of 3” MS coils (including bends, flange, etc.) of Vertical crystallizers | 117 | 1 | Per inch dia/ feet length |
119 | 1.118 | Dismantling, fab. & erection of arms of A- crystallizers | 118 | 1 | Per arm |
120 | 1.119 | Replacement of coils of Dorr & evaporator bodies - Juice coils (Dismantling, Fab. & erection) | 119 | 1 | Per inch dia./ feet length |
121 | 1.12 | Replacement of coils of Dorr & evaporator bodies - Ammonia & gas coils (Dismantling, Fab. & erection) | 120 | 1 | Per inch dia./ feet length |
122 | 1.121 | Replacement of weak MS plates & cooling coils of Molasses tanks Bottom plates | 121 | 1 | PMT |
123 | 1.122 | Replacement of weak MS plates & cooling coils of Molasses tanks Side plates upto height 10mtr | 122 | 1 | -do- |
124 | 1.123 | Replacement of weak MS plates & cooling coils of Molasses tanks Top cone plates with supports | 123 | 1 | -oo- |
125 | 1.124 | Replacement of weak MS plates & cooling coils of Molasses tanks Cooling coils | 124 | 1 | per inch dia/feet length |
126 | 1.125 | Dismantling, fabrication, erection of MS pipe coil fitting at various station | 125 | 1 | - do - |
127 | 1.126 | Fabrication of Drum internal plates of boiler | 126 | 1 | Per piece |
128 | 1.127 | Dismantling, fabrication and erection of expansion joints of boiler | 127 | 1 | L.S.perexpension joint |
129 | 1.128 | Dismantling of Existing transient Heaters | 128 | 1 | Per piece |
130 | 1.129 | Erection of new/ existing transient heaters | 129 | 1 | do-- |
131 | 1.13 | Dismantling/ Fab./ Erection of weak portion of partition plates of juice heaters | 130 | 1 | L.S. per juice heater |
132 | 1.131 | Dis of Bagasse belt conveyor (only mechanical parts) | 131 | 1 | Lump sump |
133 | 1.132 | Dismantlingof Spurger of juice sulphiter for cleaning | 132 | 1 | per piece |
134 | 1.133 | Fabricationof Spurger of juice sulphiter for cleaning | 133 | 1 | -do- |
135 | 1.134 | Erection/refitting.of Spurger of juice sulphiter for cleaning | 134 | 1 | -do- |
136 | 1.135 | Dis, fab & erection of strainer of injection pump/spray pump | 135 | 1 | Per piece. |
137 | 1.136 | Injection channel jail dismantling, fab. & erection. | 136 | 1 | Per jali |
138 | 1.137 | Repairing of agitator of vaccum filter dismantling, fab. & erection. | 137 | 1 | Per agitator |
139 | 1.138 | Fabrication of sweeper trolley | 138 | 1 | Per piece |
140 | 1.139 | Repairing/ changing of vertical crystallizer arms in top gutter (scrapper type) round shape | 139 | 1 | Lump sump |
141 | 1.14 | ETP middle shaft repairing/ replacement | 140 | 1 | Lump sump |
142 | 1.141 | Fab of new lime tank with its shaft, stirer etc. at ETP | 141 | 1 | Lump sump |
143 | 1.142 | Dismantling, fab & erection of save all of evaporator bodies | 142 | 1 | Per save all |
144 | 1.143 | Replacement of juice sulphiter top | 143 | 1 | Lump sump |
145 | 1.144 | Dismantling of vibro screen | 144 | 1 | Per screen |
146 | 1.145 | Fabriaction of vibro screen | 145 | 1 | -do- |
147 | 1.146 | Erection of vibro screen | 146 | 1 | -do- |
148 | 1.147 | Repairing/ replacement of shell of sugar melter | 147 | 1 | PMT |
149 | 1.148 | Replacement of shaft of sugar melter | 148 | 1 | Per inch dia/ feet length |
150 | 1.149 | Replacemnet of arm of sugar melter | 149 | 1 | per feet length |
151 | 1.15 | Stair case ( With chequared plate) - Dismantling | 150 | 1 | Per step |
152 | 1.151 | Stair case ( With chequared plate) - Fabrication | 151 | 1 | -do- |
153 | 1.152 | Stair case ( With chequared plate) - Erection | 152 | 1 | -do- |
154 | 1.153 | Labour supply (per day 8 hours basis) - Fitter | 153 | 1 | Per person |
155 | 1.154 | Labour supply (per day 8 hours basis) - Welder | 154 | 1 | -do- |
156 | 1.155 | Labour supply (per day 8 hours basis) - Helper | 155 | 1 | -do- |
157 | 1.156 | Labour supply (per day 8 hours basis) - Khalasi | 156 | 1 | -do- |
158 | 1.157 | Juice heater cover dismantling, fab. & erection | 157 | 1 | Each |
159 | 1.158 | Juice heater Refitting with testing by pump. | 158 | 1 | -do- |
160 | 1.159 | Sight glass fitting in condensate bottle of seed & juice heaters/ any vessel,by welding the sight glass. | 159 | 1 | each |
161 | 1.16 | dismantling, fabrication, erection of stainer of injection and spray pump | 160 | 1 | L.S. each. |
162 | 1.161 | Stair case at sugar bin fabrication & erection. | 161 | 1 | -do- |
163 | 1.162 | Vaccum crystallizer shell fabrication,erection & patch. | 162 | 1 | -do- |
164 | 1.163 | Fitting of planetary gear boxes for B massecuite crystallizer. | 163 | 1 | Per unit Lump sum |
165 | 1.164 | F.D. old impeller is to be removed and new is to be fitted and trial. | 164 | 1 | Lump sum |
166 | 1.165 | Straightening of old pipe line of thickness 6-8mm into plain sheet by rolling machine | 165 | 1 | PMT |
167 | 1.166 | To provide slide gate at B.C. Or desired size with rack &pinion. | 166 | 1 | Per gate |
168 | 1.167 | To provide a tapering suit under idler of B.C. To remove the falling bagasse in bagasse year. | 167 | 1 | Lump sum |
169 | 1.168 | Pan No. 4 mechanical circulator is to be dismantled and parts to be shifted to W | 168 | 1 | Per tail pipe |
170 | 1.169 | Pan No. 4 mechanical circulator to be dismantled and parts to be shifted to Workshop for machining. After machining the same circulator parts to be fitted and trial. | 169 | 1 | Lump sum |
171 | 1.17 | Pan/quad condenser tail pipe double support is to be provided with at least L 3”/pipe 2.1/2” with clamp system. | 170 | 1 | Per tail pipe |
172 | 1.171 | Rorimelter is to be fabricated and erected as per drg. | 171 | 1 | Lump sum |
173 | 1.172 | Replacement of ID fan ducting & casing. | 172 | 1 | Per sq. Mtr. |
174 | 1.173 | SS condenser repairing by support to be given by rings | 173 | 1 | L. S. each |
175 | 1.174 | Clear juice filter arrangement by jali fitting - dismantling, fabrication, erection | 174 | 1 | L.S. each. |
176 | 1.175 | Dismantling, fabrication, erection of strengthening of factory column, structure, channel, beam etc. | 175 | 1 | L.S. each support |
177 | 1.176 | Juice heater header partition plate top & bottom both side - dismantling, fabrication, erection | 176 | 1 | L.S. each header |
178 | 1.177 | Oliver filter tray dismantling, fabrication, erection | 177 | 1 | L.S. each. |
179 | 1.178 | Centrifugal machine strengthning dismantling, fabrication & fitting from channel, beam | 178 | 1 | Per running feet |
180 | 1.179 | Dismantling, erection of SS tail pipe at pan & quad condenser | 179 | 1 | Per pipe. |
181 | 1.18 | Dismantling, fabrication, erection tail pipe support angle channel | 180 | 1 | each support. |
182 | 1.181 | Dismantling, fabrication and erection of boiler furnace | 181 | 1 | L.S. per boiler |
183 | 1.182 | Dismantling , fabrication and erection of mud mixture with screw conveyor | 182 | 1 | Lump sump |
184 | 1.183 | Modification of steam jacket of Pan | 183 | 1 | Per pan |
185 | 1.184 | Dismantling, fab and erection of hopper tray | 184 | 1 | Per sq. mtr |
186 | 1.185 | Dis, fab & erection of pugmill | 185 | 1 | Per pugmill |
187 | 1.186 | Dis, fab & erection of magma mixture | 186 | 1 | Per mixture |
188 | 1.187 | Dis, fab & erection of con C/F machine chute | 187 | 1 | Per chute |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail