BATCH HOUSE BATCH HOUSE CAPACITY -SUITABLE FOR 2MT GLASS PRODUCTION, WITH FEEDING & STORAGE Loading systems (mechanical or pneumatic) customised for the specific raw material,for making reliable filling of the silos .,Materials are weighed by fully electronic scales. The scales are specifically dimensioned with regard to the individual components and optimal precision is maintained A homogeneous batch is essential to achieve good melting efficiency. High-performance mixer.Ultra-modern automated equipment (programmable logic controller), weighing and dosing computers as well as a SCADA system for visualising the processes control and monitor batch production. Fully automatic and completely independent of human intervention. SCADA stations control the dialogue between man (the operator) and the machine (the plant). These can be integrated both into the batch plant control room and centrally in the furnace control room with proper conveying methodology\nNOTE: WE NEED EQUIPMENT ON TURNKEY BASIS\n\n\n\n\n
1
1
EACH
2
2
RAW MATERIAL \nSTORAGE CELL\n\nALL THESE EQUIPMENTS ARE REQUIERED TO \nMEET THE PRODUCTION CAPECITY OF 2 MT TON \nGLASS PRODUCTION.\nNOTE: WE NEED EQUIPMENT ON TURNKEY BASIS\n\n\n
2
1
EACH
3
3
SILO MIXED BATCH\n\nALL THESE EQUIPMENTS ARE REQUIERED TO \nMEET THE PRODUCTION CAPECITY OF 2 MT TON \nGLASS PRODUCTION.\nNOTE: WE NEED EQUIPMENT ON TURNKEY BASIS\n\n\n
3
1
EACH
4
4
MAGNETIC SEPARATOR \n500 KG/H\n\nALL THESE EQUIPMENTS ARE REQUIERED TO \nMEET THE PRODUCTION CAPECITY OF 2 MT TON \nGLASS PRODUCTION.\nNOTE: WE NEED EQUIPMENT ON TURNKEY BASIS\n\n\n
4
1
EACH
5
5
CULLET PROCESSING \nPLANT\n\nALL THESE EQUIPMENTS ARE REQUIERED TO \nMEET THE PRODUCTION CAPECITY OF 2 MT TON \nGLASS PRODUCTION.\nNOTE: WE NEED EQUIPMENT ON TURNKEY BASIS\n\n\n
5
1
EACH
6
6
INCLINE CONVEYER\n\nALL THESE EQUIPMENTS ARE REQUIERED TO \nMEET THE PRODUCTION CAPECITY OF 2 MT TON \nGLASS PRODUCTION.\nNOTE: WE NEED EQUIPMENT ON TURNKEY BASIS\n\n\n
6
1
EACH
7
7
VIBRATING SIEVE\n\nALL THESE EQUIPMENTS ARE REQUIERED TO \nMEET THE PRODUCTION CAPECITY OF 2 MT TON \nGLASS PRODUCTION.\nNOTE: WE NEED EQUIPMENT ON TURNKEY BASIS\n\n\n
7
1
EACH
8
8
WEIGHTING BALANCE \nDIGITAL CAPACITY 2MT\n\nALL THESE EQUIPMENTS ARE REQUIERED TO \nMEET THE PRODUCTION CAPECITY OF 2 MT TON \nGLASS PRODUCTION.\nNOTE: WE NEED EQUIPMENT ON TURNKEY BASIS\n\n\n
8
1
EACH
9
9
ELECTRONIC BALANCE \nCAPACITY 500 grm\n\nALL THESE EQUIPMENTS ARE REQUIERED TO \nMEET THE PRODUCTION CAPECITY OF 2 MT TON \nGLASS PRODUCTION.\nNOTE: WE NEED EQUIPMENT ON TURNKEY BASIS\n\n\n
9
1
EACH
10
10
BUCKET ELEVATOR FOR \nCULLET & SAND\n\nALL THESE EQUIPMENTS ARE REQUIERED TO \nMEET THE PRODUCTION CAPECITY OF 2 MT TON \nGLASS PRODUCTION.\nNOTE: WE NEED EQUIPMENT ON TURNKEY BASIS\n\n\n
10
1
EACH
11
11
BUCKET ELEVATOR FOR \nFEEDING BATCH\n\nALL THESE EQUIPMENTS ARE REQUIERED TO \nMEET THE PRODUCTION CAPECITY OF 2 MT TON \nGLASS PRODUCTION.\nNOTE: WE NEED EQUIPMENT ON TURNKEY BASIS\n\n\n
11
1
EACH
12
12
CONVEYER FOR \nFEEDING BATCH\n\nALL THESE EQUIPMENTS ARE REQUIERED TO \nMEET THE PRODUCTION CAPECITY OF 2 MT TON \nGLASS PRODUCTION.\nNOTE: WE NEED EQUIPMENT ON TURNKEY BASIS\n\n\n
12
1
EACH
13
13
CONVEYER\n\nALL THESE EQUIPMENTS ARE REQUIERED TO \nMEET THE PRODUCTION CAPECITY OF 2 MT TON \nGLASS PRODUCTION.\nNOTE: WE NEED EQUIPMENT ON TURNKEY BASIS\n\n\n
13
1
EACH
14
14
HOPPER\n\nALL THESE EQUIPMENTS ARE REQUIERED TO \nMEET THE PRODUCTION CAPECITY OF 2 MT TON \nGLASS PRODUCTION.\nNOTE: WE NEED EQUIPMENT ON TURNKEY BASIS\n\n\n
14
1
EACH
15
16
BATCH CHARGES\n\nALL THESE EQUIPMENTS ARE REQUIERED TO \nMEET THE PRODUCTION CAPECITY OF 2 MT TON \nGLASS PRODUCTION.\nNOTE: WE NEED EQUIPMENT ON TURNKEY BASIS\n\n\n
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.