Brahmaputra Cracker And Polymer Limited-BCPL has published Annual Maintenance Contract Of Horticulture And Landscaping Work At Bcpl , Township , Sivsagar Please Refer Tender Documents . . Submission Date for this Tender is 28-08-2019. Civil Work Tenders in Please refer Tender documents. Assam. Bidders can get complete Tender details and download the document.
Name of Work: ANNUAL MAINTENANCE CONTRACT OF HORTICULTURE & LANDSCAPING WORK AT BCPL, TOWNSHIP, SIVSAGAR | |||||
---|---|---|---|---|---|
Sl. No. | Description of the item | Item Code / Make | Quantity | Units | |
1 | 10 | Monthly Retainership\nLong Text:\nProviding services of Unskilled Manpower for attending day to day maintenance works.(Bidder not to quote) | Nil11 | 4992 | DAY |
2 | 20 | Supervision Charges\nLong Text:\nProviding Services of Skilled Supervisor for attending day to day maintenance works(Bidder not to quote) | Nil12 | 624 | DAY |
3 | 30 | Provision for PF\nLong Text:\nProvision for PF on activity line no. 10&20(Bidder not to quote) | Nil13 | 321615 | EA |
4 | 40 | Provision for Bonus\nLong Text:\nProvision for Bonus(Bidder not to quote) | Nil14 | 206081 | EA |
5 | 50 | Provision for ESIC\nLong Text:\nProvision for ESIC(Bidder not to quote) | Nil15 | 117513 | EA |
6 | 60 | Provision for minimum wages\nLong Text:\nProvision for adjustment/revision of minimum wages within the contract period as notified by statutory authority.(Bidder not to quote) | Nil16 | 183256 | EA |
7 | 70 | Provision for statutory payments etc.\nLong Text:\nProvision for annual leave with wages, uniform (2sts) and basic PPE, non- statutory allowance etc. payment shall be made as per actual on submission of adequate documents/submission of proof of purchase and distribution as per terms &conditions of contract(Bidder not to quote) | Nil17 | 670498 | EA |
8 | 80 | Service Charges\nLong Text:\nFacility Management Charges on item nos. 10 & 20 towards contractors, tools & tackles etc. (% to be quoted by the bidder, quoted % cannot be in negative) Note: Minimum Labour wages is to be paid as per the latest norms of office of the Chief Labour Commissioners ( Central) from time to time | Nil18 | 2.2907e+06 | % |
9 | 90 | Earth Supply\nLong Text:\nEarth: Supplying, stacking, filling and leveling of good earth at site as directed including royalty and carriage (earth measured in stacks will be reduced by 20% for payment) | Nil19 | 25 | M3 |
10 | 100 | Grassing by Doob/Carpet Grass\nLong Text:\nGrassing: Supplying and dibbling of selected lawn grass (Doop Grass (CynodonDactylon), Caropet Grass (AxonopusAffinis) after preparing the land by ploughing/ working to a depth of 40-45 cm, removing of all unwanted debris (rubbles, pebbles, plant root etc.), mixing of organic manure, leveling the surface including watering and maintenance of the lawn for 30 days or more till grass forms a thick lawn free from weeds and for mowing. | Nil20 | 100 | M2 |
11 | 110 | Hedge Planting with Durantaetc.\nLong Text:\nHedge Planting:Supplying and planting ofsuitable plant materials for preparation ofprotective/externalhedge (50 cm wide)including thepreparation of ground bymixing organic manureand fertilizers as perspecification. | Nil21 | 500 | M |
12 | 120 | Pot Planting\nLong Text:\nPot Planting:Supplying & planting of seasonal flower(with pots) to keep the plants in healthy and good condition including filling the pot to the top surface with appropriate soil media made of garden soil, river sand, cow-dung, leaf mould, fertilizer, pesticides. The itemincludes the cost of plants & pots with necessary transportation charges & paintingcharges and cost of plastic base plates,moss sticks with all other requiredmaterials/ consumables etc. complete, butexcluding the cost of Labour (Mali), whichshall paid separately under relevant SOR item. | Nil22 | 25 | EA |
13 | 130 | Pot Planting with Bottle Palm\nLong Text:\nPot Planting: Supplying and planting of palms with required size of pot including filling the pot to the top surface with appropriate soil media made of garden soil, river sand,cowdung etc. complete asspecified and directed. | Nil23 | 10 | EA |
14 | 140 | Pot Planting with Erica Palm/KentiaPalm\nLong Text:\nPot Planting:Supplying and planting of palms with required size of pot including filling the pot to the top surface with appropriate soil media made of garden soil, river sand,cowdung etc. complete as specified and directed. | Nil24 | 10 | EA |
15 | 150 | Pot Planting with Chinese Palm\nLong Text:\nPot Planting: Supplying and planting of palms with required size of pot including filling the pot to the top surface with appropriate soil media made of garden soil, river sand, cowdung etc. complete as specified and directed. | Nil25 | 10 | EA |
16 | 160 | Shade Tree\nLong Text:\nTree Planting: Supplying and planting ofornamental trees (plant sapling height 1'-0")including pit making(60cmX60cmX60cm), filling the pit with appropriate soil media,manure and fertilizers as per specifications. | Nil26 | 10 | EA |
17 | 170 | Flowering Tree\nLong Text:\nTree Planting: Supplying and planting ofornamental trees (plant sapling height 1'-0")including pit making(60cmX60cmX60cm), filling the pit with appropriate soil media, manure and fertilizers as per specifications | Nil27 | 10 | EA |
18 | 180 | Fruit Tree\nLong Text:\nTree Planting: Supplying and planting ofornamental trees (plant sapling height 1'-0")including pit making(60cmX60cmX60cm), filling the pit with appropriate soil media,manure and fertilizers as per specifications. | Nil28 | 10 | EA |
19 | 190 | Shrub planting with Radhachura etc.\nLong Text:\nShrub Planting: Supplying and planting ofornamental shrub (below 1'-0" height) including pit making(60cmX60cmX60cm), filling the pit with appropriate soil media, manure and fertilizers as per specifications. | Nil29 | 20 | EA |
20 | 200 | Shrub planting with Allmanda etc.\nLong Text:\nShrub Planting: Supplying and planting ofornamental shrub (below1'-0" height) including pit making (60cmX60cmX60cm), filling the pit with appropriate soil media, manure and fertilizers as per specifications. | Nil30 | 20 | EA |
21 | 210 | Shrub Planting with Thuja etc.\nLong Text:\nShrub Planting: Supplying and planting ofornamental shrub (below 1'-0" height) including pit making (60cmX60cmX60cm), filling the pit with appropriate soilmedia, manure and fertilizers as per specifications. | Nil31 | 20 | EA |
22 | 220 | Bed Planting:\nLong Text:\nBed Planting: Supplying& planting of seasonal flowers Dahlia/Chrysanthemum/Gladiolus/rose/salvia/inca/ calendula/ petunia/sunflower/celosia/zinnia/vinca/gerbera/hibiscus on the ground (bedplanting, bed size 45cmx45cmx45cm)including the preparation of the soil,providing organic manure and fertilizer,pesticides as per specification andnecessary maintenance for a period of 4 months from the date of planting complete as specified and directed. | Nil32 | 5000 | EA |
23 | 230 | Brick Edging\nLong Text:\nEdging with brick works: Edging with bricks laid dry length wise including excavation, refilling, consolidating with hand packing and spreading neatly surplus earthwithin a lead of 50 m 75 class designation | Nil33 | 400 | M |
24 | 240 | Bamboo\nLong Text:\nSupply of whole length 'Bholuka' bamboo at site including carriage. | Nil34 | 20 | EA |
25 | 250 | Manure\nLong Text:\nDump manure: Supply & stacking of dump manure at site including royalty & carriage with all required leads & lifts etc. complete, as per site requirement & as directed by the EIC.(Manure measured instakes will be reduced by 8% for payment). | Nil35 | 10 | M3 |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail