| 1 | 1 | Fixing only Floodlight fittings on top of masonary structure by 3 Nos.\n10 mm dia x 87 mm long rag bolts, nuts & double washers complete\neither 37 mm x 10 mm MS flat support/or by other means as required | item1 | 16 | NOS |
|---|
| 2 | 2 | (I) Service Connection with `L... Type/ Vertical type GI Pipe Bracket :\n5. Supplying & Fixing 40 mm dia 3.20 metre long Vertical Type\nservice bracket FOR carrying 2 wires and an earth wire complete\nwith Galv. clamp FOR stay, insulators etc., 7/14 SWG stranded\nGalv. (Hot Dip) wire FOR stay with 230x13 mm dia straining serews,\n75x88 mm porcelain shackle insulators with Galv. (Hot Dip) strips etc.\nand painting | item2 | 9 | SET |
|---|
| 3 | 3 | SCHEDULE OF RATES FOR EARTHING\nINSTALLATIONS.Earthing Installation ... with Pipe Electrode.Earthing\nwith 50 mm dia GI pipe 3.64 mm thick x 3.04 Mts. long and 1 x 4\nSWG GI (HOT Dip) wire (4 Mts. long), 13 mm dia x 80 mm long GI\nbolts, double nuts, double washers incl. S & F 15 mm dia GI pipe\nprotection (1 Mts. long) to be filled with bitumen partly under the\nground level and partly above ground level driven to an average\ndepth of 3.65 Mts. below the ground level as below:(a)By ISI Medium\nGI pipe.\n | item3 | 4 | SET |
|---|
| 4 | 4 | Painting of Steel Tubular Pole of lengths and no. of coats of paint, as\ngiven below with ready mixed paint/primer of(approved make, and brand incl. preparation of surface by sand paper/emery paper,\ncleaning etc. FOR receiving fresh coat of paint.Upto 9.0 mtr. long\npole.(i)1st coat of aluminium paint over 1 coat of RO priming\n | item4 | 4 | Nos |
|---|
| 5 | 5 | Painting of Steel Tubular Pole of lengths and no. of coats of paint, as\ngiven below with ready mixed paint/primer of(approved make, and\nbrand incl. preparation of surface by sand paper/emery paper,\ncleaning etc. FOR receiving fresh coat of paint.Upto 9.0 mtr. long\npole.ii2nd coat of aluminium paint over 1st coat\n | item5 | 4 | Nos |
|---|
| 6 | 6 | Erection of Galv. (HOT Dip) Cross arms/ `D... Iron\nClamp7).Supplying & Erection of Galv. `D... iron complete with\nsuitable pole clamp 75mmx88mm porcelain shackle insulator & 15\nmm dia Galv. bolts & nuts. incl. painting\n | item6 | 6 | NOS |
|---|
| 7 | 7 | (Laying on Pole with Clamps.Fixing of Cable along the lentgh of O.H.\npole incl. S & F MS pole clamps fabricated from 25 mm x 6 mm MS\nflat incl. painting | item7 | 3 | RUNNING METER |
|---|
| 8 | 8 | Supplying and Drawing 1.1 KV single core stranded 'FR' PVC\ninsulated & unsheathed single core stranded copper wire\n(Brand(approved by EIC) of the following sizes in the prelaid\npolythene pipe and by the prelaid GI fish wire and making necy.\nconnection as required 2 x 36/0.3 (2.5 sqmm) | item8 | 45 | RUNNING METER |
|---|
| 9 | 9 | (H) Street lights : 5. Supplying & Fixing GI waterproof type looping\ncable box size 200x150x100 mm deep having 4 mm thick comprising\nof one 250 V 15 A kit-kat fuse unit, one NL on porcelain insulator, one\ncompression type brass cable gland FOR upto 2- core 16 sqmm\nPVC/A cable and having lined with rubber gasketted GI top cover with\nbrass machine screws etc., earthing terminal with lug, on steel tubular\npole near base, including S&F 40x6 mm thick, MS clamps with bolts,\nnuts etc. including painting with anticorrosive paint | item9 | 4 | SET |
|---|
| 10 | 10 | Laying through Underground Trech.(a)Laying of one No. cable upto\n35 sqmm in underground trench 460 mm wide x 760 mm average\ndepth, with brick protection on the top of the cable with 8 (eight) Nos.\nbricks per metre, including filling the space between the brick & cable\nand also the trench with shifted soil, leveling up and restoring surface\nduly rammed\n | item10 | 250 | RUNNING METER |
|---|
| 11 | 11 | Outdoor Lighting Installation, Steel Tubular Pole, M.S. Pipe, G.I. Pipe,\nPole CAP etc Supplying of Swaged Steel Tubular pole as per IS\n2713, Pt. II, 1980 for following designation and of following\ndimensions.(Outside dia & thickness are given in Annexture -1) 410\nSP - 24 ; 8.5 Mtr., 158.00 Kg.\n | item11 | 4 | Nos |
|---|
| 12 | 12 | Outdoor Lighting Installation, Steel Tubular Pole, M.S. Pipe, G.I. Pipe,\nPole CAP etc. Erection of steel tubular pole upto 9.0 M and above 5.0\nM in C.C. foundation (1:2:4) of stone metal having the dimension of\n600 mm x 600 mm x 1400 mm depth and also providing a C.C.\nfoundation 1:2:4 with graded stone chip (19 mm down) up to ground\nlevel of dimension and proportion of the C.C. as indicated below,\nblack painting the bottom of the pole up to foundation level and\nSupply & Fixing earth bolt etc. as required. | item12 | 4 | NOS |
|---|
| 13 | 13 | 90.Supply of PVC insulated unarmoured sheath aluminium conductor\ncable (1.1KVgrade) (Gloster/incab/Mescab/\nPolycab/Havells/Finolex).d)10sqmm x 4core | item13 | 250 | Mtrs |
|---|
| 14 | 14 | 89.Supply and Fixing of 2 mm Polyvinyl glow sign board made of 22\nSWG GI sheet box with 1\"X1\" aluminum channel for fixing the vinyl\nboard after necessary cutting the letter as required & S/F tube light\nfittings along with all accessories.\n | item14 | 180 | SQ FT |
|---|
| 15 | 15 | 200 WATT LED FLOOD LIGHTS | item15 | 16 | NOS |
|---|
| 16 | 16 | Sub Total | | | |
|---|
| 17 | 17 | GST 12% | | 1 | Nos. |
|---|
| 18 | 18 | CESS 1% | | 1 | Nos. |
|---|