Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited-UPRVUNL has published Breakdown Maintenance Of Rotating Auxiliaries Such As Boiler Feed Pumps , Condensate Pump , Other Small Pumps And Associated Equipments Of Tmd , For Unit No . 09Th , 10Th , 11Th , 12Th And 13Th Of 200Mw Units , Btps , Obra. Submission Date for this Tender is 20-09-2019. Boiler Feed Pump Tenders in BTPS OBRA SONEBHADRA Uttar Pradesh. Bidders can get complete Tender details and download the document.
Name of Work: Breakdown/Routine maintenance of Rotating auxiliaries such as Boiler Feed pumps, condensate pump, other small pumps & associated equipments of TMD, for Unit No.9th, 10th, 11th & 13th of 200MW Units, BTPS, Obra | |||||
---|---|---|---|---|---|
Sl. No. | Item Description/(work detail as per tender document) | Item Code / Make | Quantity | Units | |
1 | 1 | Changing of Mech. Seal Boiler Feed Booster Pumps:- | |||
2 | 1.1 | Driving End. | BI01010001010000000000000515BI0100001114 | 2 | Jobs |
3 | 1.2 | Non Driving End. | BI01010001010000000000000515BI0100001115 | 2 | Jobs |
4 | 2 | Re-visioning of seal water cooler of Boiler Feed Pumps. | BI01010001010000000000000515BI0100001116 | 2 | Jobs |
5 | 3 | Re-visioning & checking of working oil cooler of BFP. | BI01010001010000000000000515BI0100001117 | 3 | Jobs |
6 | 4 | Re-visioning & checking of Lub Oil Cooler of B.F.P. | BI01010001010000000000000515BI0100001118 | 3 | Jobs |
7 | 5 | Re-visioning & Checking of Tube Leakage of S.W. Heat Exchanger (Cooler) | BI01010001010000000000000515BI0100001119 | 3 | Jobs |
8 | 6 | Re-visioning & Checking of the Tube Leakage of B.C.W. heat exchanger (Cooler) | BI01010001010000000000000515BI0100001120 | 2 | Jobs |
9 | 7 | Re-visioning & Checking of tube leakage of S.W.C. Heat Exchanger (Cooler). | BI01010001010000000000000515BI0100001121 | 2 | Jobs |
10 | 8 | Re-visioning & checking of wire mesh of suction Strainer of B.F.P. | BI01010001010000000000000515BI0100001122 | 2 | Jobs |
11 | 9 | Overhauling of Boiler Feed Pump up to Balancing Disc only | BI01010001010000000000000515BI0100001123 | 3 | Jobs |
12 | 10 | Replacement of inside Stator Assy. of BFP. | BI01010001010000000000000515BI0100001124 | 3 | Nos. |
13 | 11 | Changing of Mech. Seal of Boiler Feed Pump (Suction side) | BI01010001010000000000000515BI0100001125 | 2 | Jobs |
14 | 12 | Changing of Mech. Seal of BFP (Discharge side):- | BI01010001010000000000000515BI0100001126 | 2 | Jobs |
15 | 13 | Inspection/Rectification of fault of BFP Bearings:- | |||
16 | 13.1 | Pump Suction End Bearing:- | BI01010001010000000000000515BI0100001128 | 3 | Nos. |
17 | 13.2 | Pump Discharge End Bearing:- | BI01010001010000000000000515BI0100001129 | 3 | Nos. |
18 | 13.3 | Motor Driving End Bearing :- | BI01010001010000000000000515BI0100001130 | 3 | Nos. |
19 | 13.4 | Motor Non Driving End Bearing:- | BI01010001010000000000000515BI0100001131 | 3 | Nos. |
20 | 14 | O/H of Boiler Feed Booster Pump:- | BI01010001010000000000000515BI0100001132 | 2 | Jobs |
21 | 15 | Complete O/H of Drip pumps.:- | BI01010001010000000000000515BI0100001133 | 2 | Jobs |
22 | 16 | O/H of C.W. Booster Pump:- | BI01010001010000000000000515BI0100001134 | 2 | Jobs |
23 | 17 | Overhauling of H2 Gas Cooling Pump:- | BI01010001010000000000000515BI0100001135 | 2 | Jobs |
24 | 18 | Alignment of Motor of Boiler Feed Booster Pump. | BI01010001010000000000000515BI0100001136 | 2 | Jobs |
25 | 19 | Alignment of Motor of C.W. Booster Pump. | BI01010001010000000000000515BI0100001137 | 2 | Jobs |
26 | 20 | Re-adjustment of Bearing for Replacement of Boiler Feed pump (Motor). | BI01010001010000000000000515BI0100001138 | 2 | Jobs |
27 | 21 | Inspection Rectification of fault of Drip pump:- | BI01010001010000000000000515BI0100001139 | 3 | Jobs. |
28 | 22 | Overhauling of BCW Pump:- | BI01010001010000000000000515BI0100001140 | 2 | Jobs |
29 | 23 | Overhauling of H.W. Make up Pump:- | BI01010001010000000000000515BI0100001141 | 3 | Jobs |
30 | 24 | Overhauling of S.W.C. Pump:- | BI01010001010000000000000515BI0100001142 | 3 | Jobs |
31 | 25 | Overhauling of S.W. Pumps:- | BI01010001010000000000000515BI0100001143 | 3 | Jobs |
32 | 26 | Overhauling of Phosphate Dosing Pump:- | BI01010001010000000000000515BI0100001144 | 3 | Jobs |
33 | 27 | Re-visioning/Replacement of worn out thrust pad of BFP. | BI01010001010000000000000515BI0100001145 | 2 | Jobs |
34 | 28 | O/H of Hydrazine Pumps:- | BI01010001010000000000000515BI0100001146 | 2 | Jobs |
35 | 29 | Re-visioning of Suction filter and associated Valves of Hydrazine pumps. | BI01010001010000000000000515BI0100001147 | 2 | Jobs |
36 | 30 | Alignment of Motor of Drip Pump:- | BI01010001010000000000000515BI0100001148 | 2 | Jobs |
37 | 31 | Alignment of Motor of H2 Gas Cooling Pump. | BI01010001010000000000000515BI0100001149 | 1 | Jobs |
38 | 32 | Alignment of Motor of B.C.W. Pump. | BI01010001010000000000000515BI0100001150 | 2 | Jobs |
39 | 33 | Alignment of Motor of Hot well make up pump:- | BI01010001010000000000000515BI0100001151 | 2 | Jobs |
40 | 34 | Alignment of Motor of S.W.C. Pump. | BI01010001010000000000000515BI0100001152 | 1 | Jobs |
41 | 35 | Alignment of Motor of S.W. Pump. | BI01010001010000000000000515BI0100001153 | 2 | Jobs |
42 | 36 | Alignment of B.F.P. with Hydraulic coupling. | BI01010001010000000000000515BI0100001154 | 3 | Jobs |
43 | 37 | Inspection/Rectification of fault of journal bearings of BF. Booster pump (CE & FE) | BI01010001010000000000000515BI0100001155 | 3 | Jobs |
44 | 38 | Shifting of condensate pump from one unit to other unit: | |||
45 | 38.1 | Without Modification in piping:- | BI01010001010000000000000515BI0100001157 | 2 | Jobs |
46 | 38.2 | With Modification in piping:- | BI01010001010000000000000515BI0100001158 | 2 | Jobs |
47 | 39 | Fabrication of Compensator of Suction Line of Condensate pump:- | BI01010001010000000000000515BI0100001159 | 3 | Jobs. |
48 | 40 | Fitting of compensator in suction line of condensate Pump:- | BI01010001010000000000000515BI0100001160 | 3 | Jobs. |
49 | 41 | Inspection/Rectification of fault of BHRC-28 Condensate pump Bearing. | BI01010001010000000000000515BI0100001161 | 4 | Jobs |
50 | 42 | Complete Overhauling of Condensate Pump:- | BI01010001010000000000000515BI0100001162 | 4 | Nos. |
51 | 43 | Re-visioning & Checking of wire mesh of suction Strainer of condensate pump:- | BI01010001010000000000000515BI0100001163 | 10 | Nos. |
52 | 44 | Cleaning of strainer of Cond. Pumps. | BI01010001010000000000000515BI0100001164 | 3 | Jobs |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail