| 1 | 1 | SCHEDULE G-1 (Construction of RCC Overhead Tank of 100 KL Capacity at 12 m Staging from made up level (Made Up Level of OHT will be taken as 0.75 m above from existing ground level)) | | | |
|---|
| 2 | 2 | Submission of design, drawing and supply of all material, labour T&P etc. and construct as per tenderer's own seismic proof design and drawings (approved by the department) complete Intz type tank on raft or pile cum raft foundation with columns and braces R.C.C. Over Head Tank 100 KL capacity at 12 m staging from made up ground level at site to the top of bottom ring beam of tank, with a minimum free board of 15cm. The design of the tank shall be based on safe bearing capacity of soil at site as 8 T/m2 and depth of foundation as 2.50m from existing ground level on pile/raft foundation. Made up level of OHT will be taken as 0.75 m above existing ground level. Extra earth required for made up level will be arranged by the contractor at his own cost. If the bearing capacity of soil is found less than 8 T/m2 as per testing agency report, the contractor will submit the design on the B.C. proposed by the testing agency. No extra payment will be made for this change. If the B.C. is found more than 8 T/m2 as per testing report than the design of OHT shall be done at B.C 8 T/m2 and depth 2.5m or the depth suggested by testing agency. All other details of tank not covered here shall also be as per specifications enclosed. with byepass arrangment. | | 1 | No. |
|---|
| 3 | 3 | Submission of detailed design and drawing from any recognized University such as I.I.T. Standard etc. or as per direction of Engineer in-charge. | | | |
|---|
| 4 | 4 | R.C.C. as per approved design including fixing various pipes and ventilator top and fixing of M.S. sheet of 10 mm gauge manhole cover of 60 cm x 60 cm size with frame and locking arrangement and railing including supply of all material. | | | |
|---|
| 5 | 5 | Spiral R.C.C. stair case with 1.0 m minimum clear width attached with tank body as an access to Balcony and Top Dome of tank from ground level as per design & drawing with 1.25 m high railing and gate with cabin as per specification including supply of all materials. | | | |
|---|
| 6 | 6 | Supply and fixing of M.S. ladder from inside of the tank body from roof to the bottom dome of the tank in a slope of 3: 1 (3 vertical: 1 horizontal) with railing as specified. | | | |
|---|
| 7 | 7 | Railing on staircase & its landings, all around balcony & top dome for access up to ventilator as specifications including supply of all material. Railing shall be provided in three rows of G.I. pipe 20 mm dia. Also M.S. gate with M.S. wire cage at stairs. | | | |
|---|
| 8 | 8 | Supply and fixing of water level indicator as per specifications and fixing of lightening conductor and earth plate etc. as per specifications. | | | |
|---|
| 9 | 9 | Testing of tank for water tightness as per specifications enclosed including supply of water. | | | |
|---|
| 10 | 10 | Supply of all materials and construction of 80mm thick R.C.C. floor, apron and 15 cm dia semi circular drain around apron in a slope towards wash out chamber. | | | |
|---|
| 11 | 11 | Three coats of approved quality and shade of Apex Painting of as per direction of Engineer incharge over concrete work including supply of all materials etc. | | | |
|---|
| 12 | 12 | Three coats of anti corrosive / aluminum / black Japan paint of approved quality on all iron work including supply of all material, labour and T&P etc. | | | |
|---|
| 13 | 13 | Supply, carting and fixing of following sizes D.I.D/F pipes with required specials such as reducers, duck foot bend etc. (bell mouth etc. in inlet) the tank including supply of M.S.clamps, rubber insertion sheet, nut bolts,washer etc. complete as per specifications as per tender document. | | | |
|---|
| 14 | 14 | Supplying and fixing of following sizes C.I. D/F sluice valves as per relevant latest 1.S. specifications including supply of all jointing and other materials such as rubber insertion sheet, nut bolts, washer etc. complete as per Specifications as per tender document. | | | |
|---|
| 15 | 15 | Supply of all materials labour T&P and construct brick masonry sluice valve Chambers including R.C.C. cover as per deptt. type design at inlet, outlet and Washout pipes. The R.C.C. cover shall be casted in M.S. Channel section with handles on both sides. (Sluice valve chamber for over flow & wash out may be combined) | | | |
|---|
| 16 | 16 | The words U.P. Jal Nigam, year of construction, capacity of O.H.T. and slogan approved by Engineer in charge shall be painted prominently in Block Letters not less than 30 cm. in height. | | | |
|---|
| 17 | 17 | Maintenance for 12 months including supply of all materials, labour, T&P etc. complete. | | | |
|---|
| 18 | 18 | SCHEDULE G-2 (Construction of Pump House cum Chloronome) | | | |
|---|
| 19 | 19 | Supply of all materials and construction of Pump House cum chloronome (3.6m x 3.0m x 3.0m) size as per drawing and three coats of apex paint as per departmental code. | | 1 | No |
|---|
| 20 | 20 | SCHEDULE G-3 (Construction of half set of Staff Quarter) | | | |
|---|
| 21 | 21 | Supply of all materials and construction of half set of staff quarter for operator as per departmental drawing with sanitary fittings and electric fittings and three coats of apex paint as per departmental code complete. | | 1 | set |
|---|
| 22 | 22 | SCHEDULE G-4 (Construction of Boundary wall, Gate, approach road etc. Complete) | | | |
|---|
| 23 | 23 | Provide all materials, labour, T&P etc for construction of 1.5 m high boundry wall at water works compound and drawing provided by the Department (attached) . | | 115 | m |
|---|
| 24 | 24 | Provide all materials, labour, T&P and fabricate and fixing of Iron gate with pillar as per design and drawing on the water works 3.6 m wide . | | 1 | Each |
|---|
| 25 | 25 | Provide all materials, labour, T&P and construct B.O.E. pavement for material approach roads with Ist class bricks laid dry joints filled with sand including preparation of base etc complete. | | 90 | Sqm |
|---|
| 26 | 26 | Earth filling | | 170 | cum. |
|---|
| 27 | 27 | SCHEDULE G-5 (Construction of ground water recharge arrangement) | | | |
|---|
| 28 | 28 | Construction of Recharge of ground water by roof top rain water of Pump house & staff quarter, water available from bye pass of tube well and over flow of over head tank as per drawing including supply of all materials, labour, T&P etc. complete. | | 1 | Each |
|---|
| 29 | 29 | SCHEDULE G-6 (Rising Main with bye pass arrangement) | | | |
|---|
| 30 | 30 | Supply of the following pipes with all specials including carting laying & jointing of pipes into the trenches for rising main and bye pass including cost of all T, Bend, Reducer & jointing material, labour and T&P testing etc. complete. | | | |
|---|
| 31 | 31 | D.I. pipe Class-K-7 | | | |
|---|
| 32 | 32 | 100 mm dia | | 35 | m |
|---|
| 33 | 33 | Supply of all materials, labour, T&P and construct following Chamber as per departmental drawing & design. | | | |
|---|
| 34 | 34 | Sluice Valve Chamber ( Masonary Type ) | | 1 | Each |
|---|
| 35 | 35 | Supply and fixing of following types of fittings including railway frieght, cartage up to store, all taxes and duties complete and lowering fixing and jointing of following fittings in trenches. | | | |
|---|
| 36 | 36 | (A) Sluice Valve/ Wheel Valve | | | |
|---|
| 37 | 37 | 100 mm dia | | 1 | Each |
|---|
| 38 | 38 | THRUST BLOCK | | | |
|---|
| 39 | 39 | R.C.C. with cement, coarse sand & 20 mm gauge stone ballast in proportion of 1:2:4 in thrust blocks of pipe line including supply of reinforcement and its fixing and binding the same with 0.50 mm thick binding wire on position and necessary centering & sh | | 0.98 | cum. |
|---|
| 40 | 40 | Mild steel or iron work in RCC wrought to required shape as necessary including bending for proper completion of work including supply of steel and wastage etc. | | 0.79 | Qtl. |
|---|
| 41 | 41 | SCHEDULE G-7 (Laying of Pipeline and apptt. works) | | | |
|---|
| 42 | 42 | Earth work in soil mixed with loam, clay or sand with lift upto 1.50 m and lead upto 50 m, filling, watering and ramming of excavated earth into the trenches and disposal of surplus earth upto 50 M. | | 3643.33 | m³ |
|---|
| 43 | 43 | Supply of following sizes of pipes including railway freight and cartage, all taxes and duties complete. | | | |
|---|
| 44 | 44 | PVC Pipe 6 kg/sq cm | | | |
|---|
| 45 | 45 | 90 mm dia | | 4527 | M |
|---|
| 46 | 46 | 110 mm dia | | 204 | M |
|---|
| 47 | 47 | 140 mm dia | | 60 | M |
|---|
| 48 | 50 | Carting, laying and jointing of the following size of pipes including specials (Specials arranged by the contractor from his own cost) into the trenches including cost of all jointing material, labour and T&P testing etc. complete. | | | |
|---|
| 49 | 51 | PVC Pipe 6 kg/sq cm | | | |
|---|
| 50 | 52 | 90 mm dia | | 4527 | M |
|---|
| 51 | 53 | 110 mm dia | | 204 | M |
|---|
| 52 | 54 | 140 mm dia | | 60 | M |
|---|
| 53 | 57 | Supply of all materials, labour, T&P for construction of following chambers as per departmental drawing & design. | | | |
|---|
| 54 | 58 | I. Sluice Valve Chamber (Surface Box Type) | | 6 | Each |
|---|
| 55 | 60 | III. Fire Hydrant Chambers | | 1 | Each |
|---|
| 56 | 61 | VI. Air Valve Chambers | | 1 | Each |
|---|
| 57 | 62 | Supply and fixing of following types of fittings including railway frieght, cartage up to site, all taxes and duties etc. complete. | | | |
|---|
| 58 | 63 | (A) C. I. Sluice Valve / Wheel Valve | | | |
|---|
| 59 | 64 | 80mm dia | | 5 | Each |
|---|
| 60 | 65 | 100mm dia | | 1 | Each |
|---|
| 61 | 67 | (B) Scour Valve 50 mm dia | | 2 | Each |
|---|
| 62 | 68 | (C) Fire Hydrants 80 mm dia | | 1 | Each |
|---|
| 63 | 69 | (D) Air Valve 25 mm dia | | 1 | Each |
|---|
| 64 | 70 | Construction of single Tap Masonary pillar type stand post as per type design including supply of all matrials labour T&P etc. complete. | | 5 | Each |
|---|
| 65 | 71 | Dismantling of following types of road surface for laying of pipe line Including sorting out of serviceable material and disposal of unserviceable material up to 50 m. | | | |
|---|
| 66 | 72 | B.O.E.Road | | 658.26 | Sqm |
|---|
| 67 | 73 | C.C.Road | | 202.39 | Sqm |
|---|
| 68 | 74 | Bituminous. Road | | 565.74 | Sqm |
|---|
| 69 | 75 | Reinstatement of following types of road surface for laying of pipe line Including supply of all material, labour, T&P etc. complete in the direction of engineer incharge. | | | |
|---|
| 70 | 76 | B.O.E. Road (40% with new bricks) | | 263.3 | Sqm |
|---|
| 71 | 77 | B.O.E. Road (60% with old bricks) | | 394.96 | Sqm |
|---|
| 72 | 78 | C.C.Road | | 202 | Sqm |
|---|
| 73 | 79 | Bituminous Road | | 565.74 | Sqm |
|---|
| 74 | 80 | Nala crossing / Culvert crossing | | | |
|---|
| 75 | 81 | For 1 mt to 2 mt. | | 8 | Nos. |
|---|
| 76 | 82 | For more then 2 mt | | 3 | Nos. |
|---|
| 77 | 83 | Provision of house connection upto Kitchen & Toilet (with seperate Bib cock) of individual household including all G.I. Pipe and specials upto 10 Mts. with PVC Saddle, Brass ferrule etc. with dismantling and reinstatement of road suface (any type). | | 310 | No. |
|---|
| 78 | 84 | SCHEDULE for E&M works | | | |
|---|
| 79 | 85 | Construction of Tube Well in Shakutpur Village capable of providing 400 LPM sand free discharge, including MS Pipes 7.1 mm thickness, Drilling of bore, supplying, fixing & lowering of housing pipe as per IS : 4270 including M.S. sockets duly welded with M.S. electrodes to have extra strength. Tubewell Assembly containing of MSERW housing pipe, Plain/ Slotted pipe, M.S. reducer, M.S. bail plug, M.S. Clamp, well Cap, M.S. rings, Centre guide, etc of desired size. Development by Air compressor & O.P. Unit. with transportation of all materials, T&P etc required for proper completion of work including testing of water sample as per specification :\n-Telescopic boring upto total depth of 110m BGL consisting of drilling including Zone testing with all required material complete in all respect (3 nos) and electrical logging of bore well from UPJN logger or authorised logger from UPJN : \n- 550 mm dia. bore from G.L. to 60m BGL.\n- 500 mm dia. bore from 60m to 90m BGL.\n-500 mm dia. bore from 90m to 110m BGL.\n.-Supplying, Transporting and Carting of MSERW Tubewell Pipe 7.1 mm thick ( Tubewell pipe must be of 6.00 mtr length and approximate) and Accesories complete in all respect upto Site. Lowering of Tubewell pipe including supply and shrouding of Lal kuan Pea Gravel 1.6-4.8 mm size ( Qty 42 Cubic Meter ) for T.W. (as per requirement) as per IS:4097-1988, plain/slotted pipe as following :\n- 200 mm dia MS housing pipe from GL to 54m BGL . \n- 150 mm dia MS Blind/slotted pipe 54m to 90m BGL ( Slotted pipe length may Vary 18 mtr to 24 mtr as per Strata found and instruction from Engineer in Charge)\n- 150 mm dia MS Blind/slotted pipe 90m to 100m BGL\n- Supply of suitable size and quantity M.S. Reducer, M.S. bail plug, M.S. clamp, M.S. well cap, M.S. rings, suitable number of centre guide & support girder etc as per requirement.\n- Development of Tubewell by 250 PSI Air Compressor ( 35 Hrs) or as per requirement and as per specification.\n- Development of Tubewell by 3 cusec capacity O.P. unit (70 Hrs). - Barricading of Site during entire work period using caution tapes and plastic cones etc. - Chemical, Bacteriological & Heavy Metal Test of Water Sample from UPJN lab or in case of unavailabilty of particular test than in this case from any Govt. Labs like NITRA or any other private reputed lab authorised by Engineer in Charge. \nNote : Depth of Tubewell is tentative however actual depth will depend upon the availability of suitable aquifer to achieve the required sand free discharge. Hence as per the actual bored depth of tubewell proportionate deduction/escalation (per meter depth) on pro-rate basis will be applicable. | BI01010001010000000000000515BI0100001113 | 1 | Job |
|---|
| 80 | 86 | Supply, Installation, Testing and Commissioning of 400 LPM, 39 meter head 7.50 H.P. submersible clear water Pump set (As per IS 8034:1989) including Switch gear SD starter (cubical panel board, with kit ,starter, cable, power wiring & earthing etc) necessary tools, Main piping in 33 mtr length & Sluice and Reflex valves 80 mm dia and 4.80 mm thickness, Electromagnetic online flow meter 80 mm dia,pressure gauge, depth gauge with their fittings, double earthing. Supply and fixing of suitable size chlorinating plant 0-6 lph. Supply and fixing of 3 ton capacity 4.5 m lift chainpully block, Electric resistance rubber sheet of 1x2 m size 12.5 mm thick, Tubewell Cover, Painting in 2 coat with anti- corrosive paint complete in all respect as per detailed specifications. (All supply will be done after the approval of Engineer-in-charge. Note- Pump HP will be rechecked after commissioning of tubewell and if any changes encountered in Discharge and Head then Pump HP will be re-evaluated and payment will be made as per Actual based on Estimated and Circulated Rates. | BI01010001010000000000000515BI0100001114 | 1 | Job |
|---|
| 81 | 87 | 6 point wiring of Pump house for light with 1.00 sq.mm PVC insulated multi strand copper conductor cable in rigid PVC condult pipe on surface complete 14 S.W.G. copper earth continuously wire piano type switch and celling rose/angle/baton holder on 3mm thick phenolic laminated back light sheet etc complete in all respect including luminaries with 154 amp. switch fuse unit as per instruction of Engineer-in-charge after approval of drawing. | BI01010001010000000000000515BI0100001115 | 1 | Job |
|---|
| 82 | 88 | SITC of LED Light 18 Watt with suitable capacity Solar Panels and with 100 Ah battery on 6 mtr Steel Pole with dusk to dawn switch in water work campus with solar pannel & all accessories and fitting. | BI01010001010000000000000515BI0100001116 | 1 | Job |
|---|
| 83 | 89 | Supply, installation, testing & commissioning of 15 KVA capacity servo Voltage stabilizer fully copor winding input voltage 200-480 Volt or suitable range as per site condition and output voltage 415 ±1%, 3 phase 50 Hz AC for satisfactorily run the above pump set, complete in all respect as per detailed specifications. | BI01010001010000000000000515BI0100001117 | 1 | Job |
|---|
| 84 | 90 | Erection & commissioning of Transmission line of ACSR weasel conductor including all materials i.e. poles, conductors , insulators, required cable, etc from the nearest existing H.T. line \nSupply & fixing of 11KV/0.433kV, 63KVA Transformer with Double Pole Sub Station including security charges , Energy Meter, System loading charges , Fixed charges, processing fees etc completed in all respect. | BI01010001010000000000000515BI0100001118 | 1 | Job |
|---|
| 85 | 91 | Installation of suitable capacity simple T.W. automation system to control operation of the pumping plant with respect to high/low water level in OHT and 80 mm size electromagnetic online flowmeter in delivery line of TW inside the pump house with arrangement for communication of data with GSM and GPRS system to show required parameters including all accessories etc. complete in all respect as per instructions of Engineer -in –charge. | BI01010001010000000000000515BI0100001119 | 1 | Job |
|---|