| 1 | 1 | Clearing light jungle including all cost of labour, lead, lift etc complete. | BI01010001010000000000000515BI0100001116 | 12900 | M² |
|---|
| 2 | 2 | Conducting check survey,pit marking for tower foundation as per the approved profile including cost of all T & Ps, transport, labour, lead lift etc complete. | BI01010001010000000000000515BI0100001116 | 18 | Loc |
|---|
| 3 | 3 | Earthwork excavation in all classes of soil inlcuding all cost of all lead and lift etc complete. | BI01010001010000000000000515BI0100001112 | | |
|---|
| 4 | 3.01 | In hard gravelly soil | BI01010001010000000000000515BI0100001116 | 397 | M³ |
|---|
| 5 | 3.02 | Earthwork excavation in soft disintegrated rock or kankar not requiring blasting. | BI01010001010000000000000515BI0100001116 | 199 | M³ |
|---|
| 6 | 3.03 | Earthwork excavation in MR and DMR requiring blasting. | BI01010001010000000000000515BI0100001117 | 199 | M³ |
|---|
| 7 | 3.04 | Earthwork excavtion in hard rock measured in solid including blasting etc.,complete | BI01010001010000000000000515BI0100001116 | 149 | M³ |
|---|
| 8 | 3.05 | Hard rock by wedging, chisselling and trimming to proper shape where blasting is prohibited | BI01010001010000000000000515BI0100001116 | 49 | M³ |
|---|
| 9 | 4 | Transporting and fixing of stub and cleat with hiring charges for template and assembling at site and shifting the template from loc to loc including cost of all materials for stub and cleat and template ,labour, fabrication charges etc complete. | BI01010001010000000000000515BI0100001112 | | |
|---|
| 10 | 4.01 | GCR | BI01010001010000000000000515BI0100001117 | 9 | Loc |
|---|
| 11 | 4.02 | HCR | BI01010001010000000000000515BI0100001117 | 5 | Loc |
|---|
| 12 | 4.03 | KCR | BI01010001010000000000000515BI0100001116 | 1 | Loc |
|---|
| 13 | 4.04 | GCO | BI01010001010000000000000515BI0100001117 | 3 | Loc |
|---|
| 14 | 5 | PCC 1:3:6 using 20mm metal for foundation without formwork including cost of all materials lead lift etc complete. | BI01010001010000000000000515BI0100001116 | 29 | M³ |
|---|
| 15 | 6 | PCC 1:2:4 using 20mm metal for foundation footing and chimney concrete with steel frustum box and chimney box including cost of all materials, lead, lift, frustum box, chimney box, etc complete. | BI01010001010000000000000515BI0100001117 | 147 | M³ |
|---|
| 16 | 7 | Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete. | BI01010001010000000000000515BI0100001112 | | |
|---|
| 17 | 7.01 | GCR-W | BI01010001010000000000000515BI0100001116 | 9 | Loc |
|---|
| 18 | 7.02 | HCR-W | BI01010001010000000000000515BI0100001117 | 5 | Loc |
|---|
| 19 | 7.03 | KCR-W | BI01010001010000000000000515BI0100001117 | 1 | Loc |
|---|
| 20 | 7.04 | GCO-W | BI01010001010000000000000515BI0100001116 | 3 | Loc |
|---|
| 21 | 8 | Removal of surplus earth in a low lying area to a average distance of 200m by head load. | BI01010001010000000000000515BI0100001117 | 176 | M³ |
|---|
| 22 | 9 | Providing pipe type earthing including necessary excavation for fixing 3m long 25mm dia GI \"B\" class pipe and refilling with excavated earth mixed with soft charcoal and connect the earthstrip with the leg of the stub including all cost of materials, lead, lift etc complete. | BI01010001010000000000000515BI0100001116 | 18 | loc |
|---|
| 23 | 10 | Dewatering charges during excavation and concreting with 3/5 HP Diesal motor with Pump including hire charges, labour,fuel,oil,transport etc complete | BI01010001010000000000000515BI0100001117 | 20 | hrs. |
|---|
| 24 | 11 | Labour charges for transport and erection of GI/HT tower parts including T &P, labour, lead, lift etc complete.as per approved drawing and specification. (Tower will be supplied by board) | BI01010001010000000000000515BI0100001117 | 73 | Mt |
|---|
| 25 | 12 | Labour charges for transporting and hoisting of 7 units of 90 KN insulators with SS fittings for panther including cost of all labour,lead, lift, T & P etc complete. | BI01010001010000000000000515BI0100001116 | 45 | Sets |
|---|
| 26 | 13 | Labour charges for transport and hoisting of 8 units of 120 KN insulators and fixing of ST fittings for panther, S.B damper with all allied hardwares including all cost of labour,lead, lift, T & P etc complete. | BI01010001010000000000000515BI0100001116 | 40 | Sets |
|---|
| 27 | 14 | Labour charges for transport and stringing of 3 Nos of Panther conductor from department store, paying out, jointing, rough sagging, tensioning, clipping, providing vibration dambers at tension locations including jumber connections, providing trussals at various intervals for avoiding damages of conductor including transport charges, loading, unloading, lead, lift, labour and cost of T&P etc complete. | BI01010001010000000000000515BI0100001117 | 5.5 | Km |
|---|
| 28 | 15 | Labour charges for transport and stringing of 7/3.55mm GI earthwire from Department store and fixing of GI earthwire hardwares (ie ST fittings,SS fittings, D shackle, U bolt etc) wherever required, paving out, jointing,rough sagging, tensioning,including jumber connection transport charges, loading,unloading ,lead, lift, cost of T&P, etc complete. | BI01010001010000000000000515BI0100001116 | 5.5 | Km |
|---|
| 29 | 16 | PCC 1:2:4 using 20mm metal for muffing coping concrete with form work including cost of all materials, labour, lead, lift, etc complete . | BI01010001010000000000000515BI0100001117 | 8 | M³ |
|---|
| 30 | 17 | Plastering with CM 1:3,12 mm thick for muffing coping concrete including cost of all materials, labour, lead, lift etc complete | BI01010001010000000000000515BI0100001117 | 83 | M² |
|---|
| 31 | 18 | Supply,fabrication and fixing of name board with 18 gauge plate including cost of materials, labour for writing name of the line etc complete | BI01010001010000000000000515BI0100001116 | 18 | Nos |
|---|
| 32 | 19 | Painting with two coats of anticorrosive paint over tower leg at a height of 45cm including all cost of materials,labour, lead lift etc complete | BI01010001010000000000000515BI0100001116 | 18 | Loc |
|---|
| 33 | 20 | Providing temporary guys wherever necessary including excavation, buryingout of anchor for staywire, tightening, dismantling the same after completion of works including cost of all materials, lead, lift, labour etc complete. | BI01010001010000000000000515BI0100001117 | 6 | Nos. |
|---|
| 34 | 21 | Lowering the HT/LT Line during stringing of power conductor and earthwire after restringing the same in original position including labour,lead, lift etc complete | BI01010001010000000000000515BI0100001116 | 42 | Nos. |
|---|
| 35 | 22 | Labour charges for removal of trees | BI01010001010000000000000515BI0100001112 | | |
|---|
| 36 | 22.01 | Large tree | BI01010001010000000000000515BI0100001117 | 80 | Nos. |
|---|
| 37 | 22.02 | Small tree | BI01010001010000000000000515BI0100001117 | 80 | Nos. |
|---|
| 38 | 23 | Providing full welding of all bolts and nuts in the erected towers from ground level to the cross arm bottom level in the tower including painting of bolts and nuts with two coats of best quality of cold galvanised paint having atleast 90% zinc content and approved by the Engineer at site including cost of paint and all other materials, hire charges for diesel generator and welding transformer, all labour, transport charges etc complete. | BI01010001010000000000000515BI0100001116 | 10130 | Nos. |
|---|
| 39 | 24 | Providing trussels for minor road crossing including cost of all materials,labour, lead lift etc. Complete. | BI01010001010000000000000515BI0100001116 | 18 | Nos. |
|---|
| 40 | 25 | Labour charges for fixing number plate, phase plate and danger board including lead lift etc | BI01010001010000000000000515BI0100001117 | 18 | Loc |
|---|
| 41 | 26 | Labour charges for dismantling of GI tower angles including cost of materials,T & P,labour, lead, lift etc complete. as per approved drawing and specification | BI01010001010000000000000515BI0100001116 | 32.78 | Mt |
|---|
| 42 | 27 | Labour charges for Releasing of 7 units of 90 KN insulators with SS fittings for leopard including cost of all labour,lead, lift, T & P etc complete. | BI01010001010000000000000515BI0100001117 | 51 | Sets |
|---|
| 43 | 28 | Labour charges for releasing of 8 units of 90 KN insulators and fixing of ST fittings for leopard S.B damper with all allied hardwares including all cost of labour,lead, lift, T & P etc complete. | BI01010001010000000000000515BI0100001117 | 12 | Sets |
|---|
| 44 | 29 | Labour charges for Releasing of 3 Nos of dog conductor and vibration dambers at tension locations including jumber connections, including transport charges, loading, unloading, lead, lift, labour and cost of T&P etc complete. | BI01010001010000000000000515BI0100001116 | 5.4 | Km |
|---|
| 45 | 30 | Labour charges for releasing of 1 No of7/3.55mm GI earthwire including Aluminium earth bond including transport charges, loading, unloading, lead, lift, labour and cost of T&P etc complete. | BI01010001010000000000000515BI0100001116 | 5.4 | Km |
|---|
| 46 | 31 | Devolution of 90 KN & 120 KN disc insulator to store including Tansportation charges from site to store, labour, lead lift etc., complete. | BI01010001010000000000000515BI0100001117 | 3.08 | Mt |
|---|
| 47 | 32 | Supply of ST fitting for Panther | BI01010001010000000000000515BI0100001116 | 40 | Sets |
|---|
| 48 | 33 | Supply of SS fitting for Panther without PA rod | BI01010001010000000000000515BI0100001117 | 5 | Sets |
|---|
| 49 | 34 | Supply of SS fitting for Panther with PA rod | BI01010001010000000000000515BI0100001117 | 40 | Sets |
|---|
| 50 | 35 | Supply of SB Damber for Panther | BI01010001010000000000000515BI0100001116 | 40 | Sets |
|---|
| 51 | 36 | Supply of Tension fittings for EW 7/3.55mm | BI01010001010000000000000515BI0100001116 | 12 | Sets |
|---|
| 52 | 37 | Supply of Suspension fittings for EW 7/3.55mm | BI01010001010000000000000515BI0100001117 | 12 | Sets |
|---|
| 53 | 38 | Supply of Aluminium Earth bond | BI01010001010000000000000515BI0100001116 | 15 | Nos |
|---|
| 54 | 39 | Supply of Mid span joint for panther | BI01010001010000000000000515BI0100001117 | 5 | Nos |
|---|
| 55 | 40 | Supply of Repair sleeve for panther | BI01010001010000000000000515BI0100001117 | 5 | Nos |
|---|
| 56 | 41 | Supply of Number Plate | BI01010001010000000000000515BI0100001116 | 18 | Nos |
|---|
| 57 | 42 | Supply of Phase Plate | BI01010001010000000000000515BI0100001116 | 18 | Sets |
|---|
| 58 | 43 | Supply of Danger Board | BI01010001010000000000000515BI0100001117 | 10 | Nos |
|---|
| 59 | 44 | CREDIT VALUE\nDismantling the existing 110 KV line [As is where is condition] consisting of various type of (Approximately) G.I/M.S.tower angle scrap - 32.78 MT, Dog conductor Scrap -6.38 MT, G.I.Earth wire scrap - 2.94 MT) clearing from the site on cost to paid to TANTRANSCO The quoted amount shall not be less than the board fixed minimum bid amount of Rs.13,97,080/- | BI01010001010000000000000515BI0100001117 | 1 | Lot |
|---|