| 1 | 1 | Clearing shrub Jungles uprooting stumps and small bushes and trees below 1M girth on premeasurement etc. complete as directed by engineer-in-charge | BI01010001010000000000000515BI0100001113 | 94320 | 1 Sqm |
|---|
| 2 | 2 | Excavation loading, unloading and carriage by mechanical means in all kinds of soil including stoney earth , gravel and moorum etc, interspread with boulders up to ½ cum size with all lifts and delifts (including trimming of slopes bed to design sectionand) including dewatering if any & depositing the excavated materials away from the work site as per the specification and as directed by the Engineer in charge. (Measurement will be taken in finished level section) | BI01010001010000000000000515BI0100001114 | 1231.2 | 1 Cum |
|---|
| 3 | 3 | Excavation of foundation in hard soil or gravely soil with all leads and lifts and delifts including dressing and leveling the bed to proper slope and level & making it fit for laying concrete & removing the debris clear of work site with all leads and lifts and delifts including dewatering from foundation if necessary etc complete in all respect as directed by the Engineer-In-Charge. | BI01010001010000000000000515BI0100001115 | 395.86 | 1 Cum |
|---|
| 4 | 4 | Filling in foundation and plinth with good quality sand in foundation bed with all leads and lifts including watering and ramming and compaction including cost, conveyance and royalty of the material etc complete as directed by the Engineer-in-charge. | BI01010001010000000000000515BI0100001116 | 68.94 | 1 Cum |
|---|
| 5 | 5 | Cement concrete in M15 grade using 20 mm down graded size crusher broken granite chips of approved quality quarried and free from weathered skin and foreign materials including mixing the materials by use of concrete mixtures and laying concrete in layers not exceeding 0.15 m in depth to required level curing vibrating with vibrators, finishing etc with all leads lifts and delifts complete in all respect to proper profile and leveling including dewatering if necessary and cost, conveyance and royalty and other taxes etc of materials including hire & running charges of the machineries complete as directed by the Engineer - in - Charge. | BI01010001010000000000000515BI0100001117 | 282.19 | 1 Cum |
|---|
| 6 | 6 | Providing form work for concrete with F.I finish for upstream faces of Dam, spillway, glacis of barrage, unexposed surfaces of foundation, block joints etc, with steel shutters rigidly fixed and removal of forms and making good to the surfaces where necessary complete with all labour, materials and T&P complete as directed by the Engineer-in-charge. | BI01010001010000000000000515BI0100001118 | 706.8 | 1 Sqm |
|---|
| 7 | 7 | Excavation of any approved type of soil in approved borrow area by mechanical means loading into and transportation by mechanical means and unloading the soil within all lead and lifts on properly prepared and scientifically approved surface including spreading and compaciion with sheep foot rollers and dozers but excluding watering and borrow area etc complete as per specification as directed by the Engineer in charge. (Measurement will be taken in finished level section) | BI01010001010000000000000515BI0100001119 | 4784.46 | 1 Cum |
|---|
| 8 | 8 | Earth work in ordinary soil with all leads and lifts including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.30m in depth to proper profile etc, with supply of all labour and T&P required for the work including Royalty etc, complete in all respect as directed by the Engineer-in-Charge. (Measurement will be taken in finished level section) | BI01010001010000000000000515BI0100001120 | 2241.67 | 1 Cum |
|---|